SMC Corporation of America
Elite Part Number Search
Search Results "RZQF63TN-300-200"

VCS Series Lead wire length 20 30 40 Class 2 Class 3 Class 4 300 mm 600 mm 1000 mm 1500 mm 3000 mm Nil L1 L2 L3 L4 Clip Voltage 1 2 3 4 36 100 VAC 200 VAC 110 VAC 220 VAC 230 VAC Note) Grommet type only Electrical entry Flat head screwdriver Courtesy of Steven Engineering, Inc.-230 Ryan Way, South San Francisco, CA 94080-6370-Main Office: (650) 588-9200-Outside Local Area: (800) 258-9200-

CM2 Bore size (in) Model no. 150 (1.5") 200 (2") 250 (2.5") 325 (3/25") 400 (4") D-A5, D-F5 D-A6, D-J5 NBT-150 NBT-200 NBT-200 NBT-325 NBT-325 CG1 Courtesy of Steven Engineering, Inc.-230 Ryan Way, South San Francisco, CA 94080-6370-Main Office: (650) 588-9200-Outside Local Area: (800) 258-9200-www.stevenengineering.com MB MB1 Connector type M8-3 pin M8-4 pin M12-4 pin 1 2 1 4 CA2 2 1 Pin

CM2 Bore size (in) Model no. 150 (1.5") 200 (2") 250 (2.5") 325 (3/25") 400 (4") D-A5, D-F5 D-A6, D-J5 NBT-150 NBT-200 NBT-200 NBT-325 NBT-325 CG1 MB MB1 Connector type M8-3 pin M8-4 pin M12-4 pin 1 2 1 4 CA2 2 1 Pin arrangement CS1 3 4 4 3 3 C76 JIS C 4524, JIS C 4525, IEC 947-5-2, NECA 0402 300 m/s2 Applicable standards Impact resistant IP degress of protection Insulation resistance Withstand

VAC For single phase 200 VAC L1 CNP1 NFB MC CNP3 L1 CNP1 NFB MC CNP3 Single phase 200 to 230 VAC Three phase 200 to 230 VAC L2 L2 U U U Motor V U Motor V L3 L3 V V W M N () W M N W W P1 P1 PE PE P2 P2 CNP2 CNP2 P (+) P Regeneration option Regeneration option C C D D Detector Detector CN2 CN2 L11 L11 L21 L21 Note) For single phase 200 to 230 VAC, power supply should be connected to L1 and

250 0 50 100 150 200 250 Supply pressure (kPa) Supply pressure (kPa) Detection side piping: 6 x 4 tubing 5 m Detection nozzle: 1.5 Detection side piping: 6 x 4 tubing 5 m Detection nozzle: 1.5 0.6 0.4 0.5 mm 0.25 mm 0.5 Detection distance (mm) Detection distance (mm) 0.3 0.4 0.3 0.2 0.15 mm 0.2 0.15 mm 0.1 0.1 0.03 mm 0.01 mm 0 0 0 50 100 150 200 250 0 50 100 150 200 250 Supply pressure

(Option) Foot bracket and manifold mounting possible. 9.9 mm2 SA Maximum frequency (Mechanical operation type) 300 c.p.m. or less Not required (Use turbine oil class 1 ISO VG32, if lubricated.)

Item XL -25 XL -40 XL -50 XL -63 XL -80 Rated heater voltage 90 to 125VAC 200/10 200/20 400/40 400/60 600/100 Heater power W (nominal value) In-rush/Normal (Option symbol) H1 80C (176F) 200/40 200/60 400/100 600/150 H2 100C (212F) 200/30 400/70 400/80 600/130 800/180 H3 120C (248F) Note) In-rush current will flow to the heater for approximately 30 seconds and will then subside.

Mounting: F (Front Flange), Bore Size: 63mm, Thread: TN (NPT Thread), Full Stroke: 25mm, First Stroke: 20mm

Mounting: F (Front Flange), Bore Size: 63mm, Thread: TN (NPT Thread), Full Stroke: 25mm, First Stroke: 5mm

Mounting: F (Front Flange), Bore Size: 63mm, Thread: TN (NPT Thread), Full Stroke: 50mm, First Stroke: 40mm

Mounting: F (Front Flange), Bore Size: 63mm, Thread: TN (NPT Thread), Full Stroke: 125mm, First Stroke: 100mm

Cylinder (Tube) Inner Diameter(φ): 63, Stroke(mm): 50/40, Cylinder Operation Method: [Double Acting] Double Acting, Rod Operation Method: Single Rods, Main Body Shape: [Block Shape] Block shape, Additional Function: With Intermediate Stop Function / Stroke with Adjustment, Environment, Applications: Standard, End Locking: No, Valves: No, Operating Pressure(MPa): 0.1~1.0, Support bracket:

Cylinder (Tube) Inner Diameter(φ): 63, Stroke(mm): 125/100, Cylinder Operation Method: [Double Acting] Double Acting, Rod Operation Method: Single Rods, Main Body Shape: [Block Shape] Block shape, Additional Function: With Intermediate Stop Function / Stroke with Adjustment, Environment, Applications: Standard, End Locking: No, Valves: No, Operating Pressure(MPa): 0.1~1.0, Support bracket

3 position cylinder series RZQ provides intermediate stop mechanism. 2 intermediate strokes are possible with only a small extension in total length. First stage stroke can be specified without changing the overall length. High accuracy is achieved by an intermediate stop method of pressing metallic components against each other. A tube rod with a large bore which is 70% the piston diameter

Mounting: F (Front Flange), Bore Size: 63mm, Thread: TN (NPT Thread), Full Stroke: 100mm, First Stroke: 50mm