SMC Corporation of America
Elite Part Number Search
Search Results "MGQM12-50-M9NWM"

Bore size(mfn) Standard stroke(mm) MGOftl Slide bearing MGor12, rc 10, 20, 30, 40, 50 MGOr2o,2s 20, 30, 40, 50, 75, 100 25, 50, 75, 100 MGOL Ball bush bearing MGOr32,40, 50, 63, 80,1OO . intermediate stroke As to intermediate stroke (5, 10, 15, 20, 30, 35 )' spacer of 5, 10' 15,20mm width will be used (Example) MGOM50-10 is produced by installing 1smm spacel in MGQM50'25 Consult factory when

Compact Guide Cylinder/With Air Cushion Series MGQ 12, 16, 20, 25 32, 40, 50, 63 80, 100 Replacement Procedure is P.333 Construction MGQM12 to 25 MGQM32 to 100 Actuators Modular F.R.L. Pressure Control Equipment Air Preparation Equipment Industrial Filters Replacement Procedure Actuators Modular F.R.L.

1000 1000 80 80 100 100 63 63 50 50 40 40 80 80 100 100 100 100 63 63 50 50 Load mass m [kg] Load mass m [kg] 32 32 [Example] 50 50 40 40 32 32 10 10 1 100 500 1000 1 100 500 1000 400 300 200 400 300 200 Maximum speed V [mm/s] Maximum speed V [mm/s] Graph m Graph v 0.5 MPa P 0.5 MPa P 1000 1000 80 80 100 100 63 63 50 50 40 40 80 80 100 100 63 63 50 50 40 40 100 100 32 32 Load mass m [kg

P 1000 1000 80 80 100 100 63 63 50 50 40 40 80 80 100 100 63 63 50 50 40 40 100 100 32 32 Load mass m [kg] Load mass m [kg] 50 50 32 32 10 10 1 100 500 1000 1 100 500 1000 400 300 200 400 300 200 Maximum speed V [mm/s] Maximum speed V [mm/s] 6 Cylinder with Lock Double Acting, Single Rod 32, 40, 50, 63, 80, 100 MWB Series RoHS How to Order 50 B 40 MWB With auto switch MDWB M9BW B 40 50

(n 2) (n = 2, 4, 6, 8) Note 3) 145 + 50 (n 4) 2 (n = 4, 8, 12, 16) Note 4) 115 + 50 (n 4) 2 (n = 4, 8, 12, 16) Note 4) 125 + 50 (n 4) 2 (n = 4, 8, 12, 16) Note 4) 135 + 50 (n 4) 2 110 + 50 (n = 4, 8, 12, 16) Note 4) Different surfaces (n = 4, 8, 12, 16) Note 4) n 75 + 50 (n 2) (n = 2, 3, 4) 90 + 50 (n 2) (n = 2, 4, 6, 8) Note 3) 115 + 50 (n 2) (n = 2, 4, 6, 8) Note 3) 125 + 50 (n

(Same surface) 70 + 50 (n 2) n = 2, 4, 6, 8 75 + 50 (n 2) n = 2, 4, 6, 8 80 + 50 (n 2) n = 2, 4, 6, 8 85 + 50 (n 2) n = 2, 4, 6, 8 90 + 50 (n 2) n = 2, 4, 6, 8 55 + 50 (n 2) n = 2, 3, 4 With 1 pc. 70 75 80 85 90 10 With 2 pcs.

surfaces (n = 2, 4, 6, 8, ) Note 1) 20 + 50 (n 2) 2 (n = 4, 8, 12, 16, ) Note 2) 90 + 50 (n 4) 2 100 + 50 (n 4) 2 (n = 4, 8, 12, 16, ) Note 2) 110 + 50 (n 4) 2 (n = 4, 8, 12, 16, ) Note 2) D-B59W n Same surface 75 + 50 (n 2) (n = 2, 3, 4, ) 90 + 50 (n 2) (n = 2, 4, 6, 8, ) Note 1) 100 + 50 (n 2) (n = 2, 4, 6, 8, ) Note 1) 110 + 50 (n 2) (n = 2, 4, 6, 8, ) Note 1) 1 15 90 100 110

D Lever type models Caution RS (D) 32/40/50-L RS (D) 32/40/50-B RS (D) 32/40/50-C RS (D) 32/40/50-D RS (D) 32/40/50-E Mounting base 1. Do not allow a pallet to collide with the cylinder when the lever is upright.

40 48.5 43 50 43 85 95 80 50 50 55.5 50 56 51 57 51 59 93.5 104 100 59 59 63 59 63.5 58.5 65 58.5 70 104 114 The auto switches listed below cannot be mounted on 63.

63 80 100 Note 1) D-A9/A9V models cannot be mounted on 50.

-CG1RN25 11-CG1RN32 11-CG1RN40 11-CG1RN50 11-CG1RN63 50 63 20 25 32 40 50 63 1/4 Non-lube Double acting, 25, 50, 75, 100, 125, 150 Single rod 25, 50, 75, 100, 125, 150, 200 1/8 25, 50, 75, 100, 125, 150, 200, 250, 300 1/4 Specifications Suction Flow Rate of Vacuum Suction Type (Reference values) Bore size (mm) Item 20 25 32 40 50 63 Size Suction flow rate L/min (ANR) 20/25/32/40 50/63 1.5

Standard Strokes Bore size (mm) Standard strokes (mm) 20 32 40 50 63 5, 10, 15, 20, 25, 30, 35, 40, 45, 50 5, 10, 15, 20, 25, 30, 35, 40, 45, 50, 75, 100 5, 10, 15, 20, 25, 30, 35, 40, 45, 50, 75, 100 10, 15, 20, 25, 30, 35, 40, 45, 50, 75, 100 Hydraulic Fluid Compatibility 10, 15, 20, 25, 30, 35, 40, 45, 50, 75, 100 80 100 10, 15, 20, 25, 30, 35, 40, 45, 50, 75, 100 Hydraulic fluid Compatibility

75 100 125 150 175 200 300 500 25 50 75 100 250 400 12 20 32 40 50 63 12 equivalent 25 to 150 1 to 150 20 equivalent 25 to 300 1 to 300 Strokes other than standard strokes are available upon request.

SU) S SF A AA YB effective depth YC 2 YA View (mm) AA A AU AV AW AX AY BA BB BC BD BE CA CB D DD DE DF DG FA FB FC FD H J JA JB Size 10 20 30 50 55.4 50 6.6 20 15.5 12 4 9.5 34.5 27.8 60 27 4.5 28.5 45h9 46h9 20H9 6 15H9 8 4 3 4.5 13 6.8 11 6.5 70.8 65 7.6 27.5 16 14 5 12 46 30 76 34 6 30.5 60h9 61h9 28H9 9 17H9 10 6 2.5 6.5 17 8.6 14 8.5 75.4 70 7.6 29 18.5 14 5 12 50 32 84 37 6.5 33.5 65h9

/MGPKM Horizontal Mounting m m MGPKFM12 to 50 L = 50 mm, V = 200 mm/s or less L = 100 mm, V = 200 mm/s or less 100 100 50 50 50 50 32, 40 32, 40 32, 40 10 10 32, 40 25 25 Load mass m [kg] Load mass m [kg] 20 20 25 20 16 16 25 20 12 12 16 1 1 16 12 12 0.1 10 30 50 51 100 200 0.1 10 30 50 51 100 200 Stroke [mm] Stroke [mm] L = 50 mm, V = 400 mm/s L = 100 mm, V = 400 mm/s 100 100 50 50 50 50

25 26 100 101 200 Stroke (mm) Stroke (mm) MGPWL32 to 63, MGPWA32 to 63 (27) L = 50 mm, V = 400 mm/s or less (28) L = 100 mm, V = 400 mm/s or less 100 100 63 63 63 63 63 Load mass m (kg) Load mass m (kg) 63 50 50 50 50 50 10 10 50 40 40 40 40 40 40 32 32 32 32 32 32 1 1 10 50 51 100 101 200 10 50 51 100 101 200 Stroke (mm) Stroke (mm) 510 Compact Guide Cylinder/Wide Type MGPW Series Construction

Standard stroke 6 10 15 20 25 32 40 50 63 6mm 10mm 15mm Port thread type 20mm Bore size 6, 10, 15 Type M thread Rc NPT G Symbol 25mm 32mm Nil 20, 25, 32, 40 40mm TN TF 50, 63 50mm 63mm Standard Stroke Bore size (mm) Standard stroke (mm) Maximum available stroke (mm) 300 6 50, 100, 150, 200 500 10 15 20 50, 100, 150, 200, 250, 300 50, 100, 150, 200, 250, 300, 350, 400, 450, 500 1000 1500 100

(Except 50) MY2 H/HT MY1MW16, 20, 50, 63 MY1CW16, 20, 50, 63 Side port Side port Front port Front port MY3A MY3B L L L L L L R R R R R R MY3M R L R L R R L L Bottom port Bottom port L R Slide table operating direction MY1MW25, 32, 40 MY1CW25, 32, 40 This port cannot be used.

) 20 75 90 100 110 (Different surfaces) 100 + 50 (n 4) 2 (n = 4, 8, 12, 16, ) Note 2) 110 + 50 (n 4) 2 (n = 4, 8, 12, 16, ) Note 2) (n = 2, 4, 6, 8, ) Note 1) 20 + 50 (n 2) 2 90 + 50 (n = 4, 8, 12, 16, ) Note 2) (n 4) 2 D-B59W 75 + 50 (n 2) (n = 2, 3, 4, ) 90 + 50 (n 2) (n = 2, 4, 6, 8, ) Note 1) 100 + 50 (n 2) (n = 2, 4, 6, 8, ) Note 1) 110 + 50 (n 2) (n = 2, 4, 6, 8, ) Note 1) (