SMC Corporation of America
Elite Part Number Search
Search Results "ISE76G-F02-L2-BK"

: 0.080 MPa/ ISE75G: 0.100 MPa/ISE76G: 0.25 MPa/ ISE77G: 0.50 MPa/ISE78G: 0.80 MPa Sub display In measurement mode, the sub display can be temporarily changed by pressing the UP or DOWN buttons.

LECSB1/LECSC1/LECSS1: Single phase 100 to 120 VAC, 50/60 Hz Connection terminal: L1,L2 LECSB2/LECSC2/LECSS2: Single phase 200 to 230 VAC, 50/60 Hz Connection terminal: L1,L2 Three phase 200 to 230 VAC, 50/60 Hz Connection terminal: L1,L2,L3 Do not connect. L1 Main circuit power supply L2 L2 L3 L3 N P1 P2 N Connect between P1 and P2. (Connected at time of shipping.)

Output /BK CN1-1, CN1-2 OFF (open) Applies the lock. The /BK signal is still ON during overtravel and the lock is still released. 4-11 4 Operation (3) Lock signal (/BK) Allocation Use parameter Pn50F.2 to allocate the /BK signal.

LECSB1: Single phase 100 to 120 VAC, 50/60 Hz Connection terminal: L1,L2 LECSB2: Single phase 200 to 230 VAC, 50/60 Hz Connection terminal: L1,L2 Three phase 200 to 230 VAC, 50/60 Hz Connection terminal: L1,L2,L3 Do not connect. L1 L2 L2 Main circuit power supply L3 L3 Regenerative converter N P1 P2 N DC reactor Connect between P1 and P2. (Connected at time of shipping.)

LECSB1/LECSC1/LECSS1: Single phase 100 to 120 VAC, 50/60 Hz Connection terminal: L1,L2 LECSB2/LECSC2/LECSS2: Single phase 200 to 230 VAC, 50/60 Hz Connection terminal: L1,L2 Three phase 200 to 230 VAC, 50/60 Hz Connection terminal: L1,L2,L3 Do not connect. L1 Main circuit power supply L2 L2 L3 L3 N P1 P2 N Connect between P1 and P2. (Connected at time of shipping.)

LECSB1: Single phase 100 to 120 VAC, 50/60 Hz Connection terminal: L1,L2 LECSB2: Single phase 200 to 230 VAC, 50/60 Hz Connection terminal: L1,L2 Three phase 200 to 230 VAC, 50/60 Hz Connection terminal: L1,L2,L3 Do not connect. L1 L2 L2 Main circuit power supply L3 L3 Regenerative converter N P1 P2 N DC reactor Connect between P1 and P2. (Connected at time of shipping.)

LECSB1: Single phase 100 to 120 VAC, 50/60 Hz Connection terminal: L1,L2 LECSB2: Single phase 200 to 230 VAC, 50/60 Hz Connection terminal: L1,L2 Three phase 200 to 230 VAC, 50/60 Hz Connection terminal: L1,L2,L3 Do not connect. L1 L2 L2 Main circuit power supply L3 L3 Regenerative converter N P1 P2 N DC reactor Connect between P1 and P2. (Connected at time of shipping.)

Output /BK CN1-1, CN1-2 OFF (open) Applies the lock. The /BK signal is still ON during overtravel and the lock is still released. 4-12 4 Operation (3) Lock signal (/BK) Allocation Use parameter Pn50F.2 to allocate the /BK signal.

LECSB1: Single phase 100 to 120 VAC, 50/60 Hz Connection terminal: L1,L2 LECSB2: Single phase 200 to 230 VAC, 50/60 Hz Connection terminal: L1,L2 Three phase 200 to 230 VAC, 50/60 Hz Connection terminal: L1,L2,L3 Do not connect. L1 L2 L2 Main circuit power supply L3 L3 Regeneration converter N P1 P2 N DC reactor Connect between P1 and P2. (Connected at time of shipping.)

250 500 200 400 L2 [mm] L2 [mm] L2 [mm] 150 300 Mep 100 200 50 100 m 0 0 0 0.2 0.4 0.6 0.8 1 0 1 2 3 4 5 0 0.5 1 1.5 2 2.5 3 Work load m [kg] Work load m [kg] Work load m [kg] 300 0 50 100 150 200 250 300 350 600 Mey 250 500 Horizontal Vertical 200 400 m L3 [mm] L3 [mm] L3 [mm] 150 300 L3 100 200 50 100 0 0 Yawing Pitching Yawing Rolling 0 0.2 0.4 0.6 0.8 1 0 1 2 3 4 5 0 0.5 1 1.5 2 2.5

Single phase 200 to 230 VAC, 50/60 Hz Connection terminal: L1, L2 Three phase 200 to 230 VAC, 50/60 Hz Connection terminal: L1, L2, L3 L2 L3 L1C Control power supply Connect the control power supply.

[mm] Overhang: L2 [mm] Overhang: L2 [mm] Overhang: L2 [mm] 160 160 L2 120 120 80 80 40 40 Horizontal mounting Wall mounting 0 0 0 0.44 0.88 0.32 1.76 2.2 0 0.44 0.88 0.32 1.76 2.2 0.0 0.88 1.76 2.64 3.53 4.4 0.0 0.88 1.76 2.64 3.53 4.4 Work load [lb] Work load [lb] Work load [lb] Work load [lb] 200 200 200 200 Overhang: L3 [mm] Overhang: L3 [mm] Overhang: L3 [mm] Overhang: L3 [mm] L3 160

-1 or 10BK-2 10 BK-2 1/2 10 RBK4-2 1/4 BK-3 10 RBK4-2 1/2 Page 17 Distributed by Power Aire, Inc.

Pressure Range: ISE76G (0 to 5 MPa), Piping: F02 (G 1/4, ISO 1179-1 Compliant), Orifice: T (Orifice shipped with the Product), Unit Specification: Unit Selection Function, Switches w/Unit Selection not Permitted for Use in Japan, Lead Wire: S (Lead Wire with M12 Connector; Straight, 5 m), Bracket: A (Bracket A, Interchangeable with ISE75[H])

Pressure Range: ISE76G (0 to 5 MPa), Piping: F02 (G 1/4, ISO 1179-1 Compliant), Orifice: T (Orifice shipped with the Product)

Pressure Range: ISE76G (0 to 5 MPa), Piping: F02 (G 1/4, ISO 1179-1 Compliant), Orifice: None, Unit Specification: Unit Selection Function, Switches w/Unit Selection not Permitted for Use in Japan, Lead Wire: S (Lead Wire with M12 Connector; Straight, 5 m)

Pressure Range: ISE76G (0 to 5 MPa), Piping: F02 (G 1/4, ISO 1179-1 Compliant), Orifice: None, Unit Specification: Unit Selection Function, Switches w/Unit Selection not Permitted for Use in Japan, Lead Wire: None, Bracket: B (Bracket B)

[mm] Overhang: L2 [mm] 400 400 m 700 mm stroke 300 300 1000 mm stroke 600 mm stroke L2 800 mm stroke 200 200 900 mm stroke 100 100 1000 mm stroke 0 0 Work load [lb] 0 2.2 4.4 6.6 8.8 11 Work load [lb] 0 2.2 4.4 6.6 8.8 11 300 300 250 250 500 mm stroke or less Overhang: L3 [mm] Overhang: L3 [mm] 200 200 m L3 600 mm stroke or less 150 150 100 100 600 mm stroke 50 50 0 0 Work load [lb] 0 2.2