SMC Corporation of America
Elite Part Number Search
Search Results "ISE20B-L-01-A1"

L Speed: V [mm/s] a1 a2 T1 = V/a1 = 300/3000 = 0.1 [s], T3 = V/a2 = 300/3000 = 0.1 [s] Time [s] T = T1 +T2 +T3 +T4 [s] L 0.5 V (T1 + T3) V "T1: Acceleration time and T3: Deceleration time can be obtained by the following equation.

LEC CN5 1 8.9 B1 A1 A1 Cable length (L) 1 3 5 (22.4) A13 B1 1.5 m 3 m 5 m (14.4) L B13 B13 A13 Dot color Dot mark Cable color Connector pin No. Dot color Dot mark Cable color Connector pin No.

5: LEYG16 B M L Lead 5: LEYG16 AB M L Lead 10: LEYG16 AA M L 4.4 4.4 Lead 10: LEYG16 A M L 0 0 600 0 100 200 300 400 500 600 0 100 200 300 400 500 Speed [mm/s] Speed [mm/s] LEYG25 l M LEYG25 Al M L L 33 66 Lead 3: LEYG25 C M L Lead 3: LEYG25 AC M L Vertical work load [lb] Vertical work load [lb] 22 44 Lead 6: LEYG25 B M L Lead 6: LEYG25 AB M L 11 22 Lead 12: LEYG25 A M L Lead 12: LEYG25 AA

l X 140 l M6 X 45 l X 50 l X 55 l X 60 l X 65 l X 70 l X 75 l X 80 l X 85 l X 120 l X 145 l M8 X 50 l X 55 l X 60 l X 65 l X 70 l X 75 l X 80 l X 85 l X 90 l X 125 l X 150 l M10 X 55 l X 60 l X 65 l X 70 l X 75 l X 80 l X 85 l X 90 l X 95 l X 130 l X 155 l M10 X 65 l X 70 l X 75 l X 80 l X 85 l X 90 l X 95 l X 100 l X 105 l X 140 l X 165 l M3 X 25 l X 30 l X 35 l X 40 l X 45 l X 50 l M3

Cable length (L) [m] A1 1 2 5 6 (17.7) (10.2) (14) (18) 1 3 5 8 A B C 1.5 3 5 8 A6 B1 B3 A1 A3 B6 (13.5) 1 2 (5.7) 15 16 Connector B Connector D (30.7) L (11) (14.7) (10) 8 A B C LE-CP/Cable length: 8 m, 10 m, 15 m, 20 m ( Produced upon receipt of order) 10 15 Actuator side Driver side 20 (5.5) (6.3) (5.7) (14.2) Connector C (Terminal no.)

L Speed: V [mm/s] a1 a2 T1 = V/a1 = 300/3000 = 0.1 [s], T3 = V/a2 = 300/3000 = 0.1 [s] Time T = T1 + T2 + T3 + T4 [s] [s] L 0.5 V (T1 + T3) V T1: Acceleration time and T3: Deceleration time can be obtained by the following equation.

L Speed: V [mm/s] a1 a2 T1 = V/a1 = 300/3000 = 0.1 [s], T3 = V/a2 = 300/3000 = 0.1 [s] Time [s] T = T1 + T2 + T3 + T4 [s] L 0.5 V (T1 + T3) V T1: Acceleration time and T3: Deceleration time can be obtained by the following equation.

LEC CN5 1 (8.9) B1 A1 A1 Cable length (L) [m] (22.4) A13 1 1.5 3 3 5 5 B1 (14.4) L B13 B13 A13 Connector pin no.

A A1 B C D1 E F G M (Fine pitch) P2 MXQ12(L, A, C, CL) MXQ8B(L) MXQA-JS12-X2202 RJ0805U-X2300 47.3 5 2.5 7 M3 x 12 24 7.1 10.4 M8 x 1 M4 x 8 MXQ16(A) MXQ12B(L) MXQA-JS16-X2202 RJ1006U-X2300 52.8 6 3 9 M4 x 12 29.4 9.2 12.6 M10 x 1 M5 x 10 MXQ20(A) MXQ16B MXQA-JS20-X2202 RJ1007HU-X2300 52.8 7 4 9 M5 x 12 36 11.2 16.2 M12 x 1 M6 x 12 MXQ25(A) MXQ20B MXQA-JS25-X2202 RJ1410U-X2300 77.1 10 5 12

Cable length (L)[m] A1 1 2 5 6 (17.7) (10.2) (14) (18) 1 3 5 8 A B C 1.5 3 5 8 A6 B1 B3 A1 A3 B6 (13.5) 1 2 15 16 Connector B Connector D (30.7) L (11) (14.7) (10) 10 8 A B C LE-CP/Cable length: 8 m, 10 m, 15 m, 20 m (Produced upon receipt of order) 15 20 Actuator side Controller side (5.5) (6.3) (5.7) (14.2) Connector C (Terminal no.)

LEL25MT-100l-l LEL25MT-200l-l LEL25MT-300l-l LEL25MT-400l-l LEL25MT-500l-l LEL25MT-600l-l LEL25MT-700l-l LEL25MT-800l-l LEL25MT-900l-l LEL25MT-1000l-l LEL25LT-100l-l LEL25LT-200l-l LEL25LT-300l-l LEL25LT-400l-l LEL25LT-500l-l LEL25LT-600l-l LEL25LT-700l-l LEL25LT-800l-l LEL25LT-900l-l LEL25LT-1000l-l With motor cover 272.5 372.5 472.5 572.5 672.5 772.5 872.5 972.5 1072.5 1172.5 292.5 392.5

L + Stroke L B + Stroke A + 2 (Stroke) CUJ Rod end male thread 20, 25 Width across flats B1 Width across flats B1 CU MM MM CQS SMC CQ2 SMC RQ H1 C1 X L1 X C1 H1 CQM L1 + Stroke MU A1 + 2 (Stroke) Rod End Male Thread Bore size (mm) Without auto switch With auto switch C1 H1 L1 MM X B1 A1 55 58 68 79 A1 60 63 78 89 12 16 20 25 8 10 13 17 9 10 12 15 4 5 5 6 14 15.5 18.5 22.5 M5 x 0.8 M6 x 1.0

L Calculation example) T1 to T4 can be calculated as follows. Speed: V [mm/s] a1 a2 T1 = V/a1 = 300/3000 = 0.1 [s], Time [s] T3 = V/a2 = 300/3000 = 0.1 [s] T = T1 + T2 + T3 + T4 [s] L 0.5 V (T1 + T3) V T1 T2 T3 T4 T1: Acceleration time and T3: Deceleration time can be obtained by the following equation.

L Speed: V [mm/s] Calculation example) T1 to T4 can be calculated as follows. a1 a2 Time [s] T1 = V/a1 = 300/3000 = 0.1 [s], T3 = V/a2 = 300/3000 = 0.1 [s] T = T1 + T2 + T3 + T4 [s] T1 T2 T3 T4 L 0.5 V (T1 + T3) V T1: Acceleration time and T3: Deceleration T2 = L : Stroke [mm] time can be obtained by the following equation. 200 0.5 300 (0.1 + 0.1) 300 (Operating condition) V : Speed

L DIN rail AXT100-DR-l 5.25 12.5 (Pitch) 7.5 For l, enter a number from the No. line in the table below.

Shield Brown Black Red Black Orange Black Vcc GND A A B B B-4 A-4 B-5 A-5 B-6 A-6 12 13 7 6 9 8 3 I/O cable LEC CN5 1 Controller side PLC side (Terminal no.) (8.9) B1 A1 A1 Cable length (L) [m] 1 3 5 (22.4) A13 B1 1.5 3 5 (14.4) L B13 B13 A13 Dot color Dot mark Insulation color Connector pin no.

Shield Brown Black Red Black Orange Black 12 13 7 6 9 8 3 Vcc GND A A B B B-4 A-4 B-5 A-5 B-6 A-6 I/O cable LEC CN5 1 Controller side PLC side (Terminal no.) (8.9) B1 A1 A1 Cable length (L) [m] 1 3 5 (22.4) A13 B1 1.5 3 5 (14.4) L B13 B13 A13 Dot color Dot mark Insulation color Connector pin No.

[I/O cable] PLC Controller I/O cable LATH2 1 PLC side Controller side Cable length (L) 1 3 5 (10) L 1 m A1 (Red) 3 m 5 m (18.6) Conductor size: AWG28 (6) A C B (15.4) Parallel I/O Plug Terminal List Polarized key A1 (Red) Fused Fused (10) Terminal no. Terminal no.