SMC Corporation of America
Elite Part Number Search
Search Results "ISE70G-N02-L2-B"

Lead Series Lead (Including Pn20E Pn210 symbol pulley ratio) A 12 65536 750 LEY25/LEYG25 B 6 375 LEY25D/LEYG25D C 3 131072 375 A 20 65536 1250 LEY32/LEYG32 B 10 625 LEY63D C 5 131072 625 A 16 1000 LEY B 8 500 LEY32D/LEYG32D C 4 250 65536 A 20 1250 B 10 625 C 5 131072 625 LEY63 5(2.86) L 229376 625 (Pulley ratio 4/7) H 20 1250 LEFS25 A 12 750 B 6 375 H 24 1500 LEFS32 A 16 1000 B 8 500 LEF

B 2-P Port size 2-P Port size 2-M, thread depth N 2-M, thread depth N L L K K DIN terminal: D Conduit terminal: T Cable 6.8 to 10 F S Q 27.5 (Q) D F 25 C R C (44) R R E G 1/2 E G 1/2 A H D (S) B B A H 2-P Port size 2-P Port size 2-M, thread depth N 2-M L L K K N.C. dimensions (mm) Grommet: G Conduit: C DIN terminal: D Conduit terminal: T P Port size Rc A B C D E F H K L M N Model Note) U

A Section A-A Bolt holder (movable) B Section B-B l2 l1 ~ = 0.5 or less l1 (mm) 5 5 l2 (mm) 8.4 9.5 CXSJ6 CXSJ10 Warning 1. Take precautions when your hands are near the plate and housing. Take sufficient care to avoid getting your hands or fingers caught when the cylinder is operated. Piping 1. Plug the appropriate supply port(s) according to the operating conditions.

A Section A-A Bolt holder (movable) B Section B-B l2 l1 ~ = 0.5 or less l1 (mm) 5 5 l2 (mm) 8.4 9.5 CXSJ6 CXSJ10 Warning 1. Take precautions when your hands are near the plate and housing. Take sufficient care to avoid getting your hands or fingers caught when the cylinder is operated. Piping 1. Plug the appropriate supply port(s) according to the operating conditions.

(mm) A B C D E F G H J L Port size Bracket part no.

[mm] L2 [mm] L2 [mm] L2 [mm] LER L2 600 600 1000 1000 Y m Me 400 400 LEH 500 500 200 200 LEY -X5 0 0 0 0 0 10 5 15 20 0 10 5 15 20 30 25 0 10 40 50 20 30 0 10 40 50 20 30 60 70 80 Work load [kg] Work load [kg] Work load [kg] Work load [kg] 11LEFS 2000 2000 1000 1000 11LEJS 800 800 1500 1500 m Me L3 [mm] L3 [mm] L3 [mm] L3 [mm] 600 600 L3 25A1000 1000 Z 400 400 500 500 LEC 200 200 0 0 0 0

L2) Model Bore size [mm] Model Bore size [mm] L1 L2 The opening/closing width represents the value when gripping the exterior of a workpiece.

L2 [mm] L2 [mm] L2 [mm] L2 [mm] 600 600 600 600 Y 400 400 400 400 Mer m 200 200 200 200 0 0 0 0 0 10 20 30 40 50 0 10 20 30 40 50 60 0 2 4 6 8 10 12 14 16 0 4 8 12 16 20 24 Work load [kg] Work load [kg] Work load [kg] Work load [kg] 2000 2000 2000 2000 Mep 1500 1500 1500 1500 L3 [mm] L3 [mm] L3 [mm] L3 [mm] m 1000 1000 1000 1000 L3 Z 500 500 500 500 0 0 0 0 0 10 20 30 40 50 0 2 4 6 8 10

B V IDFA100F V IDFA125F V IDFA150F B IDFA100F150F 1 4 1.3 IDX-OM-U022 1. 3.7 5.2 (IDFA100F, 125F) R OFF 5.2 L1 L2 L3 1,2 3,4 5,6 M5 9.5mm 3.5mm 2 1 3 2 4 5 6 M3 6.5mm 1.25mm 2 L1,L2,L3 PE: L2 L3 PE L1 M4 9.5mm 5.5mm 2 IDFA100F150F 1 5 1.3 IDX-OM-U022 1. 5.2 3.7 5.2 (IDFA150F) R OFF L1 L2 L3 M5 9.5mm 3.5mm 2 L1,L2,L3 PE: L2 L3 PE L1 1,2 3,4 5,6 1 3 2 4 5 6

10 0 10 20 30 0 20 40 60 Work load (W) kg Work load (W) kg Work load (W) kg 600 600 600 L2 M2 400 400 400 L2 mm L2 mm L2 mm Rolling Yawing W 200 200 200 L2 M2 0 10 20 30 0 20 40 60 0 2 4 6 8 10 Work load (W) kg Work load (W) kg Work load (W) kg W 3000 2000 2000 a=1000 a=1000 a=1000 2000 L3 mm L3 mm L3 mm L3 1000 1000 1000 a=2000 a=2000 W a=2000 a=3000 a=3000 a=3000 M3 a 0 20 40 60 0 2 4

(Values at the initial period) Note 3) At rated voltage Flow Characteristics/Weight Flow characteristics 1 2 (P A) 2 3 (A R) 3 2 (R A) 2 1 (A P) Weight Valve model Grommet C [dm 3/(sbar)] b Cv C [dm 3/(sbar)] b Cv C [dm 3/(sbar)] b Cv C [dm 3/(sbar)] b Cv VT317 VT317V (Vacuum spec. type) VT317E (Continuous duty type) 0.29 kg 2.4 0.26 0.62 2.6 0.34 0.67 2.8 0.25 0.67 2.5 0.37 0.66

When performing the piping work, turn the tightening tool in the horizontal direction to the hexagon across flats of the body B so that any moment is not applied to the body A. If the tool is in contact with the body A, this may cause the body B to come off.

Replacement method Standard replacement period Refrigerating compressor 1 B 20,000 hours (6 years) Plate type heat exchanger 1 B 20,000 hours (6 years) Water regulating valve 1 B 20,000 hours (6 years) High pressure switch 1 B 20,000 hours (6 years) Low pressure switch 1 A 20,000 hours (6 years) Magnetic contactor 1 A 20,000 hours (6 years) Programmable controllers 1 A 20,000 hours (6 years

5) Y V IDF100F V IDF125F V IDF150F B 1.3 IDF100150F-W 1 4 IDX-OM-Z004 1 3.6 5.2 (IDF100F, 125F) R OFF 5.2 L1 L2 L3 M5 9.5mm 3.5mm 2 1,2 3,4 5,6 L1,L2,L3 PE: L1 L2 L3 PE 1 2 3 4 5 6 M4 9.5mm 5.5mm M3 6.5mm 1.25mm 2 2 1.3 IDF100150F-W 1 5 IDX-OM-Z004 1 3.6 5.2 5.2 (IDF150F) R OFF L1 L2 L3 M5 9.5mm 3.5mm 2 1,2 3,4 5,6 L1,L2,L3 PE: L1 L2 L3 PE 1 2 3 4 5 6

(For details, refer Best Pneumatics Vol. 1.) 5-2-4 3 5 Port Air Operated Valve Series SYA3000/5000/7000 Flow Characteristics/Weight Model/Series SYA320 (Body ported) Port size Flow characteristics Weight (g) Pilot port size (Nominal size) Valve model Type of actuation C (dm3/(sbar)) b Cv C (dm3/(sbar)) b 1 4/2 (P A/B) 4/2 5/3 (A/B EA/EB) Cv P, EA, EB A, B 35 37 Single Double 2 position

B side traveling parallelism to A side Refer to Graph (1).

(except for 50 and 63) b C CY1B6 -SCY1B, #1 CY1B10 -SCY1B, #2 CY1B15 -SCY1B, #3 CY1B20 -SCY1B20, #1 CY1B25 -SCY1B, #4 CY1B32 -SCY1B, #5 CY1B40 -SCY1B, #6 CY1B50 -SCY1B, #7 CY1B63 -SCY1B, #8 H B d M10 x 1.0 M20 x 1.5 M26 x 1.5 M32 x 2.0 H 4 8 8 10 B 14 26 32 41 C 16.2 30 37 47.3 Part No.

A B A B A B A B A B A B A B A B 40 50 63 80 100 6 4 3.5 1.5 0 0.5 6.5 2 4 11.5 10 0 0 4.5 0 2 9.5 8 ML2B 3.5 1.5 0 0.5 6.5 2 4 11.5 10 0 0 4.5 0 2 9.5 8 8.5 7.5 6 5 2.5 3 9 4.5 6.5 14 12.5 1.5 2 8 3.5 5.5 13 11.5 12 10 9.5 7.5 6 6.5 4.5 8 10 17.5 16 4 4.5 12.5 6 8 15.5 14 13.5 12.5 11 10 7.5 8 14 9.5 11.5 19 17.5 6.5 7 13 8.5 10.5 18 16.5 D-A9 and D-A9V cannot be mounted on 50.

MGC MGF CY1 q B MY1 Normally ON w * Adjust the switch position according to load and speed.

When sum of load rate does not exceed 1, it is possible to use. n=1+2+3 1 < = < = 47 MXS Series Air Slide Table How To Select Allowable load: W(N) Fig.1 Overhung: Ln(mm), Correction value for moment center distance An (mm) Fig.2 Pitch moment Yaw moment Roll moment W My Mp Mr W W W Static moment Kinetic moment L1 A1 L3 A5 L2 A3 W Mp Mr My W W L3 A6 W L1 A2 L2 A4 W Mey Mep L2 A4 A2 L3 Work