SMC Corporation of America
Elite Part Number Search
Search Results "ISE2L-T1-15"

ZPA-T1-B01 ZPA-T1-N01 ZPA-T1-T01 ZPA-T2-B01 ZPA-T2-N01 ZPA-T2-T01 ZPA-T2-B01 ZPA-T2-N01 ZPA-T2-T01 ZPA-T3-B01 ZPA-T3-N01 ZPA-T3-T01 ZPA-T3-B01 ZPA-T3-N01 ZPA-T3-T01 ZPA-T1-B8 ZPA-T1-B10 ZPA-T1-B8 ZPA-T1-B10 ZPA-T2-B8 ZPA-T2-B10 ZPA-T2-B12 ZPA-T2-B16 ZPA-T2-B8 ZPA-T2-B10 ZPA-T2-B12 ZPA-T2-B16 ZPA-T3-B12 ZPA-T3-B16 ZPA-T3-B12 ZPA-T3-B16 ZP40 ZP40 With three M3 bolts With three M3 bolts ZP50

ZPA-T1-B01 ZPA-T1-N01 ZPA-T1-T01 ZPA-T2-B01 ZPA-T2-N01 ZPA-T2-T01 ZPA-T2-B01 ZPA-T2-N01 ZPA-T2-T01 ZPA-T3-B01 ZPA-T3-N01 ZPA-T3-T01 ZPA-T3-B01 ZPA-T3-N01 ZPA-T3-T01 ZPA-T1-B8 ZPA-T1-B10 ZPA-T1-B8 ZPA-T1-B10 ZPA-T2-B8 ZPA-T2-B10 ZPA-T2-B12 ZPA-T2-B16 ZPA-T2-B8 ZPA-T2-B10 ZPA-T2-B12 ZPA-T2-B16 ZPA-T3-B12 ZPA-T3-B16 ZPA-T3-B12 ZPA-T3-B16 ZP40 ZP40 With three M3 bolts With three M3 bolts ZP50

Calculation example) T1 to T4 can be calculated as follows. L Speed: V [mm/s] a1 a2 T1 = V/a1 = 300/3000 = 0.1 [s], T3 = V/a2 = 300/3000 = 0.1 [s] Time T = T1 + T2 + T3 + T4 [s] [s] L 0.5 V (T1 + T3) V T1: Acceleration time and T3: Deceleration time can be obtained by the following equation.

Air leakage will occur. 1/2 15 to 30 20 to 22 Connection Female Thread: G Uni thread port size Wrench tightening angle after tightened by hand [deg] Tightening torque [Nm] 5. Use R external threads with Rc internal threads and NPT external threads with NPT internal threads. 1/8 30 to 45 3 to 4 1/4 15 to 30 4 to 5 3/8 15 to 30 8 to 9 Piping Caution 1/2 15 to 30 14 to 15 2.

Calculation example) T1 to T4 can be calculated as follows. L Speed: V [mm/s] a1 a2 T1 = V/a1 = 300/3000 = 0.1 [s], T3 = V/a2 = 300/3000 = 0.1 [s] Time [s] T = T1 + T2 + T3 + T4 [s] L 0.5 V (T1 + T3) V T1: Acceleration time and T3: Deceleration time can be obtained by the following equation.

Applicable model HRR012/018/024/030-A/W-T1 Rated flow50/60Hz*1 L/min 10 (0.28MPa) Maximum pump head Pump 50/60Hz*2 m 40 Output W 400 Circuit protector A 15 Recommended earth leakage breaker capacity A 15 The cooling capacity reduces about 300W from the value in the catalog.

L Speed: V [mm/s] Calculation example) T1 to T4 can be calculated as follows. a1 a2 Time [s] T1 = V/a1 = 300/3000 = 0.1 [s], T3 = V/a2 = 300/3000 = 0.1 [s] T = T1 + T2 + T3 + T4 [s] T1 T2 T3 T4 L 0.5 V (T1 + T3) V T1: Acceleration time and T3: Deceleration T2 = L : Stroke [mm] time can be obtained by the following equation. 200 0.5 300 (0.1 + 0.1) 300 (Operating condition) V : Speed

Allowable voltage fluctuation10% 15 Circuit protector A 15 10 Applicable earth leakage breaker 8 Rated current15A Rated current10A Sensitivity current30mA Sensitivity current30mA Cable Qty x size(Inculding ground) 16 3 cores 14AWG(3 cores2.0m ) Electrical system 6.2 / 7.7 2.5 / 3.0 Rated operating current (50/60Hz) 17 A For option T1 For option T1 9.5 / 10.7 4.3 / 4.7 0.50 / 0.67 0.48 /

ZPA-T1-B01 ZPA-T1-N01 ZPA-T1-T01 ZPA-T2-B01 ZPA-T2-N01 ZPA-T2-T01 ZPA-T2-B01 ZPA-T2-N01 ZPA-T2-T01 ZPA-T3-B01 ZPA-T3-N01 ZPA-T3-T01 ZPA-T3-B01 ZPA-T3-N01 ZPA-T3-T01 ZPA-T1-B8 ZPA-T1-B10 ZPA-T1-B8 ZPA-T1-B10 ZPA-T2-B8 ZPA-T2-B10 ZPA-T2-B12 ZPA-T2-B16 ZPA-T2-B8 ZPA-T2-B10 ZPA-T2-B12 ZPA-T2-B16 ZPA-T3-B12 ZPA-T3-B16 ZPA-T3-B12 ZPA-T3-B16 ZP40 ZP40 With three M3 bolts With three M3 bolts ZP50

L Calculation example) T1 to T4 can be calculated as follows. Speed: V [mm/s] a1 a2 T1 = V/a1 = 300/3000 = 0.1 [s], Time [s] T3 = V/a2 = 300/3000 = 0.1 [s] T = T1 + T2 + T3 + T4 [s] L 0.5 V (T1 + T3) V T1 T2 T3 T4 T1: Acceleration time and T3: Deceleration time can be obtained by the following equation.

-A3 ZP3A-T1-B3 ZP3A-T1-A6-B3 ZP3A-T3-A5 ZP3A-T3-B5 Note 1) ; in the table indicates the pad material.

Temperature: 5 to 40C, Humidity: 30 to 70%, Altitude: less than 3000 m Circulating fluid2 Tap water, 15% ethylene glycol aqueous solution Set temperature range1 [C] 15 to 35 Cooling capacity (50/60 Hz)3 [W] 1000/1100 Heating capacity (50/60 Hz)4 [W] 200/200 Temperature stability5 [C] 0.1 Pump capacity (50/60 Hz)6 [MPa] 0.09 (at 5 L/min)/0.11 (at 5 L/min) For Option T1: 0.35 (at 5 L/min)/

-A3 ZP3A-T1-B3 ZP3A-T1-A6-B3 ZP3A-T3-A5 ZP3A-T3-B5 Note 1) ; in the table indicates the pad material.

Calculation example) T1 to T4 can be calculated as follows. L Speed: V [mm/s] a1 a2 T1 = V/a1 = 300/10 = 0.03 [s], T3 = V/a2 = 300/10 = 0.03 [s] Time T = T1 + T2 + T3 + T4 [s] [s] L 0.5 V (T1 + T3) V T1: Acceleration time and T3: Deceleration time can be found by the following equation.

nozzle size 10, 13, 15 For nozzle size 18, 20 e r t For nozzle size 10, 13, 15 [For ZSE4 spec.]

5, 10, 15, 20, 25, 30 30 25 5, 10, 15, 20, 25, 30, 40 60 32 5, 10, 15, 20, 25, 30, 40 60 40 5, 10, 15, 20, 25, 30, 40 60 Courtesy of Steven Engineering, Inc. !

Calculation example) T1 to T4 can be calculated as follows. L Speed: V [mm/s] a1 a2 T1 = V/a1 = 300/3000 = 0.1 [s], T3 = V/a2 = 300/3000 = 0.1 [s] Time [s] T = T1 + T2 + T3 + T4 [s] L 0.5 V (T1 + T3) V T1: Acceleration time and T3: Deceleration time can be obtained by the following equation.

,T2Inverter pump 6.3.1 Option T1, T2Inverter pump With option T1 or T2, the pump output set value can be changed.

(For F, L, S, T & T1 kits) D-Side End Plate Assembly 2. U-side end plate assembly part no.