This is a legacy product. Please contact us for the latest version.sales@ocaire.com
Magnet: Built-in, Mounting: Rear Flange, Style: Aluminum Tube, Bore Size: 100mm, Thread: NPT, Stroke: 100mm, Option: N [w/o Rod Boot, w/o Cushion (Not Valid for Air-hydro), Lock Operation: E [Spring Lock (Lock Exhaust)], Auto Switch: M9P--Solid State, Gen. Purpose, 3 Wire PNP, Horizontal, Lead Wire or Prewied Connector: 0.5m Cord Length, M8-3 Pin Connector, Number: -
Magnet: Built-in, Mounting: Rear Flange, Style: Aluminum Tube, Bore Size: 80mm, Thread: NPT, Stroke: 100mm, Option: N [w/o Rod Boot, w/o Cushion (Not Valid for Air-hydro), Lock Operation: E [Spring Lock (Lock Exhaust)], Auto Switch: M9P--Solid State, Gen. Purpose, 3 Wire PNP, Horizontal, Lead Wire or Prewied Connector: 0.5m Cord Length, M8-3 Pin Connector, Number: -
Magnet: Built-in, Mounting: Axial Foot, Style: Aluminum Tube, Bore Size: 100mm, Thread: NPT, Stroke: 100mm, Option: N [w/o Rod Boot, w/o Cushion (Not Valid for Air-hydro), Lock Operation: E [Spring Lock (Lock Exhaust)], Auto Switch: M9P--Solid State, Gen. Purpose, 3 Wire PNP, Horizontal, Lead Wire or Prewied Connector: 0.5m Cord Length, M8-3 Pin Connector, Number: -
This is a legacy product. Please contact us for the latest version.sales@ocaire.com
Head Flange: CG3GN Bore size Stroke With rubber bumper Width across flats KA GA GB 4 x FD 8 x J 2 x P F R0.5 H1 0 E 0.05 MM D FX 0.15 0 E 0.05 I B C Corner of the cover (20 to 63) H A AL Width across flats B1 Width across flats NA F FT C FX 0.15 S + Stroke ZZ + Stroke B End boss is machined on the flange for E.
Note 3) Bore size determination E Es NG Determination of allowable stroke (W + WB) V 2 E = x ( ) 2 1000 E Es Note 2) OK Determination of pressure (P) when making intermediate stop Review of order made products based on operating conditions P Ps DNote 1) This cylinder cannot perform an intermediate stop using an air pressure circuit in vertical operation.
(Fig. 1-2) w Bend the reinforcing plate on the nut (M3) side, as shown in Fig. 1-3. e Pass the clip of the switch holder (a) through the square hole in the side of the reinforcing plate that was not bent in step w. (Fig. 1-4 and Fig. 1-5) r Place the switch holder on the cylinder tube in the state of step e. t Wrap the band around the cylinder tube.
9 @2 @0 @1 e w !5 !6 !3 !2 !1 !0 q t r i S u y o !4 !8 !
C D A B Side support B MY-SB 2 x J MY1B MY1B MY1H E A B MY1B C D MY1M (mm) MY1C A 61 70 87 B C D E F G H J Part no.
Z A + Stroke B + Stroke L W E M K J 2 x P (Rc, NPT, G) (Port size) 100 Auto switch Minimum lead wire bending radius 10 H thread effective depth C 4 x N through F Q I E M Z A + Stroke B + Stroke L W G M K J Standard [mm] Bore size Stroke range Without magnet for auto switch With magnet for auto switch C D E F G H I J K L M N P Q W Z A B A B 50 10 to 50 37 29 42.5 34.5 15 18 57 9 M10 x 1.5
, depth OL WA Z XAH9 XB Section XX Section XX XA XL XC HA: T-slot for hexagon bolt Section XX details X 0.02 R T X 0.02 DB DA H VA VB U X PW b a e d c T-slot dimensions 2 x P XAH9 depth XL 2 x P (Plug) XAH9 depth XL S Q G J K PB GB GA [mm] FA PA + Stroke Bore size [mm] a b c d e FB A + Stroke B + Stroke C + Stroke 32 6.5 10.2 5.5 3.5 9.5 40 6.5 10.5 5.5 4 10 50 8.5 12.5 7.5 4 12.5 E The
BMA3-050S (A set of a, b, c, e) BMA3-063S (A set of a, b, c, e) Auto switch Switch bracket (Resin) Transparent (Nylon)Note 1) d e White (PBT) c Switch holder b Auto switch mounting screw a * Band (a) is mounted so that the projected part is on the internal side (contact side with the tube).
Determination of load's kinetic energy (E) E > Es E Es Determination of bore size Review of larger bore size E = m E 2 a ( ) 2 = (Refer to page 1548.) 1000 P Ps P > Ps Determination of pressure for intermediate stop (p) (Refer to page 1548.)
Wn Mass mn X-axis xn xa xb xc xd Y-axis yn ya yb yc yd Z-axis zn za zb zc zd X 1 mt = x (mn x xn)w Wa Wb Wc Wd ma mb mc md Y 1 mt = x (mn x yn)e D1 mt = x {mn x (A + zn)} r Z -X (n = a,b,c,d) Refer to the following sections 1 to 4 to calculate the center of gravity and the total load.
2 r w u e !5 y !9 u t MDHR3 !4 !3 q !1 @0 @1 w o e i !5 MHZ MHF r !7 !6 t !8 !0 !2 i !9 y u MHL Component Parts MHR MHR Description Material Description Material Note No. Note No.
9 e r t q !3 w !0 @3 @2 !1 !2 !5 !4 y u i o @1 @0 !8 !6 Component Parts Component Parts Qty. No. Description Material Note No.
9 e r t q !3 w !0 @3 @2 !1 !2 !5 !4 y u i o @1 @0 !8 !6 Component Parts Component Parts Qty. No. Description Material Note No.
The tightening torque of the M3 screw must be 0.35 to 0.45 Nm. t The detection position can be changed under the conditions in step e. Auto switch y Confirm where the mounting position is, and tighten the auto switch fixing screw (M2.5) to fix the auto switch mounting nut. The tightening torque of the M2.5 screw must be 0.25 to 0.35 Nm.