B 0.2 A 0.2 Bore size [mm] A [mm] B [mm] Hexagon socket head cap screw 12 (10 x 2) 52 11 M3 x 0.5 16 (12 x 2) 57 11 M4 x 0.7 20 (16 x 2) 75 14 M4 x 0.7 25 (20 x 2) 84 17 M5 x 0.8 32 (25 x 2) 98 21 M6 x 1.0 40 (32 x 2) 107 27 M8 x 1.25 50 (40 x 2) 135 37 M8 x 1.25 63 (45 x 2) 146 40 M10 x 1.5 80 (56 x 2) 184 50 M12 x 1.75 100 (71 x 2) 219 62 M14 x 2 7.
Calculate the moment of inertia for A and B separately as shown in the figures on the right. A part B part Procedure Calculation Calculation example 1. Check the operating conditions, dimensions of attachment, etc. Operating model: MHY2-16D Opening time: 0.15 s a = 40 (mm) b = 7 (mm) c = 8 (mm) d = 5 (mm) e = 10 (mm) f = 12 (mm) A part a b c B part e f d 2.
Maximum manufacturable stroke (mm) Bore size (mm) Standard stroke (mm) 10 50, 100, 150, 200, 250, 300 500 15 50, 100, 150, 200, 250, 300, 350, 400, 450, 500 750 25 100, 150, 200, 250, 300, 350, 400, 450, 500, 550, 600 1200 The stroke is available in 1 mm increments with the maximum stroke as the upper limit. For a stroke in the standard stroke range, suffix the part number with -XB10.
Maximum manufacturable stroke (mm) Bore size (mm) Standard stroke (mm) 10 50, 100, 150, 200, 250, 300 500 15 50, 100, 150, 200, 250, 300, 350, 400, 450, 500 750 25 100, 150, 200, 250, 300, 350, 400, 450, 500, 550, 600 1200 The stroke is available in 1 mm increments with the maximum stroke as the upper limit. For a stroke in the standard stroke range, suffix the part number with -XB10.
Standard Stroke Maximum manufacturable stroke (mm) Bore size (mm) Standard stroke (mm) 10 50, 100, 150, 200, 250, 300 500 15 50, 100, 150, 200, 250, 300, 350, 400, 450, 500 750 25 100, 150, 200, 250, 300, 350, 400, 450, 500, 550, 600 1200 The stroke is available in 1 mm increments with the maximum stroke as the upper limit.
Adjustment bolt b CRA1 Adjustment bolt d CRQ2 q First adjust both rotation end positions. Apply pressure to ports A and C to adjust adjusting bolt b. Apply pressure to ports B and D to adjust adjusting bolt a. Lock the bolts with fixing nuts after adjustment. w Next, apply pressure to ports A to D to adjust the center position. Loosen the fixing nuts for adjusting bolts c and d.
B dimension is 77.5 mm. Example Calculation:25, B dimension 27.5 mm (without switch) 27.5 (B dimension) + 50 (st) = 77.5 (mm) 2 Series CQSY Mounting bracket dimensions are the same as those of the anti-lateral load type of Series CQSS.
B A Through-hole (Standard) Both ends tapped style RHC Note 1) Since 12 uses a common tube for both A and B, only B is used for part no. denotation.
CKQ CLKQ B B B B B B A 14 49 B B A 14 49 B A 14 49 B A 7 42 A 10 45 A 11.5 46.5 A 11 46 19 or more 17 or more 33 or more 27 or more 28 or more 27 or more 22 or more 30 or more 22 or more 17 or more 54 or more 52 or more Auto Switch Mounting Height Atmosphere General use Mounting Rail mounting Rail mounting Welding Direct mounting D-A7 D-A80 D-A7H D-A80H D-F7BAL D-F7W D-J79W D-F7NTL D-F79F
Insert the switch into the switch case, and install switch holder B into the first groove (MRHQ20/25) or the second groove (MRHQ10/16) and secure the switch.
This is a legacy product. Please contact us for the latest version.sales@ocaire.com
Hs A B A B Proper Auto Switch Mounting Position (mm) D-A7H, A80H, A73C, A80C D-F7, F7V, F79F, J79 D-J79C, F7W, F7WV D-J79W, F7BAL, F7BAVL D-A7 D-A80 D-F7NTL D-A79W Bore size (mm) B B A A B A B A 32 3 11 51 43 6 46 5.5 45.5 40 5.5 13.5 49.5 57.5 8.5 52.5 8 52 50 19 11 53.5 61.5 14 56.5 13.5 56 63 22 14 59 67 17 62 16.5 61.5 Auto Switch Mounting Height (mm) D-A7H, A80H D-F7, J79, F7W D-J79W
+ Stroke K A + Stroke M G J W 16 Minimum lead wire bending radius 10 Auto switch Q F 4 x N through H thread effective depth C 2 x M3 x 0.5 (Port size) I D M E Z L B + Stroke K A + Stroke M G J W Standard [mm] Bore size Stroke range Without magnet for auto switch With magnet for auto switch C D E F G H I J K L M N Q W Z A B A B 12 5 to 30 19.5 16 23 19.5 6 6 23 4 21.5 M3 x 0.5 26 1.5 5 3.5
Operating equipment: MHC2-6D A part a b c d e f = 20 (mm) = 3 (mm) = 4 (mm) = 4 (mm) = 5 (mm) = 6 (mm) b c a e B part f d z f1 x.Calculate the inertial moment of the attachment. Assuming the attachment material is aluminium alloy (relative density=2.7), r1= 16.4 (mm).
Operating equipment: MHC2-6D A part a b c d e f = 20 (mm) = 3 (mm) = 4 (mm) = 4 (mm) = 5 (mm) = 6 (mm) b c a Courtesy of Steven Engineering, Inc.-230 Ryan Way, South San Francisco, CA 94080-6370-Main Office: (650) 588-9200-Outside Local Area: (800) 258-9200-www.stevenengineering.com e B part f d z f1 x.Calculate the inertial moment of the attachment.
How to Order B 32 30 D C CQ2Y Standard B F9BW S 32 30 D C CDQ2Y With auto switch Number of auto switches With auto switch (Built-in magnet) 2 pcs. 1 pc. n pcs.
8.5 4.5 46 17 17 1.5 62 156 (189): With auto switch 144 (177): Without auto switch 212 (245): With auto switch 200 (233): Without auto switch 236 (269): With auto switch 224 (257): Without auto switch The dimensions above show pressurization to B port.