Printed in Japan. 1st printing October, 1998 D-SMC.L.A. P-84.5 (YG)
Magnet: Built-in, Mounting: Front Flange, Style: Aluminum Tube, Bore Size: 50mm, Thread: NPT, Stroke: 175mm, Option: w/o Rod Boot, Cushion: Both Sides (Air-hydro has No Cushion), Lock Operation: Spring/Air Pressure Lock, Auto Switch: A54--Reed, DC Volt >5<24, AC Volt <200, LED, Lead Wire or Prewied Connector: 3m, Number: 3 pcs.
Magnet: D (Built-in), Mounting: F (Front Flange), Style: Aluminum Tube, Bore Size: 50mm, Thread: TN (NPT), Stroke: 250mm, Option: w/o Rod Boot, Cushion: Both Sides (Air-hydro has No Cushion), Lock Operation: D (Spring/Air Pressure Lock), Auto Switch: M9NAV--Solid State, Water Resist., 3 Wire NPN, Vertical, Lead Wire or Prewied Connector: L (3m)
Magnet: D (Built-in), Mounting: F (Front Flange), Style: Aluminum Tube, Bore Size: 50mm, Thread: TN (NPT), Stroke: 125mm, Option: w/o Rod Boot, Cushion: Both Sides (Air-hydro has No Cushion), Lock Operation: D (Spring/Air Pressure Lock), Auto Switch: M9P--Solid State, Gen. Purpose, 3 Wire PNP, Horizontal, Lead Wire or Prewied Connector: SDPC (0.5m Cord Length, M12-4 Pin Connector)
Magnet: D (Built-in), Mounting: F (Front Flange), Style: Aluminum Tube, Bore Size: 50mm, Thread: TN (NPT), Stroke: 900mm, Option: w/o Rod Boot, Cushion: Both Sides (Air-hydro has No Cushion), Lock Operation: D (Spring/Air Pressure Lock), Auto Switch: M9NW--Solid State, 2-color Indication, 3 Wire NPN, Horizontal, Lead Wire or Prewied Connector: MDPC (1.0m Cord Length, M12-4 Pin Connector)
Magnet: Built-in, Mounting: Front Flange, Style: Aluminum Tube, Bore Size: 50mm, Thread: NPT, Stroke: 250mm, Option: w/o Rod Boot, Cushion: Both Sides (Air-hydro has No Cushion), Lock Operation: Spring/Air Pressure Lock, Auto Switch: M9NAV--Solid State, Water Resist., 3 Wire NPN, Vertical, Lead Wire or Prewied Connector: 3m, Number: -
Magnet: Built-in, Mounting: Front Flange, Style: Aluminum Tube, Bore Size: 50mm, Thread: NPT, Stroke: 125mm, Option: w/o Rod Boot, Cushion: Both Sides (Air-hydro has No Cushion), Lock Operation: Spring/Air Pressure Lock, Auto Switch: M9P--Solid State, Gen. Purpose, 3 Wire PNP, Horizontal, Lead Wire or Prewied Connector: 0.5m Cord Length, M12-4 Pin Connector, Number: -
Magnet: Built-in, Mounting: Front Flange, Style: Aluminum Tube, Bore Size: 50mm, Thread: NPT, Stroke: 900mm, Option: w/o Rod Boot, Cushion: Both Sides (Air-hydro has No Cushion), Lock Operation: Spring/Air Pressure Lock, Auto Switch: M9NW--Solid State, 2-color Indication, 3 Wire NPN, Horizontal, Lead Wire or Prewied Connector: 1.0m Cord Length, M12-4 Pin Connector, Number: -
Magnet: Built-in, Mounting: Front Flange, Style: Aluminum Tube, Bore Size: 50mm, Thread: NPT, Stroke: 200mm, Option: w/o Rod Boot, Cushion: Both Sides (Air-hydro has No Cushion), Lock Operation: Spring/Air Pressure Lock, Auto Switch: F5P--Solid State, Gen. Purpose, 3 Wire PNP, Lead Wire or Prewied Connector: -, Number: -
Magnet: Built-in, Mounting: Front Flange, Style: Aluminum Tube, Bore Size: 50mm, Thread: NPT, Stroke: 50mm, Option: J [Nylon Tarpaulin, Cushion: Both Sides (Air-hydro has No Cushion)], Lock Operation: Spring/Air Pressure Lock, Auto Switch: A54--Reed, DC Volt >5<24, AC Volt <200, LED, Lead Wire or Prewied Connector: -, Number: -
Magnet: D (Built-in), Mounting: F (Front Flange), Style: Aluminum Tube, Bore Size: 50mm, Thread: TN (NPT), Stroke: 175mm, Option: w/o Rod Boot, Cushion: Both Sides (Air-hydro has No Cushion), Lock Operation: D (Spring/Air Pressure Lock), Auto Switch: A93--Reed, DC Volt, AC Volt, LED, Horizontal, Lead Wire or Prewied Connector: L (3m), Number: 3 pcs.
D) In the state of C), adjust shim w so that the arm side block contacts the workpiece. E) Exhaust the air while in the clamped state, and confirm that the clamp arm does not open. 8 CKZT -X2797 -X2798 Relation between shim thickness and clamping force Use this figure as a guide, as there is a tolerance of about 10% in the clamp cylinder body.
D-R Note 3) Options for 2, 6, and 8 can not be specified at the same time. (Ex.) 68 Note 4) Symbols 9, D, J can not be specified at the same time. (Ex.) 9-D-J Note 5) For products with auto-drain, either symbol D or J cannot be specified at the same time because of female threads (3/8 or 1/8), for connection to drain piping.
Enter together in order, counting from station 1 on the D side.
Magnet: D (Built-in), Mounting: D (Double Clevis), Tube: 125~160 Aluminum (with or w/o magnet);180~200 Steel (w/o magnet),Aluminum (w/magnet);250 Steel, Bore Size: 160mm, Thread: TN (NPT), Stroke: 600mm, Option: Cushion at Both Ends, Cylinder Switch Type: A96--Reed, DC Volt, LED, Horizontal, 0.5M, Lead Wire or Pre-wired Connector: L (3m Lead Wire), Number: 2 pcs.
Fluid passage dia.: P R J K 2 x L H I O 4 x Sa Thread depth Sb G M N A D F Vacuum flow Dust bag When dust bag is mounted E T Suction air Suction air Discharge air B C C U Hose band V Note 1) (mm) A 158 B 70 C 50 D 20 E F 24.5 G 60.5 H 5 I 70 J 60 K 5.5 L 72 M 37 N 2 O 30 P Rc1/4 Q R 59 Sa Sb T 500 U 250 V 310 Model ZH30--X185 ZH40--X185 28.5 146.5 M4 x 0.7 10 203 90 64 25 27.2 33.5 196.8
Configuration One thermo-chiller for one master. 2 2 R D R D 3 3 S D S D 5 5 S G S G Master This product Do not connect any wire to other PIN numbers. Fig. 3-13 Connection of RS-232C HRL Series 3.3 Installation 3-27 HRX-OM-W060 Chapter 3 Transport and Setting Up 3.4 Piping Connect piping firmly.
Configuration One thermo-chiller for one controller. 2 2 R D R D 3 3 S D S D 5 5 S G S G Controller Master This product Do not connect any wire to other PIN numbers. Fig. 3-13 Connection of RS-232C 3.3.10 Ethernet Modbus/TCP Communication wiring This product can operate the following by Ethernet Modbus/TCP communication.
Configuration One thermo-chiller for one master. 2 2 R D R D 3 3 S D S D 5 5 S G S G Master This product Do not connect any wire to other PIN numbers. Fig. 3-14 Connection of RS-232C 3.3.10 Ethernet Modbus/TCP Communication wiring This product can operate the following by Ethernet Modbus/TCP communication.