SMC Corporation of America
Elite Part Number Search
Search Results "RZQF40TN-50-5"

For more information, please refer to Auto Shift Function on page 5.

1 2 3 4 5 6 7 8 9 10 11 12 13 80 0 5 10 15 20 25 30 35 40 45 50 55 60 Load capacity (N) Load capacity (pounds) 63 300 12.0 280 11.0 Distance from pivot point (inches) 260 Distance from pivot point (mm) 10.0 240 9.0 220 200 8.0 180 7.0 160 6.0 140 5.0 120 100 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 4.00 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Load capacity (N) Load capacity

Thread type Voltage Rc G NPT Nil F N 1 2 3 4 5 6 100VAC (50/60Hz) 200VAC (50/60Hz) 110VAC (50/60Hz) 210VAC (50/60Hz) 24VDC 12VDC Port size Contact P/A regarding other voltages.

Refer to page 5 and 8. 4 Model determination Refer to page 2. Refer to page 5. 5 Selecting accessories sold separately.

3 position cylinder series RZQ provides intermediate stop mechanism. 2 intermediate strokes are possible with only a small extension in total length. First stage stroke can be specified without changing the overall length. High accuracy is achieved by an intermediate stop method of pressing metallic components against each other. A tube rod with a large bore which is 70% the piston diameter

3 position cylinder series RZQ provides intermediate stop mechanism. 2 intermediate strokes are possible with only a small extension in total length. First stage stroke can be specified without changing the overall length. High accuracy is achieved by an intermediate stop method of pressing metallic components against each other. A tube rod with a large bore which is 70% the piston diameter

L1-(3 x P) X = L1 = X = Q2 = M CRJ CRA1 [mm] Size CRB2, CRBU2 Y L2 max Q2 10 5.5 to 8 Y-1 3 15 7.5 to 9 Y-1.5 3, 4 20 9 to 10 Y-1.5 3, 4, 5 30 11 to 13 Y-2 3, 4, 5, 6 40 14 to 15 Y-4.5 3, 4, 5, 6, 8 [mm] CRQ2 Size CRB2 CRBU2 X L1 max Q1 X L1 max Q1 10 7.5 to 14 X-3 3 5.5 to 14 X-1 3 15 10 to 18 X-4 3, 4 7.5 to 18 X-1.5 3 20 12 to 20 X-4.5 3, 4, 5 9 to 20 X-1.5 3, 4 30 14 to 22 X-5 3, 4, 5

: 201 to 300mm 80 40 50 50 20 20 Load weight m (kg) Load weight m (kg) Load weight m (kg) 20 10 10 10 63 63 63 5 5 5 50 50 50 [Example ] 40 40 40 1 1 1 70 100 300 500 1000 70 100 300 500 1000 70 100 300 500 1000 Stroke (mm) Stroke (mm) Stroke (mm) 2.

DGraph (2) Cylinder Output on the Retracting Side (Double acting) 20150 1500 Tube bore size [mm] 100 1000 40 Side load Balance weight 40 50 400 500 32 20 25 30 200 250 300 Operating pressure [MPa] Cylinder output F[N] Load weight [kg] 15 150 Allowable Side Load on the Piston End (Nm) 10 100 Stroke of linear part Size 40 5 10 15 20 25 30 40 50 75 100 4 5 40 50 32 40 14 14 13 13 13 12 12 11

1 10% () ( 60cm 1 ) 10% 3 IDU Series 5-1 5 1 IDX-OM-W014 5 () 60cm 1 2 INOUT INOUT () IDU Series 5-1 5 2 IDX-OM-W014 6 6 6-1 IDU3E IDU4E IDU6E 50Hz 0.32 0.52 0.75 3/min (ANR) (1) m 60Hz 0.37 0.57 0.82 MPa 0.7 55 32 10 580 MPa 0.151.0 24085% AC100V (50/60Hz) AC100/100,11010%(4) V AC200V (50/60Hz) AC200/200,22010%(4) AC230V (50Hz) AC23010%(4) AC100V (50/60Hz) 2.4

-75kPa -80kPa -85kPa 100 Pad diameter (mm) 80 63 50 40 10 30 50 70 100 200 5 7 Lifting force (N) How to read Example: Work load 20 kg (Lifting force: 196 N) Conditions: Desired number of pads 5 pcs.

M36 x 1.5 21 47 50 64 4 Compact Cylinder/ Double Acting: Double Rod Series CQ2W 180, 200 How to Order CQ2WB 180 180 50 50 D D C C Z76 With Auto Switch CDQ2WB With auto switch (built-in magnet) Number of auto switches 2 pcs. Nil S 1 pc. n "n" pcs.

Load in direction of rod extension Load in direction of rod retraction m 0.3MPa Graph 5 F 0.4MPa Graph 6 m 0.5MPa Graph 7 F 19 Cylinder with Lock Series CNG Model Selection Selection Graphs Graph 5 Graph 2 0.3MPaP<0.4MPa 0.3MPaP<0.4MPa 200 200 100 100 40 30 40 50 30 40 50 32 40 25 Load weight: m (kg) Load weight: m (kg) 20 20 20 32 10 10 25 20 5 4 3 5 4 3 2 2 1 1 0.5 100 500 400 300 200

Standard Strokes Bore sizes (mm) Standard strokes (mm) 20 & 25 5, 10, 15, 20, 25, 30, 35, 40, 45, 50 32 5, 10, 15, 20, 25, 30, 35, 40, 45, 50, 75 40, 50, 63, 80, 100 5, 10, 15, 20, 25, 30, 35, 40, 45, 50, 75, 100 Made to Order Pages 22 to 24 Manufacture of Intermediate Stroke Cylinders Hydraulic Fluid Compatibility Intermediate strokes in 5mm increments can be manufactured by installing spacers

11 50 10 Charge time per 10 L t (s) Charge time per 10 L t (s) Charge time per 10 L t (s) 4 9 40 8 3 7 30 6 5 2 20 4 3 1 10 2 1 0 0 0 1.0 1.2 1.4 1.6 1.8 2.0 Pressure increase ratio P2/P1 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2.0 Pressure increase ratio P2/P1 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2.0 Pressure increase ratio P2/P1 VBA10A VBA20A, 22A VBA40A, 42A The time required to charge

connectors, so switching from the F kit (D-sub connector) to the S kit (serial transmission) can be done simply by changing the kit section. 5 6 7 8 9 10 5 6 7 8 9 10 5 6 7 8 9 10 5 6 7 8 9 10 5 6 7 8 9 10 5 6 7 8 9 10 5 6 7 8 9 10 6 7 8 9 10 (Refer to the connector wiring diagram.)

12 12 12 11.5 11.5 Operating range Note) 8 8 8 5 5 5 5.5 5.5 Operating range Note) Operating range Note) Perpendicular electrical entry is not available for 50 and 63.