SMC Corporation of America
Elite Part Number Search
Search Results "ISE70G-N02-L2-T"

Selection conditions Mounting: Horizontal Bearing type: Slide bearing Stroke: 100 mm Load transfer time t: 0.5 s Load weight m: 6 kg Eccentric distance between the plate and load center of gravity l2: 50 mm Operating pressure P: 0.4 MPa Step 1: Find the maximum load speed V from formula (1).

Selection conditions Mounting: Horizontal Bearing type: Slide bearing Stroke: 100 mm Load transfer time t: 0.5 s Load weight m: 6 kg Eccentric distance between the plate and load center of gravity l2: 50 mm Operating pressure P: 0.4 MPa Step 1: Find the maximum load speed V from formula (1).

For connector cable of M8 connector, refer to page 90. 49 Series SYJ7000 Construction (A) 4 (B) 2 (A) 4 (B) 2 2 position single 2 position double 5 (R1) 3 (R2) 1 (P) 5 (R1) 3 (R2) 1 (P) y e q t r q t r w w (B) 2 (A) 4 (A) 4 (B) 2 i i 5 (R1) 1 (P) 3 (R2) 5 (R1) 3 (R2) 1 (P) u 3 position closed center/Exhaust center/Pressure center 3 position closed center (A) 4 (B) 2 t q r w 5 (R1) 3 (R2)

Dynamic moment RB Me3 Guide central axis J L2 We W Examine Me3.

Dynamic moment RB Me3 Guide central axis J L2 We W Examine Me3.

VQ1000-FPG-C4M5-D: 6 sets Double check block 757 S0700 Series Construction Body Ported Construction 2(B) (A)4 S0716 2-Position Single r u e w q 3(R2) (R1)5 1 (P) t y i 2-Position Double S0726 2(B) (A)4 r u e w q 3(R2) (R1)5 1 (P) t y i 3-Position Closed Center S0736 r u e w q 2(B) (A)4 (R1)5 1 (P) 3(R2) t y i 4-Position Dual 3-Port Valve S07A6 r u e w q 2(B) 4(A) 5(R1) 3(R2) 1(P) N.C. + N.C

Panel cut dimension 2 x 3.2 16.5 14.5 11 8.2 20 2 x 3.2 2 x 3.2 M3 thread hole 8.2 8.2 P U P S U H S H L O L C O K C K R V R S W V X S W T 19 T X 19 L2=50+T+X L2=50+T+X L1=50+R+V 14 L1=50+R+V 14 Pressure gauge (Accessory) 50 Pressure gauge (Accessory) 50 55 (at knob locked) 55 (at knob locked) IN OUT IN OUT 41.5 43.5 U Y 4 25 6 25 U Y 14 14 SMC SMC 2 x 3.2 2 x 3.2 42 42 IN side OUT side IN

The maximum load speed V[mm/s] is approximately equal to V1 x 1.4 . (1) V: Average load speed [mm/s] V = st/t st: Load transfer distance [mm] t: Load transfer time [s] Find the cylinder bore size. Step 2 1. For vertical mounting 2.

The maximum load speed V[mm/s] is approximately equal to V1 x 1.4 . (1) V: Average load speed [mm/s] V = st/t st: Load transfer distance [mm] t: Load transfer time [s] Find the cylinder bore size. Step 2 1. For vertical mounting 2.

C 300 U E R B T A N IN OUT SMC 8 x 18 S Q D F U V E DIN terminal G1/2 Cable 6 to 12 C (44) 31.5 R T A SMC IN OUT N B 8 x 18 S Q D F (mm) Electrical entry Model Grommet (with surge voltage suppressor) DIN terminal Grommet Applicable flange A B C E F N Q R S D T T U U 90 (98) V T 76 (84) 179.5 (187.5) 90.5 (98.5) 98.5 (106.5) 85 (93) 192.5 (200.5) 96 (104) 104 (112) 90.5 (98.5) U 168 (176

T Conduit terminal See table 1 below for applications.

41 G 40 39 63 H J P.C.D L1 6 x 4.4 6 x 6.6 L2 XMC-16 XMC-25 XMC-40 40 50 65 26 28 36 P.C.D 27 P.C.D 58.7 XMC-50 to 80/Angle type C L2 D Fd Fc L1 (KF flange) Fn C (K flange) (CF flange) H J K B G A A (mm) Model A 183 209 250 B 80 100 117 C 31 39 45.5 D 75 87 114 Fn 95 110 Fd 114 Fc 52 70 83 G 77 76.5 105 H J K P.C.D L1 8 x 8.4 L2 XMC-50 XMC-63 XMC-80 70 88 90 29 36 44 P.C.D 92.1 10.5

812 796 853 837 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 stations Station n L1 L2 1573

Dimensions: Centralized Wiring Type With bracket L1 60 3 38 L2 38 5 LED level meter Terminal block box EXH port End plate R End plate L 3 0 3 0 3 0 P P P T T T U U U E E E L L L S S S L L L 81 6 9 6 9 6 9 Setting dial 0.3 0.2 0.1 0.3 0.2 0.1 0.3 0.2 0.1 0 MPa 0.4 0 MPa 0.4 0 MPa 0.4 Pressure gauge 12 12 21 Bracket 24 5.5 Rc, NPT, G 1/8 SUP port L3 6.5 36 24 OUT 3 36 OUT 2 OUT 4 n Stations

2 Port Solenoid Valve For Water Dimensions (N.O.) (44) W T R (Y) Z VC T 25 VDW IN port 2-3/8 l =280 l =300 : Thread type VQ VX2 (V) (X) 2.5 (N) VX (U) E C D G Courtesy of Steven Engineering, Inc.-230 Ryan Way, South San Francisco, CA 94080-6370-Main Office: (650) 588-9200-Outside Local Area: (800) 258-9200-www.stevenengineering.com Q S A VX3 C B VXA L1 L2 16 VN L3 LVC D side U side Stations

L2 5 (Rail mounting hole pitch 12.5) L1 (Station n).

-A22 ZPT125 50-(B/N/T)01-A22 ZPT125 75-(B/N/T)01-A22 ZPT125 100-(B/N/T)01-A22 ZPB-T1 25-(B/N/T)01 ZPB-T1 50-(B/N/T)01 ZPB-T1 75-(B/N/T)01 ZPB-T1 25-(B/N/T)01 ZPB-T1 50-(B/N/T)01 ZPB-T1 75-(B/N/T)01 ZPB-T2 25-(B/N/T)01 ZPB-T2 50-(B/N/T)01 ZPB-T2 75-(B/N/T)01 ZPB-T2 25-(B/N/T)01 ZPB-T2 50-(B/N/T)01 ZPB-T2 75-(B/N/T)01 ZPB-T3 25-(B/N/T)01 ZPB-T3 50-(B/N/T)01 ZPB-T3 75-(B/N/T)01 ZPB-T3 100-(B

-A22 ZPT125 50-(B/N/T)01-A22 ZPT125 75-(B/N/T)01-A22 ZPT125 100-(B/N/T)01-A22 ZPB-T1 25-(B/N/T)01 ZPB-T1 50-(B/N/T)01 ZPB-T1 75-(B/N/T)01 ZPB-T1 25-(B/N/T)01 ZPB-T1 50-(B/N/T)01 ZPB-T1 75-(B/N/T)01 ZPB-T2 25-(B/N/T)01 ZPB-T2 50-(B/N/T)01 ZPB-T2 75-(B/N/T)01 ZPB-T2 25-(B/N/T)01 ZPB-T2 50-(B/N/T)01 ZPB-T2 75-(B/N/T)01 ZPB-T3 25-(B/N/T)01 ZPB-T3 50-(B/N/T)01 ZPB-T3 75-(B/N/T)01 ZPB-T3 100-(B