(Example) M9NW 1 m M (Example) M9NWM 3 m L (Example) M9NWL 5 m Z (Example) M9NWZ Solid state auto switches marked with are produced upon receipt of order.
s m s Type of impact s m 1 2 m2 Kinetic energy E1 Thrust energy E2 Fs Fs + mgs Fs mgs Absorbed energy E E1 + E2 Symbol : Speed of impact object (m/s) F: Cylinder thrust (N) s: Shock absorber stroke (m) m: Weight of impact object (kg) g: Gravitational acceleration (9.8 m/s2) Note) The speed of the impact object is measured at the time of impact with the shock absorber.
V V L2 Guide center line m m Through-hole mounting Bracket position Pin fixing Bracket MXZ12 MXZ16 0.35 0.35 Weight of a transferred object [kg] Weight of a transferred object [kg] 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 5 10 15 20 25 0 5 10 15 20 25 Transfer speed [m/min] Transfer speed [m/min] MXZ20 MXZ25 1.4 0.8 Weight of a transferred object [kg] Weight
Applicable bore size (mm) Dd9 L L2 m d (Drill through) Applicable split pin Part no.
Bearing MLGPM20 to 100 25 l2 = 50mm V = 200mm/s 26 l2 = 100mm V = 200mm/s 50 50 100 100 100 100 80 80 50, 63 80 80 50, 63 50, 63 32, 40 50, 63 Load weight m (kg) Load weight m (kg) Load weight m (kg) 10 10 32, 40 32, 40 32, 40 25 25 20 20 25 20 25 20 1 10 50 51 100 300 200 1 10 50 51 100 300 200 Stroke (mm) Stroke (mm) 27 l2 =50mm V = 400mm/s 28 l2 =100mm V = 400mm/s 50 50 100 100 100 100
Bearing MLGPM20 to 100 25 l2 = 50mm V = 200mm/s 26 l2 = 100mm V = 200mm/s 50 50 100 100 100 100 80 80 50, 63 80 80 50, 63 50, 63 32, 40 50, 63 Load weight m (kg) Load weight m (kg) Load weight m (kg) 10 10 32, 40 32, 40 32, 40 25 25 20 20 25 20 25 20 1 10 50 51 100 300 200 1 10 50 51 100 300 200 Stroke (mm) Stroke (mm) 27 l2 =50mm V = 400mm/s 28 l2 =100mm V = 400mm/s 50 50 100 100 100 100
Standard lead wire length is 0.5 m. Add L to the end of the part number when 3 m is desired, M when 1 m, and Z when 5 m. Ex.)
M L1 3. Dynamic moment We = 5 x 10-3WgU = 5 x 10-319.8300 = 15 [N ] Me3 = 1/3We(L2-A) = 1/3150.182 = 0.91 [Nm] 3 = Me3/Me3max = 0.91/10 = 0.091 Me3 Guide central axis We W L2 Review Me3.
=56n+80 n: stations L1=56n+90 L2=56n+106 M if ld i ht l f l M 0 96 0 77 (k ) Size 1 2 3 4 5 6 7 8 9 10 120 176 232 288 344 400 456 512 568 624 1 2 L2 136 192 248 304 360 416 472 528 584 640 L1 146 202 258 314 370 426 482 538 594 650 3 4 SV L2 162 218 274 330 386 442 498 554 610 666 SY SYJ SX VK VZ VF VFR VP7 ( ): In case of direct manual override style.
(width across flats) Applicable tubing (mm) Effective area (mm2) Connection Weight (g) L4 d L2 L3 M A L1 Model thread R I.D.
} L3=50 {mm} L2=50 {mm} L2 {B L3 Item Load factors n Note (1) Max. movable load W B L2 Examine W.
Lead wire length symbols: 0.5 m Nil 1 m M 3 m L 5 m Z (Example) M9NW (Example) M9NWM (Example) M9NWL (Example) M9NWZ Since there are other applicable auto switches than listed, refer to page 167 for details. For details about auto switches with pre-wired connector, refer to pages 1784 and 1785.
73 93 112.5 123 4 72 83 103 125 135.5 5 82 93 113 137.5 148 6 92 103 123 150 160.5 7 102 113 133 162.5 173 8 112 123 143 162.5 173 9 122 133 153 175 185.5 10 132 143 163 187.5 198 L1 L2 (L3) (L4) (L5) 10 Base Mounted Plug-in SI Unit Series VQ100 VV3Q11-X11 (L5) (L4) (L3) L2 L2 (5.5) (35.0) (45.0) (23.5) (12.3) (21.5) Manual Override D Side U Side 1 2 3 4 5 n 2-M5x0.8 (E Port) 2-M5x0.8 (P
398 387.5 376 11 20 423 412.5 392 15.5 L1 L2 L3 L4 3-3-93
Dynamic moment MQQ M U: Maximum speed U RHC Calculation Example MK(2) Operating Conditions Cylinder: REAH15 Mounting: Horizontal wall mounting style Maximum speed: U = 300 [mm/s] Load weight: W = 1 [kg] (Except weight of arm section) L1 = 200 [mm] L2 = 200 [mm] W RS Q G RS H A L2 L1 RZQ Item Load factor n Note MI W S CEP1 1.
of arm section) L1 = 200 [mm] L2 = 200 [mm] W RS Q G RS H A L2 L1 RZQ Item Load factor n Note MI W S CEP1 1.
10 m LAT3F 1.25 m Moving magnetic type linear motor Linear guide with circulating balls 17.6 oz (500 g) 100 m 30 m 90 m LAT3 Structure and Working Principle Permanent magnet The permanent magnet is mounted on the bottom side of the table, and the coil is mounted on the top surface of the rail.
M L1 We = 5 x 10 3 WgU = 5 x 10 3 1 9.8 300 = 15 [N] Me3 = 1/3We (L2A) = 1/3 15 0.182 = 0.91 [Nm] 3 = Me3/Me3max = 0.91/10 = 0.091 3. Dynamic moment Me3 Guide central axis L2 We W Examine Me3.
plug connector (M) (A) 2 1 (P) 3 (R) M plug connector (M) N.O.