5 (R) port] 4 x 7 (For mounting) 1/8 (Pilot port: Upward) 30 (Pitch) P=33 VPA4 Breathing hole SYJA (Station n) (Station 1) 1/8 [Pilot port: Lateral (-P)] VZA VTA 76 53.5 29.5 VGA VPA Dimensions n: Stations 2 3 n L 10 9 8 7 6 5 4 357 VPA3 L1 L2 93 126 159 192 225 258 291 324 80 113 146 179 212 245 278 311 344 Type 21: VV5FA5-21-1-: Common exhaust L2 L1 17.5 20 15 3 P R R 66 2B 2B 2B 2B 2B
812 796 853 837 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 stations Station n L1 L2 1573
-: 562 (0x0232) PF3A802H-L2-: 563 (0x0233) 1: The configuration file can bedownloaded from the SMC website.
The length of the cable between stations (L1, L2 ... Ln) must be 0.5 m or more. 2. The total cable length must be L1 + L2 ... + Ln 50. 3. Please connect terminating connector with PLC. When multiple DRIVERs are connected by MECHATROLINK-II communications cable, a terminating connector must be installed at the final DRIVER. 19 - 3.
11 Work load [lb] 0 2.2 4.4 6.6 8.8 11 Work load [lb] 500 500 500 mm stroke or less 900 mm stroke or less Horizontal mounting Wall mounting Overhang: L2 [mm] Overhang: L2 [mm] 400 400 m 700 mm stroke 300 300 1000 mm stroke 600 mm stroke L2 800 mm stroke 200 200 900 mm stroke 100 100 1000 mm stroke 0 0 Work load [lb] 0 2.2 4.4 6.6 8.8 11 Work load [lb] 0 2.2 4.4 6.6 8.8 11 300 300 250 250
10-32 thread) 1/8MMV-44-22L (Figure 2) signifies a V type 1/8 NPT manifold fitting with two #4 branches and two #2 branches on each row with the second row to the right as viewed from the threaded end. 1 8 1 (Figure 1) 7 16 1 3 8 Typ. 13/16 1 4 1 4 1 8 5 16 5 16 5 16 1 8 1 4 1 4 5 16 3 8 1 8 35/64 7/16 17/32 7/16 Hex Typ. 7 16 75 1/8 M-111 or 1/8 M-222 1/8 M-3 1/8 MM-44222
LVC DIN terminal: D Conduit terminal: T Cable 6 to 12 LVA F S Q 27.5 34 F (Q) LVH LVD LVQ LQ R C U 25 LVN C (44) R E R TI/ TIL G1/2 E PA G1/2 A H D (S) B B A H D 2-P Port size 2-P Port size PAX 2-M Thread depth N 2-M Thread depth N PB L L K K N.C.
thread depth N 2-M, thread depth N L L K K DIN terminal: D Conduit terminal: T Cable 6.8 to 10 F S Q 27.5 (Q) D F 25 C R C (44) R R E G 1/2 E G 1/2 A H D (S) B B A H 2-P Port size 2-P Port size 2-M, thread depth N 2-M L L K K N.C. dimensions (mm) Grommet: G Conduit: C DIN terminal: D Conduit terminal: T P Port size Rc A B C D E F H K L M N Model Note) U Q V R Q R Q R S Q R S 83 22 23 45
5 V, 12 V 12 V Reed switch Solid state switch Relay, PLC Grommet Yes 24 V 5 V, 12 V Diagnostic indication (2-color indication) 12 V A96V A96 5 V Yes (NPN equivalent) 24 V Grommet Relay, PLC A93V A90V A93 A90 100 V 12 V 2-wire No 100 V or less Lead wire length symbols: 0.5 m Nil (Example) M9NW 1 m M (Example) M9NWM 3 m L (Example) M9NWL 5 m Z (Example) M9NWZ Solid state auto switches
A3 End plate mounting MX Mp Mr W My W W MTS W L3 A6 W L1 A2 L2 A4 MY K = 0.6 W Mey Mep CY L2 A4 MG Note) No need to consider this load factor in the case of using perpendicularly in a vertical position.
Dynamic moment Va Calculation example m Operating conditions Cylinder: CYP32 Mounting: Horizontal wall mounting Maximum speed: U = 300 [mm/s] Load mass: m = 1 [kg] (excluding mass of arm section) L1 = 50 [mm] L2 = 50 [mm] L2 L1 Item Load factor n Note 1. Maximum load mass m 1 = m/mmax = 1/5 = 0.20 L2 Review m. L1 2.
Dynamic moment Va Calculation example m Operating conditions Cylinder: CYP32 Mounting: Horizontal wall mounting Maximum speed: U = 300 [mm/s] Load mass: m = 1 [kg] (excluding mass of arm section) L1 = 50 [mm] L2 = 50 [mm] L2 L1 Item Load factor n Note 1. Maximum load mass m 1 = m/mmax = 1/5 = 0.20 L2 Review m. L1 2.
Lead wire length symbols: 0.5 m Nil (Example) M9NW 1 m M (Example) M9NWM 3 m L (Example) M9NWL 5 m Z (Example) M9NWZ Since there are other applicable auto switches than listed, refer to page 26 for details. For details about auto switches with pre-wired connector, refer to pages 1784 and 1785 of Best Pneumatics No. 3.
Dynamic moment MG Va Calculation Example CX m Operating Conditions Cylinder: CYP32 Mounting: Horizontal wall mounting Maximum speed: U = 300 [mm/s] Load mass: m = 1 [kg] (excluding mass of arm section) L1 = 50 [mm] L2 = 50 [mm] D-X L2 L1 20Data Item Load factor n Note 1. Maximum load mass m 1 = m/mmax = 1/5 = 0.20 L2 Review m. L1 M2 = m g (L1 + B) 103 2.
Dynamic moment MG Va Calculation Example CX m Operating Conditions Cylinder: CYV32 Mounting: Horizontal wall mounting Maximum speed: U = 300 [mm/s] Load mass: m = 1 [kg] (excluding mass of the arm section) L1 = 50 [mm] L2 = 50 [mm] D-X L2 L1 20Data Item Load factor n Note 1. Maximum load mass m 1 = m/m max = 1/5 = 0.20 L2 Review m. L1 2.
Maximum load mass m 1 = m/mmax = 1/5 = 0.20 L2 Review m. L1 M2 = m g (L1 + B) 103 2. Static moment m x g = 1 9.8 (50 + 48) 103 Review M2. Since M1 & M3 are not generated, review is unnecessary. = 0.96 [Nm] 2 = M2/M2 max = 0.96/4 = 0.24 M Guide shaft mounting surface L1 B We = 5 x 103 m g U = 5 x 103 1 9.8 300 = 14.7 [N] Me3 = 1/3 We (L2 + A) 103 3.
Maximum load mass m 1 = m/m max = 1/5 = 0.20 L2 Review m. L1 2. Static moment M2 = m g (L1 + B) 103 m x g = 1 9.8 (50 + 48) 103 Review M2. Since M1 and M3 are not generated, review is unnecessary. = 0.96 [Nm] 2 = M2/M2 max = 0.96/4 = 0.24 M Guide shaft mounting surface L1 B We = 5 x 103m g U = 5 x 103 1 9.8 300 = 14.7 [N] Me3 = 1/3 We(L2 + A) 103 3.
x 1/4 Applicable cable O.D. 6 to 12 L Dimension n: Stations Stations Formula L1 = 46 x n + 29 L2 = 46 x n + 14 2 121 106 3 167 152 4 213 198 5 259 244 6 305 290 7 351 336 8 397 382 9 443 428 10 489 474 L L1 L2 Precautions Be sure to read this before handling the products.