SMC Corporation of America
Elite Part Number Search
Search Results "ISE20CH-Y-N02L-WA3"

Connect the copy source flow monitor and the copy destination flow monitors with copy lead wire (ZS-40-Y), and turn on the power supply. The copy source flow monitor is the flow monitor from which the setting is copied. The copy destination flow monitor is the flow monitor to which the setting is copied.

Effective detection distance 50mm or less Ambient temperature 0 to +50oC Ambient humidity 35 to 85 % Rh (No dew condensation) Material Sensor body: Aluminum Vibration resistance Endurance 50Hz Amplitude 1mm 2 hours to X,Y,Z each direction of vibration Impact resistance 10G Weight (g) 150 4. Installation 4-1.

M12 M12 ( ( ( ( ) ) ) ) (WS (WS (WS (WS VS) VS) VS) VS) (WZ (WZ (WZ (WZ VZ) VZ) VZ) VZ) (WZ (WZ (WZ (WZ VZ) VZ) VZ) VZ) 8 SGC200*-OMJ0004-A SGC/SGH Series SGC/SGH Series SGC/SGH Series SGC/SGH Series/ / / / M12 M12 M12 M12 IP65() M12 IP65() (0.40.6Nm) IP65 30N IP65 M12 M12 M12 M12 ) M12 M12 M12 M12 M12 (4.5~7) IP65() 4.57()JIS C 3306 0.51.5mm 22 ,3 O JIS C2805 R1.25-3 Y

Table 3-9 Setting list of the external switch y Item Initial value (Default setting) Example Reference Displa page Category Communication mode LOC LOC Contact input signal 1 RUN SW_A Contact input signal 1 type ALT ALT Contact input/output communication Contact input signal 1 delay timer (time delay) of 0 0 reading Contact input signal 1 OFF detection timer 0 2 5.18 Communication setting

Y-strainer Rc1/2 #500 to 1000 Install either the strainer or filter. If foreign objects with a size of 20 m or more are likely to enter, install the particle filter. 2 Filter Rc1/2 20m HRS-PF003 3 Flow meter 0 to 50L/min 4 Pressure gauge 0 to 1.0MPa 5 Others (pipe, hose, etc.) 15 or more Y-strainer Rc1/2 #1000 Install either the strainer or filter.

Maintain the ON condition for 300ms or longer. 300ms 300ms ON Run/stop signal input Momentar y OFF Run Product condition Stop 2.5 Contact input signal HRS090 Series 2-16 HRX-OM-T004 Chapter 2 Contact input/output communication 3) Remote signal input (Signal type: Alternate) The product becomes DIO REMOTE while the input signal from the customer is ON.

Name Size Material 1 Valve Rc3/4 Stainless steel 2 Y-strainer (100m) Rc3/4 Stainless steel 3 Valve Rc1/2 Stainless steel 4 Y-strainer (5m) Rc1/2 Stainless steel 3.3 Procedure for Installation HRZ Series 3-16 HRX-OM-X010 Chapter 3 Transporting and Installation No thermal insulator is assigned to facility water circuit.

Nov y yy Zy Ay By Cy Dy . Danger In extreme conditions, there is a possibility of serious injury or loss of life. When the circulating fluid temperature is low, do not operate it at a low 500 500 flow rate. It may freeze circulating fluid in the product when used at low temperature and low flow rate.

H 4 S y m b o l Initial power/ Power consumption (W) 100 VAC 600/150 800/220 1200/350 200 VAC 2400/150 3200/220 4800/350 Heater assembly number XLA25-60S-2 XLA25-60S-2 XLA25-60S-2 No. of heater assemblies 2 pcs. 3 pcs. 4 pcs.

power -General rules relating to systems IEC 60204-1: Safety of machinery -Electrical equipment of machines (Part 1: General requirements) ISO 10218-1992: Manipulating industrial robots -Safety JIS B 8370: JIS B 8361: JIS B 9960-1: 1 ) JIS B 8433-1993: *2) 1. 2. 3. 2 XL-OMV0002 1. 2. 3. 4., / 1 1.5 *3) *3)1 1 () 3 XL-OMV0002 1.1 A6063SUS316LSUS304 FKM XLC-80,XLC-100,XLC-160 :Y-VAC2

H 4 S y m b o l consumption (W) 100 VAC 200/40 Initial power / Power 200 VAC 800/40 Heater assembly number XLA25-60S-1 XLA25-60S-2 No. of heater assemblies 1 pc. 1 pc. H 5 100 VAC 200/40 400/70 Initial power / Power consumption (W) 200 VAC 800/40 1600/80 Note 1) Initial power and power consumption are nominal values. The heaters are PTC thermistor type design.

In addition, the seal material sliding part for vacuum is applied vacuum grease (Y-VAC2). Use fluids those are compatible with using materials after confirming. 2. Fluctuation of each voltage should be +/10% or less. Selection Caution All models 1. Keep within the specified range of the pilot pressure. 2.

Y Special construction. J Applicable to 6. sign "N", "N7", "X", "X7", "Z", "E1" ,"E2" or "E7". Y Special construction. 64 7 ND90 71 en INTELLIGENT VALVE CONTROLLER ND7000 1. 2. 3. 4. 5. 6. 7. *) 8. 9. ND 7 1 03 H X T / I02 1. PRODUCT GROUP 6.

Lubrication Non-lube Mounting orientation Vertical downward, Vertical upward Amplitude or acceleration: 1.5 mm or 3 G Frequency: 5 Hz to 100 Hz Direction: X,Y,Z 3 times each Sweep time, sweep cycle: 12 min10 cycle (De-energized) Vibration resistance Acceleration: 15 G Duration of shock pulse, Pulse shape: 11 ms, sinusoidal waveform Direction: X,Y,Z 3 times each (De-energized) Impact resistance

CEU5 CE1 CEU5 CE1-R 23m 9 CE1 CE1-R*CE1 () () CE1 CE1-RC C () CE1 CE1-ROOC CE1-RO5 CE1-R10 CE1-R15 CE1-R20 CE1-R*C 3. 3-1 1.5MPa 1.0MPa 12 2063 0.07MPa 0.05MPa 70500mm/s 060 2585RH 1220 3263 mm 010 016 122032 405063 12 20 3263 2 1 0.8 JIS B0209 3-2 76 *1 23 14.5mT DC12VDC24V(10) 1 40mA 0.1mmCEU5 *2 (20) 0.2mm Max DC24V,40mA A /B DC500V50M12E 33.3Hz 6.8G X,Y

Z 2 10G X,Y,Z 350g *1) CEU5 ,8 <> *2) 100kHz <>,, 7 - CEU5 90 A /B 90 100kHz ,A /B A +12V 10% A B +12V 10% B B C D A E F G H A : 2.5 sec E : 5 sec B : 2.5 sec F : 5 sec C : 2.5 sec G : 5 sec D : 2.5 sec H : 5 sec UPDOWN UP ,,DOWN , 100kHz ,UP.DOWN UP +12V 10% A DOWN DOWN +12V 10% B C B A A : 5 sec C : 5 sec B : 5 sec ,CEU5 (78 ) CEU5 , 23m ,, CEU5 (DC12V,60mA)DC12V

[Proof Vibration : 1055Hz, range 0.75mm, x, y, z each axis for 2 hours] 7-2 Wiring 7-2-1 The Connection of Power Supply Power Supply Specification : AC100V15% (AC85VAC115V), 50/60Hz DC24V10%, 0.4A Use wire with 0.75mm2 or more in the diameter of wire sectional area and twist it.

[Proof vibration: 10~55Hz, range 0.75mm, x, y, z, each axis for 2 hours] 9-2 Wiring 9-2-1 The Connection of Power Supply Power Supply Speciation : AC100V15% (AC85V~AC115V), 50 / 60Hz DC24V10%, 0.4A Use wire with 0.75mm2 or more in the diameter of wire sectional area and twist it.

Internal structure and parts description Size 10,15 Size 20,30,40 Basic circuit of the rotary actuator Circuit structure Recommended equipment M o u n t i n g Restriction of the load to axis Operati on of axi s fi tti ng ref erri ng Flange application Piping and operating direction Operating ai r Setting rotation time I n e r t i a m o m e n t K i n e t i c e n e r g y

Adjust the position of the center of gravity with the robot controller. duAro Flange mounting surface X Y Z Center of gravity X Y Z 0.1 0.8 44.7 12 - 4. Product Specifications Warning 1. Install and operate the product only after reading the Operation Manual carefully and understanding its contents. Also, keep the manual where it can be referred to as necessary. 2.