SMC Corporation of America
Elite Part Number Search
Search Results "NALT-5-IS-2"

Total Land Area: 55,647m 2 Floor Space: 23,022m 2 Total Land Area: 124,227m 2 Floor Space: 17,204m 2 Tohno Factory (Iwate Prf.) Total Land Area: 60,638m 2 Floor Space: 10,622m 2 Tsukuba Factory (Ibaragi Prf.)

4 @2 u o !3 @4 e !5 !1 r u @2 @3 !3 @4 e !2 MXH16/20 (16, 20) @0 y @1 !7 w q!9 t !8 i !0 !1 r u @2 @3 !3 @4 e !2 Component Parts Description Material Note Description Material No. q w No. !2 !3 !4 !5 !

VAC ERR ERR ERR ERR Note) Stations are counted starting from the D side. 50 56 D side U side 1 2 . stations 50 9 3 (8) 6.5 6.5 Dimensions in inch are noted in parentheses. 1 1 82 89.5 SUP, VAC z port 3 3 (6, 1/4") 40 40 EXH, ATM c port 25 25 (6, 1/4") 2 2 2 5 5 OUT x port (4, 5/32") Breathing hole Note) 3.7 (M3 x 0.5) Note) For dimensions of the cable connector, refer to single unit on page

Black (Opaque) Translucent Translucent Translucent 50 m 100 m 2 m Straight Inch O.D. size 5/32" Inch O.D. size 5/16" O.D. 3.2 mm is available in 1/8 inch (3.18 mm) tubing.

For 115 VAC and 230 VAC, the allowable voltage is 15% to +5% of rated voltage.

Also, if pipe tape is used, leave 1.5 to 2 thread ridges exposed at the end of the threads . 8 Wrap this way Sealant tape Sealant tape Leave 2 threads exposed. Fig. 2 Sealant tape 2-5.

BBA2: D-A7/A8/F7/J7 The above stainless steel screw kit is used for auto switch D-F7BAL and D-F7BAVL when it is shipped mounted on a cylinder. Also, BBA2 is included when a auto switch alone is shipped. 9-13-10 10 Series MLU Plate Cylinder with Lock Construction !4 !7 !0 !4 @1 u q !3 !2 @6 t @4 w @8 r !1 @5 @3 @2 e !

Example 1) When the pressure in the rear and the front of the cylinder differs: Example 2) When the air supply is cut off and releasing the inlet pressure to the atmosphere, the residual pressure release of the outlet side can be ensured for a safety purpose. 12 1 1 2 2 1 2 1 3 1 2 1 L 14 2 4 12 10 5 1 3 How to Order Refer to page 65 for size 10.

2 Piston seal NBR !3 C J G5-S Wear ring Resin !4 Cylinder tube gasket NBR !5 CV Rod seal NBR !6 It is very difficult to disassemble the cylinder bore size 50 or larger, because of very high torque. Please contact our sales branch when seal replace is required.

L Dimension (mm) n (stations) Dimension 2 3 4 5 6 7 8 9 10 L1 44 66 88 110 132 154 176 198 220 L2 53 75 97 119 141 163 185 207 229 L3 62 84 106 128 150 172 194 216 238 2 stns. x 1 Manifold composition 2 stns. + 3 stns. 2 stns. x 2 + 3 stns. 2 stns. + 3 stns. x 2 2 stns. x 2 + 3 stns. x 2 3 stns. x 1 2 stns. x 2 3 stns. x 2 3 stns. x 3 Note) Manifold base is consisted of the junction of 2

P. 12-6-17 12-6-5 5 Series MHK2 Construction Double acting Single acting @0 e !8 !7 w o Open condition Normally open !9 t y !5 !6 i u q r !1 !0 Closed condition Normally closed !2 !3 !4 Component Parts Material Material Note Note No. q w e No. i o !0 !1 !2 !3 !4 !

Note 2) '-02T'for manafold number is alway6 side porl srle unless manifold is exclu{ively bollom-ported. Nole 3) ll mixtur is both port sze and localion, iollow thl6 example: NWSFR3-o1T-04M-M; lhen specily individually. (See note 2.) .I" END "B Er{O "4" El|D o c c o o c o st noit I Srrlro[ 2 $rl|oir ! STA!|O|{ a @ World Wide QS\E Support...

Power supply voltage Internal voltage drop Leakage current Load impedance Load voltage at OFF = x 2 pcs. x Load voltage at ON = x 2 pcs. = 24V 4V x 2 pcs. = 16V = 1mA x 2 pcs. x 3k = 6V Example: Load impedance is 3k Leakage current from switch is 1mA Example: Power supply is 24VDC Internal voltage drop in switch is 4V 19 Clamp Cylinder with Lock Series CLK1 Magnet Field Resistant 2 Color

2 i r i t y w w e !0 !0 !2 !5 o !0 !4 q q y u !1 !3 r t !1 M5 type U10/32 type M5 type U10/32 type !1 y !2 u !4 !3 i !5 u e r r t w e o !0 i o q q t y !0 !2 w !

Center of gravity .12 4.Product Specifications .13 4-1.Magnet Gripper .13 4-2. 3-port solenoid valve .14 4-3. Auto switch .15 5.Operating method or operation .16 5-1Precautions for Design .16 5-2. Installation .17 5-3. Air supply .22 5-4. Piping .22 5-5. Operating environment .23 5-6. Lubrication .23 6. Maintenance or inspection .23 6-1. Maintenance or inspection .23 6-2.