L2 L1 xStatic moment Examine M2. Since M1 & M3 are not generated, investigation is unnecessary. M2 = W L1 = 10 0.05 = 0.5 [Nm] 2 = M2/M2 max = 0.5/16 = 0.031 W = 1 [kg] = 10 [N] W M Find the value M2 max when Va = 300 mm/s from Graph (3).
This is a legacy product. Please contact us for the latest version.sales@ocaire.com, VACUUM EJECTOR, COMPACT, VACUUM SERIES, ZA COMPACT VACUUM EJECTOR, AG, ZA NOZZLE SIZE 0.5, 2.64554 lb
This is a legacy product. Please contact us for the latest version.sales@ocaire.com, VACUUM EJECTOR, COMPACT, VACUUM SERIES, ZA COMPACT VACUUM EJECTOR, AG, ZA NOZZLE SIZE 0.5, .00000 lb
This is a legacy product. Please contact us for the latest version.sales@ocaire.com, VACUUM EJECTOR, COMPACT, VACUUM SERIES, ZA COMPACT VACUUM EJECTOR, AG, ZA NOZZLE SIZE 0.5, 2.64554 lb
L1 M2 = m g (L1 + B) 103 2. Static moment m x g = 1 9.8 (50 + 48) 103 Review M2. Since M1 & M3 are not generated, review is unnecessary. = 0.96 [Nm] 2 = M2/M2 max = 0.96/4 = 0.24 M Guide shaft mounting surface L1 B We = 5 x 103 m g U = 5 x 103 1 9.8 300 = 14.7 [N] Me3 = 1/3 We (L2 + A) 103 3.
Static moment M2 = m g (L1 + B) 103 m x g = 1 9.8 (50 + 48) 103 Review M2. Since M1 and M3 are not generated, review is unnecessary. = 0.96 [Nm] 2 = M2/M2 max = 0.96/4 = 0.24 M Guide shaft mounting surface L1 B We = 5 x 103m g U = 5 x 103 1 9.8 300 = 14.7 [N] Me3 = 1/3 We(L2 + A) 103 3.
Static moment M2 = m g (L1 + B) 103 m x g = 1 9.8 (50 + 48) 103 Review M2. Since M1 and M3 are not generated, review is unnecessary. = 0.96 [Nm] 2 = M2/M2 max = 0.96/4 = 0.24 M Guide shaft mounting surface L1 B We = 5 x 103m g U = 5 x 103 1 9.8 300 = 14.7 [N] Me3 = 1/3 We(L2 + A) 103 3.
L1 M2 = m g (L1 + B) 103 2. Static moment m x g = 1 9.8 (50 + 48) 103 Review M2. Since M1 & M3 are not generated, review is unnecessary. = 0.96 [Nm] 2 = M2/M2 max = 0.96/4 = 0.24 M Guide shaft mounting surface L1 B We = 5 x 103 m g U = 5 x 103 1 9.8 300 = 14.7 [N] Me3 = 1/3 We (L2 + A) 103 3.
Static moment M2 = m g (L1 + B) 103 m x g = 1 9.8 (50 + 48) 103 Review M2. Since M1 & M3 are not generated, review is unnecessary. = 0.96 [Nm] 2 = M2/M2 max = 0.96/4 = 0.24 M Guide shaft mounting surface L1 B We = 5 x 103 m g U = 5 x 103 1 9.8 300 = 14.7 [N] Me3 = 1/3 We (L2 + A) 103 3.
Static moment M2 = m g (L1 + B) 103 m x g = 1 9.8 (50 + 48) 103 Review M2. Since M1 & M3 are not generated, review is unnecessary. = 0.96 [Nm] 2 = M2/M2 max = 0.96/4 = 0.24 M Guide shaft mounting surface L1 B We = 5 x 103 m g U = 5 x 103 1 9.8 300 = 14.7 [N] Me3 = 1/3 We (L2 + A) 103 3.
Static moment M2 = m g (L1 + B) 103 m x g = 1 9.8 (50 + 48) 103 Review M2. Since M1 and M3 are not generated, review is unnecessary. = 0.96 [Nm] 2 = M2/M2 max = 0.96/4 = 0.24 M Guide shaft mounting surface L1 B We = 5 x 103m g U = 5 x 103 1 9.8 300 = 14.7 [N] Me3 = 1/3 We(L2 + A) 103 3.
Dimensions 2-M2 x 3 (Countersunk head Phillips screw for precision instruments) 2-M2 x 3 (Cross recessed head machine screw for precision instruments) 2-M3 x 8 (Bolt with hex. hole) 2-M2 x 5 (Bolt with hex. hole) MXP10/12/16 MXP6 Applicable size Switch rail part no.
MHCM2-7S D8.3 205.2 2-M2 x 0.4 thread (Mounting thread) 2-M2 x 0.4 depth 4 (Mounting thread) 2.5 2 1.5 When open 20 When closed 7 10 6 4.5 15 11 7.7 1.8 16.5 6 100.05 (23) M3 x 0.5 (Finger closing port) 2-M2 x 0.4 thread (Attachment mounting thread) 4 0 0.03 3 12-8-23
Static moment M2 = WL1 = 100.05 = 0.5 [Nm] 2 = M2/M2max = 0.5/16 = 0.031 W = 1 [kg] =10 [N] Investigate M2. Since M1 & M3 are not generated, investigation is unnecessary. Find the value of M2max when Va = 300mm/s from
MHCM2-7S D8.3 205.2 2-M2 x 0.4 thread (Mounting thread) 2-M2 x 0.4 depth 4 (Mounting thread) 2.5 2 1.5 When open 20 When closed 7 10 6 4.5 15 11 7.7 1.8 16.5 6 100.05 (23) M3 x 0.5 (Finger closing port) 2-M2 x 0.4 thread (Attachment mounting thread) 4 0 0.03 3 12-8-23
= d x e x f x Relative density m2 = 4 x 5 + 6 x 2.7 x 10-6 = 3.24 x 10-4 (kg) Inertial moment around Z2 axis IZ2 = {m2 (d2 x e2) / 12} x 10-6 IZ2 = {3.24 x 10-4 x (42 + 52) / 12} x 10-6 = 1.11 x 10-9 (kg.m2) = 1.11 x 10-9 + 3.24 x 10-4 x 23.52 x 10-6 = 0.18 x 10-6 (kg.m2) Inertial moment around Z axis IB = IZ2 x m2r22 x 10-6 IB Thus, the total inertial moment is I = IA x B I = 0.20 x 10
Dimensions Vacuum suction 2-M2 x 3 (Counter sunk Phillips screw for precision equipment) 2-M2 x 3 (Round head Phillips screw for precision equipment ) Relief port Cover installed in end cap section Vacuum suction Relief port 11-MXP 2-M3 x 8 (hexagon socket head screw) 2-M2 x 5 (hexagon socket head screw) MXP10, 12, 16 MXP6 Note Applicable size Switch rail model MXP 65 MXP-AD 65 MXP 6-10 MXP10
Static moment M2 = WL1 = 100.2 = 2 [Nm] 2 = M2/M2 max = 2/16 = 0.125 W = 1 [kg] = 10 [N] W Review M2. Since M1 & M3 are not generated, review is unnecessary. M L1 3. Dynamic moment We = 5 x 10-3WgU = 5 x 10-31.9.8500 = 25 [N ] Me3 = 1/3We(L2-A) = 1/3250.182 = 1.52 [Nm] 3 = Me3/Me3max = 1.52/6 = 0.25 Me3 Review Me3. (For Memax, find the value in
As a guide, when W + P0a>P0A, adjust P1 to make W + P1a = P0A. W: Load (N) P0: Operating pressure (MPa) P1, P2: Reduced pressure (MPa) a: Rod side piston area (mm2) A: Head side piston area (mm2) D-X 1241 Smooth Cylinder Specific Product Precautions 2 Be sure to read before handling.
L1 L2 L2 Main circuit power supply L3 L3 Regenerative converter N P1 P2 N DC reactor Connect between P1 and P2. (Connected at time of shipping.) P1 Control Circuit Power Supply Connector: CNP2 Accessory P2 Terminal name Function Function details P P C D L11 L21 Connect between P and D. (Connected at time of shipping.)