SMC Corporation of America
Elite Part Number Search
Search Results "CDA2TH40-300"

Magnet: D (Built-in Magnet), Series: A2, Mounting: T (Center Trunnion), Tube Material: Aluminum Tube, Bore Size: 40mm, Port Thread: Rc, Stroke: 50 mm

Magnet: D (Built-in Magnet), Series: A2, Mounting: T (Center Trunnion), Tube Material: Aluminum Tube, Bore Size: 40mm, Port Thread: Rc, Stroke: 125mm

Magnet: Built-in Magnet, Series: A2, Mounting: Center Trunnion, Tube Material: Aluminum Tube, Bore Size: 40mm, Port Thread: Rc, Stroke: 50 mm, Rod Boot: -, Auto Switch: -, Lead Wire or Prewired Connector: -, Number: -

Magnet: Built-in Magnet, Series: A2, Mounting: Center Trunnion, Tube Material: Aluminum Tube, Bore Size: 40mm, Port Thread: Rc, Stroke: 125mm, Rod Boot: -, Auto Switch: -, Lead Wire or Prewired Connector: -, Number: -

This is a legacy product. Please contact us for the latest version.sales@ocaire.com

Type M10/M11 manifold At 300 mm/s 4, 6, 8 fittings are connectable. 32 At 300 mm/s Existing 6, 8, 10, 12 fittings are connectable. Valve size Valve size 50 50 DOWN DOWN Existing At 300 mm/s Possible to drive cylinders Up to 50 Valve size Valve size 63 63 DOWN DOWN (80 at 100 mm/s) Existing Possible to drive cylinders Up to 63 80 Page 30 (125 at 100 mm/s) Sub-plate newly added!

rate: 50% Stroke 300 mm Series MB, CA2 Pressure 0.5 MPa Load rate: 50% Stroke 500 mm Average speed (mm/s) Series 800 700 600 500 400 300 200 100 0 Perpendicular, upward actuation SY3140-01 Horizontal actuation 800 700 600 500 400 300 200 100 0 SY5140-02 800 700 600 500 400 300 200 100 0 SY7140-03 800 700 600 500 400 300 200 100 0 SY9140-04 Cylinder is in extending.

Note) Standard lead wire length: 300 mm.

T4 = 0.05 [s] T1 = V/a1 = 300/5000 = 0.06 [s], T3 = V/a2 = 300/5000 = 0.06 [s] T2 = = = 0.94 [s] L 0.5 V (T1 + T3) V 300 0.5 300 (0.06 + 0.06) 300 T4 = 0.05 [s] Therefore, the cycle time can be obtained as follows.

200 100 1500 1000 500 400 300 200 100 1500 1000 500 400 300 200 100 MY3B max.

150 Nil C D Nil H L S 300 300 75 Auto-drains listed on page 95 are attached.

= 100 V = 100 3 3 V = 200 V = 200 2 2 V = 300 V = 300 V = 500 1 1 0 0 50 100 150 200 250 300 0 0 50 100 150 200 250 300 350 400 L3: Overhang Allowable range: 300 mm L3: Overhang Allowable range: 400 mm Allowable overhang L [mm] Allowable overhang L [mm] 167 Model Selection MXQ Series Determine the overhang.

This is a legacy product. Please contact us for the latest version.sales@ocaire.com, CYL, TIE ROD, AIR HYDRO, A-SW, ACTUATOR, CA1/CA2 TIE-ROD CYLINDER, ME, 40MM CA1 DBL-ACT AUTO-SW, 3.61558 lb

400 500 600 700 800 900 1000 1200 1500 CABLEVEYOR LJ1S101SC 88 128 116 94 to 300 146 LJ1S202SC 90 130 118 96 to 300 LJ1H101SC 6 48 to 500 LJ1H101PB 2 122 110 44 to 600 104 145 LJ1H101NB 4 46 to 600 LJ1H202SC 124 16 112 58 to 500 LJ1S303SC 146 132 92 120 98 to 300 to 300 to 300 LJ1H202PA 8 50 to 500 124 112 106 LJ1H202NA 12 54 to 500 LJ1H303SE 126 114 22 64 to 500 to 500 to 500 LJ1H202PC

300 100 MI W S 100 300 Speed (mm/s) Speed (mm/s) Speed (mm/s) 300 300 CEP1 Max. 500 mm/s of high speed transfer is possible.

, 200, 300 40 100, 200, 300, 500 50 200, 300, 500 63 200, 300, 500 Courtesy of Steven Engineering, Inc. !