MOperation sequence diagram M Operation sequence diagram 4 output points Two-time hitting only for CH2 ON for 1 s OFF for 2 s Stop signal ONt For CH1 OFFt CH2 OFFt CH3 Power supply ON time CH4 2 s 1 s tA tA 1 s CH1 2 s 2 s 2 s 2 s OFFt 1 s 1 s 1 s 1 s CH2 2 s Two-time hitting 1 s CH3 2 s 1 s CH4 Power switch ON (Output start) Power switch OFF (Output stop) Cascade Connection (Multiple-board
Rc C4SL-36W-A G NPT C4SL-36W(Z)-A 2 23 Semi-standard symbol Semi-standard: 2 Semi-standard: 23 (7) Part No. Piping port thread ty pe Piping port thread ty pe (7) Part No. Rc G NPT C4SL-2(Z)-A Rc G NPT C4SL-23(Z)-A C4SL-2-A C4SL-23-A Appearance and part No. -13- 8 38 Semi-standard symbol Semi-standard: 38 Semi-standard: 8 (7) Part No.
AT MV MV /F % %, IDH Series 13 1.1 IDX-OM-W038 2. 2 2.1 IDH Series 21 2.1 IDX-OM-W038 2. 2.2 2.2.1 (1) 1. (85%) 2. 3. 4. 5. 1535050 6. 7. () 8. 9. 10. 11. 2000m 12. 13. 14. 15. 16.
Remove the hexagon socket head cap screws (11). 2. Hold either body A (1) or body B (2), and separate the body A and B by pushing the vane shaft (3) out. 3. Take out the vane shaft (3), stoppers (4) and (5).
2 i r i t y w w e !0 !0 !2 !5 o !0 !4 q q y u !1 !3 r t !1 M5 type U10/32 type M5 type U10/32 type !1 y !2 u !4 !3 i !5 u e r r t w e o !0 i o q q t y !0 !2 w !
AF AR 1) 2 3 1) () 2) 5 3) 4) 5 5) 6) 7 2-2. 1) 2) 3) 4) 5) 6) 7) 8) , 9) 10) 3 11) 12) () 13)/ 14) 8 1 P142. 2 3 4 5 6 7 2-3. 1 2) 3 4 5 9 1 P14[2. ] fR[N] [mm] 1. 2 3 10 4 51 1.
[White] Blue [Black] Black [White] Load Switch 1 Switch 1 Switch 1 Relay Load Relay contact Blue [Black] Blue [Black] Brown [Red] Brown [Red] Brown [Red] Relay Black [White] Black [White] Blue [Black] Black [White] Switch 2 Switch 2 Switch 2 Blue [Black] Blue [Black] The indicator lights will light up when both switches are turned ON. 2 wire with 2 switch AND connection 2 wire with 2 switch
[White] Blue [Black] Black [White] Load Switch 1 Switch 1 Switch 1 Relay Load Relay contact Blue [Black] Blue [Black] Brown [Red] Brown [Red] Brown [Red] Relay Black [White] Black [White] Blue [Black] Black [White] Switch 2 Switch 2 Switch 2 Blue [Black] Blue [Black] The indicator lights will light up when both switches are turned ON. 2 wire with 2 switch AND connection 2 wire with 2 switch
[White] Blue [Black] Black [White] Load Switch 1 Switch 1 Switch 1 Relay Load Relay contact Blue [Black] Blue [Black] Brown [Red] Brown [Red] Brown [Red] Relay Black [White] Black [White] Blue [Black] Black [White] Switch 2 Switch 2 Switch 2 Blue [Black] Blue [Black] The indicator lights will light up when both switches are turned ON. 2 wire with 2 switch AND connection 2 wire with 2 switch
0.8 to 37.1 1.8 to 92.7 4 to 186 8 to 371 Instantaneous CFM x 10-2 CFM x 10-2 CFM x 10-2 CFM x 10-2 Setting/Display flow range flow CO2 0.8 to 18.5 1.8 to 46.3 4 to 93 8 to 185 CFM x 10-2 CFM x 10-2 CFM x 10-2 CFM x 10-2 Min. setting/display unit 0.1 CFM x 10-2 0.1 CFM x 10-2 1 CFM x 10-2 1 CFM x 10-2 Accumulated Setting/Display flow range 0.0 to 9.0 0.0 to 9.9 0 to 9 0 to 9 ft3 x 10-1 ft3
AF10-A AF20-A 30 27 22 5.4 8.4 40 2.3 28 AF30-A 41 35 23 6.5 13 53 2.3 30 AF40-A 50 52 26 8.5 12.5 70 2.3 35 AF40-06-A 50 52 25 8.5 12.5 70 2.3 34 AF50-A 70 66 35 11 13 90 3.2 47 AF60-A 70 66 35 11 13 90 3.2 47 Dimension:B of auto-drain and optional bowl assembly Optional C D Semistandard 2 6 8 C 6C J 2J 6J 8J CJ 6CJ W 6W 2 6 8 C 6C 2 6 8 AF10-A 59.3 59.9 77.9 77.9 77.9 AF20-A 87.4 87.6
steel 2 11 *Snap ring Stainless steel 2 12 *Piston nut Stainless steel 1 13 *Plain washer Stainless steel 2 14 Wear ring Resin 1 15 Rod seal NBR 1 16 Cushion seal Urethane 2 17 Piston seal NBR 1 18 Cushion valve seal NBR 2 19 Cylinder tube gasket NBR 2 20 Piston gasket NBR 1 21 Magnet (1) 26 - Figure -5 Mounting bracket: Single clevis (C) Table -14 Parts list (The item with * mark is different
Specifications 2. Installation and Handling P4 2-1. Air supply 2-2. Design 2-3. Mounting and Installation 2-4. Environment 2-5. Speed control 2-6. Allowable kinetic energy 2-7. Air cushion 2-8. Control direction 2-9-1.Mounting brackets 2-9-2.Auto switches 3. Maintenance P25 3-1. Checks 3-2. Replacement of seals 3-3. Consumable parts 3-4. Troubleshooting 4.
Ionizer . 8 1-2. Accessories. 8 1-3. Option . 10 2. Procedures to Operation . 10 3. Installation and Wiring . 11 3-1 Installation . 11 3-1-1. Precautions for Installation . 11 3-1-2. Installation of Ionizer . 12 3-2. Wiring . 13 3-2-1. Connection Circuit . 13 3-2-2. Wiring of the Power Supply Cable . 15 3-2-3. Wiring of the AC Adapter . 15 3-3. Timingchart . 16 4. Function . 17 4-1.
Core wire colors 31.3 31.3 l 1 2 3 4 5 6 7 8 2 1 Terminal no.
234 LXPB5 5 phase stepper 2 5 6 12 With brake 242 2 5 6 12 Without brake 250 LXSH2 2 phase stepper 2 5 6 12 With brake 258 High rigidity direct acting guide LXS 2 5 6 12 Without brake 266 LXSH5 5 phase stepper 2 5 6 12 With brake 274 CE Marking _ Page 282 Made to Order AC servomotor specification _ 288 Low particulate generation specification _ 294 Construction _ 296 Mounting _ 299
K T 2 X NPN 2 Y PNP 2 A1 A R NPN 2 + 1 () T PNP 2 + 1 A2 B S NPN 2 + 1 V PNP 2 + 1 1 B D + M SI 3 P psi 2 2: 3kPaMPa 1 ( 2m, ) W M5 M5 01 R1/8 N01 NPT1/8 C4L 4mm C6L 6mm -8No.PS-OMU0005CN-C / A ZS-46-A1 38L (2 ) B ZS-46-A2 38L (2 ) ZS-46-B + ZS-46-D ZS-46-5F 5 2 m ZS-27-01 R1/8 ZS-46-N1 NPT1/8 ZS-46-N2 4mm ZS-46-C4L 6mm ZS-46-C6L -9No.PS-OMU0005CN-C OUT1 LCD OUT2
Therefore, the return to the origin is required.*1 Rotating direction reference *1 In-line:1 In-line:1 In-line:1 1: Normal direction 2: Reverse direction Parallel:2 Parallel:2 Parallel:2 Sets the level of followability of acceleration/deceleration. Followability to the acceleration becomes loose as the setting value increases.
M2 M3 m2 m3 m4 10 15 25 1 2 1 2 2 2 1.4 CY1F 1.5 3 1.5 5 5 5 2 14 20 14 12 12 12 12 The above values are the maximum allowable values for moment and load. Refer to each graph regarding the maximum allowable moment and maximum allowable load for a particular piston speed.
2 !0 !8 w $4 t e $2 !5 $3 y!7 @8 !4 !