300 100 MI W S 100 300 Speed (mm/s) Speed (mm/s) Speed (mm/s) 300 300 CEP1 Max. 500 mm/s of high speed transfer is possible.
DI-1 Program Description SPN (1000) STA (200) STB (300) MOV (1000) TIM (100) MOV (2000) STOP Speed (Motor speed) Acceleration time constant Deceleration time constant Absolute move command Dwell command time Absolute move command Program end 1000[r/min] 200[ms] 300[ms] 1000[10STMm] 100[ms] 2000[10STMm] a) b) c) d) e) f) b) Acceleration time constant (200ms) c) Deceleration time constant (
31 63.5 13.5 E-100 4H10depth5 5 (26) (44) 110 100 Stroke69 (Stroke+131) 10 92 85 (For 100 to 150 strokes) 208 (For 200 to 1000 strokes) C section detail (S=2/1) 12 3 500 12 3 450 10 2 400 10 2 350 8 1 300 8 1 250 6 0 200 6 0 150 6 0 100 Stroke F E Stroke F E Dimension table 1) The motor mounting plate and coupling are attached but no motor, controller, driver, motor cable and encoder cable
Terminal name Details 1 L+ +24 V 2 NC N/A 3 L 0 V 4 C/Q IO-Link signal 145 DIN rail mounting adapter LEC-3-D0 * With 2 mounting screws Conversion cable P5062-5 (Cable length: 300 mm) This should be used when a DIN rail mounting adapter is mounted onto a screw mounting type controller afterwards. 300 DIN rail AXT100-DR* For , enter a number from the No. line in the table on page 603-8.
N.O. 4-position dual 3-port valve (C) 4 2 1 5 3 N.C.
speed mm/s Piston speed mm/s 4 CY1F/m1 5 CY1F/m2 6 CY1F/m3 7 CY1F/m4 30 30 30 30 20 20 20 20 CY1F25 CY1F25 CY1F25 CY1F25 10 10 10 10 CY1F15 CY1F15 CY1F15 5 5 5 5 Load mass kg Load mass kg Load mass kg Load mass kg 4 4 4 4 3 3 3 3 CY1F15 CY1F10 CY1F10 CY1F10 2 2 2 2 CY1F10 1 1 1 1 0.5 500 300 100 50 0.5 500 300 100 50 0.5 500 300 100 50 0.5 500 300 100 50 Piston speed mm/s Piston speed mm
N.O. 4-position dual 3-port valve (C) 4 2 1 5 3 N.C.
mm/s Piston speed mm/s Piston speed mm/s (4) CY1F/m1 (5) CY1F/m2 (6) CY1F/m3 (7) CY1F/m4 30 30 30 30 20 20 20 20 CY1F25 CY1F25 CY1F25 CY1F25 10 10 10 10 CY1F15 CY1F15 CY1F15 5 5 5 5 Load mass kg Load mass kg Load mass kg Load mass kg 4 4 4 4 3 3 3 3 CY1F15 CY1F10 CY1F10 CY1F10 2 2 2 2 CY1F10 1 1 1 1 0.5 500 300 100 50 0.5 500 300 100 50 0.5 500 300 100 50 0.5 500 300 100 50 Piston speed mm
300 100 50 0.5 500 300 100 50 Piston speed mm/s Piston speed mm/s Piston speed mm/s Piston speed mm/s 8-16-7 7 Series CY1F Vertical Actuation 1.
C J G5-S CV Maintenance Snap Ring Installation/Removal Caution Caution MVGQ 1. For installation and removal, use an appropriate pair of pliers (tool for installing a type C snap ring). 2.
C J G5-S CV Maintenance Snap Ring Installation/Removal Caution Caution MVGQ 1. For installation and removal, use an appropriate pair of pliers (tool for installing a type C snap ring). 2.
.-230 Ryan Way, South San Francisco, CA 94080-6370-Main Office: (650) 588-9200-Outside Local Area: (800) 258-9200-www.stevenengineering.com VT VP VG VP S070 VQ VKF VQZ VZ VS VFN Coil temperature rises: 1C (With power saving circuit) Sonic conductance C: 0.037 (Standard)/C: 0.076 (Large flow capacity) Series Flow characteristics C[dm3/(s bar)] b Cv Standard Large flow capacity V14 V14A 0.037
C A D Model D C Model D C Mounting bolt (mm) Mounting bolt (mm) M18 x 125 l M18 x 135 l 125 135 C (D) Q2B18010DC C (D) Q2B20010DC M18 x 135 l M18 x 145 l 135 145 C (D) Q2B18020DC C (D) Q2B20020DC M18 x 145 l M18 x 155 l 145 155 C (D) Q2B18030DC C (D) Q2B20030DC M18 x 155 l M18 x 165 l 36 155 39 165 C (D) Q2B18040DC C (D) Q2B20040DC M18 x 165 l M18 x 175 l 165 175 C (D) Q2B18050DC C (D) Q2B20050DC
D Side support B MY-SB 2 x J A B C D A 61 70 87 B 75 84 105 C D E F G H J Part no.
M N C D 4-O T Q 2-P S U W E B K L AA A R X AB I AP Y + Stroke Z + Stroke J V 8-AF AC AD AE 100 piston rod end connection For standard strokes (mm) Bore size (mm) Stroke range (mm) AC G H AB AF AA AE AD F N M D L C K B J AP I A E 63 80 100 75, 100 125, 150 200, 250 300 15 20 depth 14.5 M16 x 2 depth 28 25 25 50 170 13.5 100 66 140 180 30 135 M12 x 1.75 depth 24 228 117 60 65 200 200 15 20
N.O. 2 2-position double (Rubber) 4-position dual 3-port valve (C) (A) 4 (B) 2 (A) 4 (B) 2 C: Locking type (Manual) Note) C 5 (R1) 3 (R2) 1 (P) 1 (P) 5 (R1) 3 (R2) N.C.
7.4 9.0 7.5/7.7 8.8/9.3 12 14 14/14 15/16 Cv 0.86 0.88 0.80/0.86 1.0/1.0 2.0 2.4 1.9/2.1 2.3/2.4 3.1 3.8 3.5/3.5 3.8/4.0 C [dm3/(sbar)] 2.9 3.2 2.9/3.0 2.7/3.6 6.9 8.8 7.9/7.4 9.2/8.8 12 15 14/13 15/15 Cv 0.83 0.92 0.83/0.83 0.86/0.88 1.7 2.2 1.9/1.8 2.1/2.0 3.1 3.7 3.2/3.2 3.6/3.7 C [dm3/(sbar)] 3.5 4.4 3.5/3.5 4.1/3.9 7.5 9.3 7.4/7.3 9.2/9.1 13 16 14/14 15/15 Cv 0.93 1.1 0.89/0.89 1.0/
Cylinder Speed Chart Bore size Series CS1/CS2 Pressure 0.5 MPa, Load factor 50% Cylinder stroke 300 mm Average velocity (mm/s) System 125 140 160 180 200 250 300 1000 Vertically upward movement Horizontal movement 900 800 700 600 500 400 300 200 100 0 A 800 900 1000 700 600 500 400 300 200 100 0 B 900 1000 800 700 600 500 400 300 200 100 0 C 800 900 1000 700 600 500 400 300 200 100 0 D 800
Standard Strokes Bore size [mm] Standard stroke [mm] Max. manufacturable stroke 32 25, 50, 75, 100, 125, 150, 175, 200, 250, 300 300 40 25, 50, 75, 100, 125, 150, 175, 200, 250, 300 300 45 25, 50, 75, 100, 125, 150, 175, 200, 250, 300 300 50 25, 50, 75, 100, 125, 150, 175, 200, 250, 300, 350, 400 400 56 25, 50, 75, 100, 125, 150, 175, 200, 250, 300, 350, 400 400 63 25, 50, 75, 100, 125, 150
demand = 1000 n/min (N)VBA2, (N)VBA4 C H A R G E C H A R A C T E R I S T I C S NVBA1 C H A R G E C H A R A C T E R I S T I C S Charging time for 10l t(s) Charging time for 10l t(s) Pressure increase ratio (P2/P1) Pressure increase ratio (P2/P1) These graphs illustrate the time required to inrease pressure in a closed tank e.g.