SMC Corporation of America
Elite Part Number Search
Search Results "AL30-02-3-A"

PTSensor PS1 PS2 PS3 PT FL WH WH BK BK DOUT2(temp) DOUT( flow) PM DC(+) DC(-) M M FAN OUT OUT OUT + + + 3 3 3 2 2 2 1 1 1 3 2 3 2 1 1 4 1 2 3 1 4 Model /A /B A E E B 3 2 1 1 BK BL BR BR BR BR BR BR BL BL BL BL BL BL BL BL BL RS232C DIO RS485 FG 13 15 16 12 10 11 14 6 8 9 3 5 7 2 4 1 13 15 16 12 10 11 14 1 1 11 6 8 9 3 8 3 9 6 9 3 6 7 2 5 2 5 7 5 7 2 10 12 13 15 1 4 4 4 14 Thermister T3 t

See Table 3-3. Use a power supply suitable for the specifications of the product. Use a power supply of over voltage category 3 (IEC60664-1)*. Be sure to connect the ground connection. Ensure that a lock out facility is availble on the power supply. Each product must have its own separate earth leakage breaker. Otherwise there can be a risk of electric shock or fire.

Sound noise:HRL100-A-20 : 75 dB(A) HRL200-A-20 : 75 dB(A) HRL300-A-20 : 71 dB(A) * Front 1m, height 1m, rated condition 3.2 Installation HRL Series 3-6 HRX-OM-Y098 Chapter 3 Transport and Setting Up 3.2.3 Installation and maintenance space It is recommended to keep the space around the product shown in Fig. 3-3.

Sound noise:HRL100-A-20 : 75 dB(A) HRL200-A-20 : 75 dB(A) HRL300-A-20 : 71 dB(A) * Front 1m, height 1m, rated condition 3.2 Installation HRL Series 3-6 HRX-OM-W060 Chapter 3 Transport and Setting Up 3.2.3 Installation and maintenance space It is recommended to keep the space around the product shown in Fig. 3-3.

See Table 3-3. Use a power supply suitable for the specifications of the product. Use a power supply of over voltage category 3 (IEC60664-1)*. Be sure to connect the ground connection. Ensure that a lock out facility is availble on the power supply. Each product must have its own separate earth leakage breaker. Otherwise there can be a risk of electric shock or fire.

Table 3-3 Power supply cable and Earth Leakage BreakerRecommended Recommended earth Terminal block leakage breaker Power screw Recomm Tighten Sensiti Rated Model supply Cable qty. x size diamet ended ing Rated vity curren voltage er crimp torque voltage of leak t terminal [V] current [A] [mA] 3 cores x10AWG HRS060-A-20 30 (3 cores x 5.5mm2) (including ground) 200, 1-phase 1.5Nm M4 5.5-4 30

This siand comes \ ,' h t/\'o cross bars A thrrd cross barcan be (TB 3CB) 3 6 w x 2 6 d I 6 5 h TK-1 tube Crner (13r,m Ilblng or re$) TK-2TubeCLner(18mm llb ng or e$) TK'3 Tlb Cuter (Low C.s0 TGr Tlbe Release Too (o4, o6mm lubel TG-2 TLbe Feease Too (ol18 o1r4'tube) a a a a a a a a a a a a a a a a a r a o a o a a a a a a a a a a a a a a a a a a o a a a a a a a a a a a a a a a a a a a a a

Note 3) Bowl assembly for AL30 to AL60 comes with a bowl guard (steel band material). 52 AL10 to 60 Dimensions AL10 AL20 L D Bracket (option) G F Port size K M A Port size C B R C J H OUT OUT IN OUT OUT IN B R P Min. clearance for maintenance Min. clearance for maintenance A AL50, 60 AL30, 40 L D D L Port size Bracket (option) Bracket (option) G F G F Port size M K M K E J C B R C B R H

For a facility having a small installation area (that can not vent the air naturally): Make a forced air exhaust vent on a wall at a high level and an air inlet on a wall at a low level. 3.

2.4 Operation display panel . 2-4 Chapter 3 Transport and Setting Up . 3-1 3.1 Transport. 3-1 3.1.1 Transportation using casters . 3-2 3.2 Installation . 3-3 3.2.1 Environment . 3-4 3.2.2 Location (Required ventilation rate and facility water source) . 3-6 3.2.3 Installation and Maintenance Space . 3-7 3.3 Installation . 3-8 3.3.1 Mounting . 3-8 3.3.2 Electrical wiring . 3-9 3.3.3 Preparation

Table 3-3 Power supply cable and Earth Leakage BreakerRecommended Recommended earth leakage breaker Model Power supply Sensitivity voltage Cable qty. x size Rated Rated of leak voltage current current [V] [A] [mA] 1-phase 200-230V AC (50/60Hz) 3 cores x12AWG HRS040-A-20 200, Recomm 230 20 30 Terminal (3 cores x3.5mm2) HRS040-W-20 block ended (including ground) screw crimp diameter terminal

2.4 Operation display panel . 2-4 Chapter 3 Transport and Setting Up . 3-1 3.1 Transport. 3-1 3.1.1 Transportation using casters . 3-2 3.2 Installation . 3-3 3.2.1 Environment . 3-4 3.2.2 Location (Required ventilation rate and facility water source) . 3-6 3.2.3 Installation and Maintenance Space . 3-7 3.3 Installation . 3-8 3.3.1 Mounting . 3-8 3.3.2 Electrical wiring . 3-9 3.3.3 Preparation

2.4 Operation display panel . 2-4 Chapter 3 Transport and Setting Up . 3-1 3.1 Transport. 3-1 3.1.1 Transportation using casters . 3-2 3.2 Installation . 3-3 3.2.1 Environment . 3-4 3.2.2 Location (Required ventilation rate and facility water source) . 3-6 3.2.3 Installation and Maintenance Space . 3-7 3.3 Installation . 3-8 3.3.1 Mounting . 3-8 3.3.2 Electrical wiring . 3-9 3.3.3 Preparation

OFF 45 ON Max. 6 38 24.5 Symbol 3 port (A) 2 (A) 2 1.5 3 1.5 28 82 (110) 12 12 1 (P) R port (5 port only) 5 port (A) 2 (A) 2 12 12 1 (P) 3 (R) 3 (R) 32 16 40 R port (5 port only) 3 x 1/4 53.2 25 25 * 0.5 MPa supply 63.5 F.O.F.* 40 N T.T. 45 Foot pedal VM220-02-40A VM230-02-40A 3 x 6.5 mounting hole Symbol 2 port 54 71 (A) 2 152 12 10 159 1 (P) 177 3 port (A) 2 1/4 2(A) T.T. 12 10 1 (P) 3

10 For Options T, MT: 15 Applicable earth leakage breaker capacity8 Rated current: 10 A For Options T, MT: 15 A Sensitivity current: 30 mA Electrical system Cable quantity x Size (Including grounding cable)15 3 cores x 14 AWG (3 cores x 2.0 mm2) Rated operating current (50/60 Hz)17 [A] 3.6/4.0 3.6/4.3 5.2/5.8 5.5/6.2 For Options T, MT 4.7/6.2 4.7/6.5 6.3/8.0 6.5/8.3 Rated power consumption

Setting for contact output signal 1 to 3 Detection of contact input signal Setting for alarm (AL30 and AL31) 2. Serial communication setting 3. Analog output setting 4.

3 port valve Nole) Alth IO ne a a a a a a a a a a a a a a a o a a a a a a a a a a a a a a a a a a a a a a a o a a a a a a a a a a a a a a a a o a a a a a VHS -TPressure reliel I 3-port valve PSI as unit displayed on label l/8 3/8 1/2 Nolel ) Only 1or the NPT thread Size combination Port thread Rc NPT Large knob Utilizes an oversized knob for simpe operation.

of a command is not normal. 3.12 Negative response HRS400-A-46 3-16 DOC1003626 Chapter 3 Serial communication Communication example Device Address: No.1 Read seven consecutive data from register 0100h which is out of range.

Prepare a forklift. The product will be delivered in the packaging shown below. 3. Hanging transportation 1) Crane manipulation and slinging work should be done by an eligible person. 2) Do not grip the piping on the right side or the handles of the panel. 3) When hanging by the eye bolts, be sure to use a 4-point hanging method.

40 A 4 cores x 8 mm2 (4 cores x AWG8) (Including grounding cable) R8-5 HRSH250--20 50 A 4 cores x 8 mm2 (4 cores x AWG8) (Including grounding cable) R8-5 M5 A HRSH100--40 20 A 3 x 5.5 mm2 (3 x AWG10) (Power supply) 1 x 14 mm2 (1 x AWG6) (Grounding cable) R5.5-5 (Power supply) R14-5 (Grounding cable) HRSH150--40 HRSH200--40 HRSH250--40 3-phase 380 to 415 VAC (50/60 Hz) 30 A Note) An example