HRX-OM-Q026-V Operation Manual Installation Operation Original Instructions Thermo Chiller HRSH Series HRSH100-A-20HRSH100-A-40HRSH100-A-20-S HRSH150-A-20HRSH150-A-40HRSH150-A-20-S HRSH200-A-20HRSH200-A-40HRSH200-A-20-S HRSH250-A-20HRSH250-A-40HRSH250-A-20-S HRSH300-A-20HRSH300-A-40HRSH100-W-20HRSH100-W-40HRSH100-W-20-S HRSH150-W-20HRSH150-W-40HRSH150-W-20-S HRSH200-W-20HRSH200-W-40HRSH200
For a facility having a small installation area (that can not vent the air naturally): Make a forced air exhaust vent on a wall at a high level and an air inlet on a wall at a low level. 3.
Facility having a small installation area (that can not vent the air naturally) Make a forced air exhaust vent on a wall at a high level and an air vent on a wall at a low level.
This is a legacy product, and replaced byVHS20-N01B-Z, VALVE, 3 PORT LOCK OUT, VALVE, VHS HAND VALVE, CA, VHS BODY PT 1/8NPT, 0.46601 lb
This is a legacy product, and replaced byAR20-N01B-Z-D AR MASS PRO. REGULATOR, MODULAR, 1/8 NPT. AIRLINE EQUIPMENT. AR MASS PRO 1/8 MODULAR (NPT). 0.55115 lb. CC.
This is a legacy product, and replaced byAR20-N01B-Z-D AR MASS PRO. REGULATOR, MODULAR. AIRLINE EQUIPMENT. AR MASS PRO 1/8 MODULAR (NPT). .50816 lb. CC.
Installation at indoor site 1 In case of facility having a large installation area (that can vent the air naturally) Make an air outlet on a wall at a high level and air inlet on a wall at a low level, to allow for adequate airflow. 2 In case of facility having a small installation area (that can not vent the air naturally) Make a forced air exhaust vent on a wall at a high level and an air
Facility having a small installation area (that can not vent the air naturally) Make a forced air exhaust vent on a wall at a high level and an air vent on a wall at a low level.
Facility having a small installation area (that can not vent the air naturally) Make a forced air exhaust vent on a wall at a high level and an air vent on a wall at a low level.
Facility having a small installation area (that can not vent the air naturally) Make a forced air exhaust vent on a wall at a high level and an air vent on a wall at a low level.
Facility having a small installation area (that can not vent the air naturally) Make a forced air exhaust vent on a wall at a high level and an air vent on a wall at a low level.
Size: 1/8, Thread: NPT, Port Size: 1/8, Accessory: Bracket, Option 1: None, Option 2: Name Plate, Caution on Bowl
(Also, when switching bowl materials from a metal bowl with a level gauge to a polycarbonate or nylon product, the oil feed tube assembly must be replaced.) Please consult SMC separately. It is not possible to switch from a polycarbonate, nylon or metal bowl, or from a metal bowl with a level gauge to a 1000 cm3 tank.
(Also, when switching bowl materials from a metal bowl with a level gauge to a polycarbonate or nylon product, the oil feed tube assembly must be replaced.) Please consult SMC separately. It is not possible to switch from a polycarbonate, nylon or metal bowl, or from a metal bowl with a level gauge to a 1000 cm3 tank.
Unit Series AC 21 to 41 How To Order V D AC 31 B N 03 8 -X2217 Z Y Air Combination Unit With External Epoxy Coating, Stainless Fasteners Body Size Symbol 21 31 41 Name Plate, Caution Plate On Bowl in psi, F Size 1/8 3/8 1/2 Regulator Handle Orientation Symbol Nil Y Description Downward Handle Upward Handle Model Combination Symbol Nil A B Bowl Description Metal Bowl Metal Bowl with Sight
Unit Series AC 21 to 41 How To Order V D AC 31 B N 03 8 -X2217 Z Y Air Combination Unit With External Epoxy Coating, Stainless Fasteners Body Size Symbol 21 31 41 Name Plate, Caution Plate On Bowl in psi, F Size 1/8 3/8 1/2 Regulator Handle Orientation Symbol Nil Y Description Downward Handle Upward Handle Model Combination Symbol Nil A B Bowl Description Metal Bowl Metal Bowl with Sight
Remove a housing from a body by rotating 4 mounting screws counterclockwise with a hexagon wrench key. Hexagon wrench key Nominal: 5 2) Remove the valve guide. Hold the valve guide with a spanner on the spanner flat to rotate it counterclockwise and remove the valve guide. Spanner Nominal: 30 3) Remove the valve spring. 4) Remove the valve assembly.
Remove a housing from a body by rotating 4 mounting screws counterclockwise with a hexagon wrench key. Hexagon wrench key Nominal: 5 2) Remove the valve guide. Hold the valve guide with a spanner on the spanner flat to rotate it counterclockwise and remove the valve guide. Spanner Nominal: 30 3) Remove the valve spring. 4) Remove the valve assembly.
Body Size: 20, Thread: N (NPT), Port Size: 01 (1/8), Mounting: B (Bracket), Semi-Standard, Body Size 10: 2 (Metal Bowl), Semi-Standard, Body Size 20: Z (Name Plate, Caution Plate for Bowl in Imperial Units: psi, °F), Semi-Standard, Body Size 30, 40, 50 & 60: Standard
Body Size: 20, Thread: N (NPT), Port Size: 01 (1/8), Mounting: B (Bracket), Semi-Standard, Body Size 10: 3 (Drain Cock), Semi-Standard, Body Size 20: Z (Name Plate, Caution Plate for Bowl in Imperial Units: psi, °F), Semi-Standard, Body Size 30, 40, 50 & 60: Standard