SMC Corporation of America
Elite Part Number Search
Search Results "CY3R32-150-M9PSAPC"

The multi-stage ZL series is a high-efficiency vacuum generator, which operates at 150% efficiency (compared to about 40% for other units). For each scfm of compressed air it consumes, the ZL generates an incredible 1.587 scfm of suction flow. The ZL is available with a built-in vacuum switch with digital readout for design flexibility.

The multi-stage ZL series is a high-efficiency vacuum generator, which operates at 150% efficiency (compared to about 40% for other units). For each scfm of compressed air it consumes, the ZL generates an incredible 1.587 scfm of suction flow. The ZL is available with a built-in vacuum switch with digital readout for design flexibility.

The multi-stage ZL series is a high-efficiency vacuum generator, which operates at 150% efficiency (compared to about 40% for other units). For each scfm of compressed air it consumes, the ZL generates an incredible 1.587 scfm of suction flow. The ZL is available with a built-in vacuum switch with digital readout for design flexibility.

The multi-stage ZL series is a high-efficiency vacuum generator, which operates at 150% efficiency (compared to about 40% for other units). For each scfm of compressed air it consumes, the ZL generates an incredible 1.587 scfm of suction flow. The ZL is available with a built-in vacuum switch with digital readout for design flexibility.

The multi-stage ZL series is a high-efficiency vacuum generator, which operates at 150% efficiency (compared to about 40% for other units). For each scfm of compressed air it consumes, the ZL generates an incredible 1.587 scfm of suction flow. The ZL is available with a built-in vacuum switch with digital readout for design flexibility.

The multi-stage ZL series is a high-efficiency vacuum generator, which operates at 150% efficiency (compared to about 40% for other units). For each scfm of compressed air it consumes, the ZL generates an incredible 1.587 scfm of suction flow. The ZL is available with a built-in vacuum switch with digital readout for design flexibility.

Lock: None, Body Shape: D (Mounting Tap: 4xM10x1.5, Pin Hole: 2xø8H7), Mounting Surface: A (90° from Port Location), Bore Size: 50mm, Port Thread: Rc, Guide Pin Diameter: 150 (15.0mm), Guide Pin Shape: R (Round Type), Clamp Arm Position: A (Same Direction as Port), Clamping Height: L (Low Type), Shim: None, Auto Switch: P79W--Reed, 2-color Indication, High Magnetic Field Resist., 2 Wire,

Bearing Type: M (Slide Bearing), Bore Size: Ø20 mm, Port Thread Type: TN [NPT], Stroke: 150 mm, Auto Switch: M9N--Solid State, Gen. Purpose, 3 Wire NPN, Horizontal, Lead Wire or Prewired Connector: L [3m]

Magnet: D (Built-in), Mounting: B (Basic), Bore Size: 150 (1 1/2"), Stroke: 0300 (3"), Cushion: No Cushion, Rod Boot: Without Boot, Auto Switch: A93--Reed, DC Volt, AC Volt, LED, Horizontal, Lead Wire or Prewired Connector: L (3m), Number: S (1 pc.)

Magnet: D (Built-in), Mounting: B (Basic), Bore Size: 150 (1 1/2"), Stroke: 1200 (12"), Cushion: No Cushion, Rod Boot: Without Boot, Auto Switch: M9P--Solid State, Gen. Purpose, 3 Wire PNP, Horizontal, Lead Wire or Prewired Connector: SDPC (0.5m Cord Length, M12-4 Pin Connector)

A dedicated solenoid valve is not required for unlocking, thus reducing the initial costs and replacement of the existing equipment.Bore size (mm): 32-63, Stroke (mm): 50-150, Can be locked at any position within the entire stroke, Selection of retraction locking & extension locking is possible, Piping not required for unlocking CLAMP CYLINDER W/LOCK CLKQ, CLK2.

10 to 60C (No freezing or condensation)Operating/Stored: 35 to 85% RH (No condensation)1000 VAC for 1 minute between live parts and case50 M or more between live parts and case (at 500 VDC Mega)10 to 150 Hz at whichever is smaller of 1.5 mm amplitude or 20 m/s2 acceleration, in X, Y, Z directions, for 2 hours each (Non-energized)100 m/s2 in X, Y, Z directions, 3 times each (Non-energized

10 to 60C (No freezing or condensation)Operating/Stored: 35 to 85% RH (No condensation)1000 VAC for 1 minute between live parts and case50 M or more between live parts and case (at 500 VDC Mega)10 to 150 Hz at whichever is smaller of 1.5 mm amplitude or 20 m/s2 acceleration, in X, Y, Z directions, for 2 hours each (Non-energized)100 m/s2 in X, Y, Z directions, 3 times each (Non-energized

10 to 60C (No freezing or condensation)Operating/Stored: 35 to 85% RH (No condensation)1000 VAC for 1 minute between live parts and case50 M or more between live parts and case (at 500 VDC Mega)10 to 150 Hz at whichever is smaller of 1.5 mm amplitude or 20 m/s2 acceleration, in X, Y, Z directions, for 2 hours each (Non-energized)100 m/s2 in X, Y, Z directions, 3 times each (Non-energized

10 to 60C (No freezing or condensation)Operating/Stored: 35 to 85% RH (No condensation)1000 VAC for 1 minute between live parts and case50 M or more between live parts and case (at 500 VDC Mega)10 to 150 Hz at whichever is smaller of 1.5 mm amplitude or 20 m/s2 acceleration, in X, Y, Z directions, for 2 hours each (Non-energized)100 m/s2 in X, Y, Z directions, 3 times each (Non-energized

10 to 60C (No freezing or condensation)Operating/Stored: 35 to 85% RH (No condensation)1000 VAC for 1 minute between live parts and case50 M or more between live parts and case (at 500 VDC Mega)10 to 150 Hz at whichever is smaller of 1.5 mm amplitude or 20 m/s2 acceleration, in X, Y, Z directions, for 2 hours each (Non-energized)100 m/s2 in X, Y, Z directions, 3 times each (Non-energized

10 to 60C (No freezing or condensation)Operating/Stored: 35 to 85% RH (No condensation)1000 VAC for 1 minute between live parts and case50 M or more between live parts and case (at 500 VDC Mega)10 to 150 Hz at whichever is smaller of 1.5 mm amplitude or 20 m/s2 acceleration, in X, Y, Z directions, for 2 hours each (Non-energized)100 m/s2 in X, Y, Z directions, 3 times each (Non-energized

10 to 60C (No freezing or condensation)Operating/Stored: 35 to 85% RH (No condensation)1000 VAC for 1 minute between live parts and case50 M or more between live parts and case (at 500 VDC Mega)10 to 150 Hz at whichever is smaller of 1.5 mm amplitude or 20 m/s2 acceleration, in X, Y, Z directions, for 2 hours each (Non-energized)100 m/s2 in X, Y, Z directions, 3 times each (Non-energized

10 to 60C (No freezing or condensation)Operating/Stored: 35 to 85% RH (No condensation)1000 VAC for 1 minute between live parts and case50 M or more between live parts and case (at 500 VDC Mega)10 to 150 Hz at whichever is smaller of 1.5 mm amplitude or 20 m/s2 acceleration, in X, Y, Z directions, for 2 hours each (Non-energized)100 m/s2 in X, Y, Z directions, 3 times each (Non-energized

10 to 60C (No freezing or condensation)Operating/Stored: 35 to 85% RH (No condensation)1000 VAC for 1 minute between live parts and case50 M or more between live parts and case (at 500 VDC Mega)10 to 150 Hz at whichever is smaller of 1.5 mm amplitude or 20 m/s2 acceleration, in X, Y, Z directions, for 2 hours each (Non-energized)100 m/s2 in X, Y, Z directions, 3 times each (Non-energized