SMC Corporation of America
Elite Part Number Search
Search Results "LVM102R-5C-2-KO"

MQRF2-M5) * flange: MQR12-F (for MQRF12 M5) * 45 * 37 0.03 4.5 * 4-3.5 mounting hole * 4-3.5 mounting hole 3 +0.1 0 depth 10 2-M3 x 0.5 thread length 6 P.C.D.29 44h8 (10 from end) 35h8 (10 from end) 20h8 8.2 x 3 = 24.6 P = 8.2 2 70 *5 (55) 13 15h8 4-M5 x 0.8 10 counter bore depth 1.5 50 2 8.2 26 1 2 (34) 1 2 3 4 2 1 8-5 x 0.8 10 counter bore depth 1.5 14 *5 27 6.5 3.5 6.5 3.5 15H8 (8) 20H8

(A) 2 3 (R) VlA VH300 / 400 5 6 VM/VR 4 3 VH 1 8 7 4 (B) 3 (R) 1 (P) 2 (A) 2 VH600 6 5 4 1 7 1 (P) 2 (A) 4 (B) 2 3 (R) Component Parts Material VH200/300/400 Zinc die cast Aluminium die cast VH600 Cast iron Description No.

6 $2 #2 !3 #3 !7 !2 @5 @4 r @3 e @6 @1 @2 #1 t y $1 u w q E' Section E-E' CYV32 t !9 $0 @1 @2 y @4 @3 u @6 #9 @5 Description Material Note Parts list Description Material Note No. No.

supply voltage of 24V Minimum load impedance: 50 Voltage output Analog output Note 3) Current output Hysteresis mode Hysteresis Variable Window comparator mode 3 1/2-digit, 7-segment indicator, 2-color display (red and green) Sampling cycle: 5 times/s 2% F.S. 2 digits (25C) 2% F.S. 1 digit (25C) Lights up when output is ON (Green) 2% F.S. or less (based on 25C) IP40 Operating: 0 to 50C;

(Including Nut, Screw, (Spacer)) Cylinder series Bore size 12 16 20 25 32 40 50 63 80 100 125 140 160 CQ2 BQ-1 BQ-1 BQ-1 BQ-1 BQ-2 BQ-2 BQ-2 BQ-2 BQ-2 BQ-2 BQ-2 BQ-2 BQ-2 MU BMU1-025 BMU1-025 BMU1-025 BMU1-025 BMU1-025 MK/MK2 BQ-1 BQ-1 BQ-2 BQ-2 BQ-2 BQ-2 6 Series D-M9K/D-7K/D-RK How to Mount and Move the Auto Switch D-Y7K Mounting Bracket Tie-rod Mounting Type

Note 2) The maximum operating pressure is the value at 20C. Refer to the operating pressure curve for other temperatures.

Also, when the pipe tape is used, leave 1.5 to 2 thread ridges exposed at the end. Wrapping direction Pipe tape Expose approx. 2 threads Excessive tightening may damage the thread portion or deform the gasket and cause air leakage. 15-1-10 4 Fittings & Tubing Precautions 2 Be sure to read before handling.

KP Series (with resin thread) 1) Winding of sealant tape Wrap the pipe tape 2 to 3 times around the threads, leaving 1.5 to 2 thread ridges exposed at the end of the threads. 2) Tightening After tightening by hand, tighten an additional 2 to 3 turns using a tightening tool. 2.

Port R Operating Fluid and Ambient Temperature Operating fluid temperature (C) (3) Vacuum Ambient temperature (C) Temperature conditions Air (Standard) Oil (Standard) (V) Port P Port A Maximum Minimum 60 5 (1) 40 5 40 40 5 5 (2) Note 1) Dew point: 5C or less Note 2) 500 cSt or less Note 3) V in parentheses is option symbol. Option Material No.

<* 1 LVA Orifice size 1 2 3 4 5 6 77 6 6 0 6 LVH Rated voltage 1 2 3 4 7 8 ,, 9= 5,'., ?