SMC Corporation of America
Elite Part Number Search
Search Results "LEYG25LDEA-150C-R3C6173"

Size: 25, Bearing Type: Ball Bushing Bearing, Motor Mounting Position: In-line, Lead: Size 16: 10mm, Size 25: 12mm, Size 32/40: 16mm, Stroke: 100mm, Motor Option: w/Motor Cover, Guide Option: w/o Option, Actuator Cable Type, Length: 3m, Controller: C61 [Parallel Input (PNP)], Mounting: Screw Mounting, I/O Cable: I/O Cable, 3m, Communication Plug Connector: -

Size: 25, Bearing Type: L (Ball Bushing Bearing), Motor Mounting Position: D (In-line), Lead: A (Size 16: 10mm, Size 25: 12mm, Size 32/40: 16mm), Stroke: 100mm, Motor Option: C (w/Motor Cover), Guide Option: w/o Option, Actuator Cable Type, Length: R3 (3m), Controller: C61 [Parallel Input (PNP)], Mounting: 7 (Screw Mounting), I/O Cable: 3 (I/O Cable, 3m)

Size: 25, Bearing Type: Ball Bushing Bearing, Motor Mounting Position: In-line, Lead: Size 16: 10mm, Size 25: 12mm, Size 32/40: 16mm, Stroke: 150mm, Motor Option: w/Motor Cover, Guide Option: -, Actuator Cable Type, Length: -, Controller: -, Mounting: -, I/O Cable: -, Communication Plug Connector: -

Size: 25, Bearing Type: L (Ball Bushing Bearing), Motor Mounting Position: D (In-line), Lead: A (Size 16: 10mm, Size 25: 12mm, Size 32/40: 16mm), Stroke: 150mm, Motor Option: C (w/Motor Cover)

Size: 25, Bearing Type: L (Ball Bushing Bearing), Motor Mounting Position: D (In-line), Lead: A (Size 16: 10mm, Size 25: 12mm, Size 32/40: 16mm), Stroke: 150mm, Motor Option: C (w/Motor Cover), Guide Option: w/o Option, Actuator Cable Type, Length: R5 (5m), Controller: C91 (Ether Net/IPâ„¢), Mounting: 8 (DIN Rail)

Size: 25, Bearing Type: Ball Bushing Bearing, Motor Mounting Position: In-line, Lead: Size 16: 10mm, Size 25: 12mm, Size 32/40: 16mm, Stroke: 150mm, Motor Option: w/Motor Cover, Guide Option: w/o Option, Actuator Cable Type, Length: None, Controller: C61 [Parallel Input (PNP)], Mounting: Screw Mounting, I/O Cable: -, Communication Plug Connector: -

Size: 25, Bearing Type: L (Ball Bushing Bearing), Motor Mounting Position: D (In-line), Lead: A (Size 16: 10mm, Size 25: 12mm, Size 32/40: 16mm), Stroke: 150mm, Motor Option: C (w/Motor Cover), Guide Option: w/o Option, Actuator Cable Type, Length: None, Controller: C61 [Parallel Input (PNP)], Mounting: 7 (Screw Mounting)

Size: 25, Bearing Type: L (Ball Bushing Bearing), Motor Mounting Position: D (In-line), Lead: A (Size 16: 10mm, Size 25: 12mm, Size 32/40: 16mm), Stroke: 150mm, Motor Option: C (w/Motor Cover), Guide Option: w/o Option, Actuator Cable Type, Length: R3 (3m), Controller: C61 [Parallel Input (PNP)], Mounting: 8 (DIN Rail), I/O Cable: 3 (I/O Cable, 3m)

-XAl Change of rod end shape -XB6 Heat resistant cylinder (10 to 150C) * Not available with switch & with air cushion VMounted on the product. vPlease order separately.

(Option) Amplifier Heater (Option) Ambient temperature: Max. 150C (Sensor) 2-color indicator An optional heater is available. Auto switches are mountable from 4 directions.

Symbol Nil None A B C Changed part XVD Without indicator With indicator Without indicator With indicator XLF100-30-1 XLF100A-30-1 XLF100-30-1H XLF100A-30-1H 5 to 60C 8-1 8-2 XGT 8-1 5 to 150C 8-2 Temperature specifications Symbol Nil 5 to 60C 5 to 150C H0 CYV Temperature Seal material: Same as the seal materials of How to Order Valve Same as How to Order Specifications Valve type Shaft seal

) Symbol -XB6 2 Heat Resistant Cylinder (10 to 150C) Bore size Stroke How to Order Standard model no.

cylinder can create a gas that is hazardous to humans. 1729 C Made to Order Common Specifications: -XB6: Heat Resistant Cylinder (10 to 150C) Symbol -XB6 Heat Resistant Cylinder (10 to 150C) 2 CY3B series How to Order Temperature Range for Operating Cylinder and Piston Speed 1.

Residence time of water at 20C is 5.5 x 10-6 sec, whereas at 150C it is 2.8 x 10-8 sec, or 200 times shorter. As an example, it took 800 minutes to evacuate moist air from a 150mm x 500mm P/A test chamber to 10-9Torr. The same process took only 4 minutes with dry (20ppb) nitrogen.

Residence time of water at 20C is 5.5 x 10-6 sec, whereas at 150C it is 2.8 x 10-8 sec, or 200 times shorter. As an example, it took 800 minutes to evacuate moist air from a 150mm x 500mm SMC test chamber to 10-9Torr. The same process took only 4 minutes with dry (20ppb) nitrogen.

Symbol 1 Heat Resistant Cylinder (10 to 150C) -XB6 Air cylinder which changed the seal material and grease, so that it could be used even at higher temperature up to 150 from 10C.