Put a flat washer (8 x 3.3) through a hexagon socket head screw (with spring washer, M3 x 0.5 x 5 l) and passing through the hole of a switch mounting bracket, then turning it lightly down to a mounting nut of switch. (2 locations) 5.
In principle, this function counts each time there is a rise or fall in either of the A or B phase pulses. 2 1 Amplification/ Interpolation circuit Counter A phase B phase Magnetic resistance element Piston rod Magnet Count 1 2 3 4 5 6 7 8 9 10 .
Note 2) The above values should be used as a guide for detection at stroke end.
Excessive load will be applied to the piston rod, resulting in damage to the actuator and a reduced service life of the product. Model EQY16 EQY25 EQY32 Lead A B C H A B C H A B C Work load [kg] 1 1.5 3 1 2.5 5 10 2 4.5 9 18 9.
D-Y5/Y6 D-Y7P/Y7PV D-Y7W D-Y7WV D-Y7BAL D-A5 D-A6 D-A3 D-A44 D-G39 D-K39 D-F5W D-J59W D-F5BAL D-F5 D-J5 D-F59F Auto switch model D-A9 D-A9V D-A59W D-F5NTL A A A A A A B B B A B B B B Bore size 125 140 160 9 7 14.5 13 3 9.5 8 6 13.5 6.5 12 2 8.5 5.5 9 7 14.5 13 3 9.5 8 6 13.5 6.5 12 2 8.5 5.5 9 7 14.5 13 3 9.5 8 6 13.5 6.5 12 2 8.5 5.5 Provided as guidelines for auto switch proper mounting
Seal guide B Slide plate Spacer Hexagon socket head cap screw Side seal unit MYMK-16-A MYMK-25-A MYMK-25-A MYMK-25-A MYMK-16-A Nickel plated Seal list 20 No. 12 13 14 15 16 17 18 19 20 Qty. 1 1 2 2 2 2 2 4 2 Description Material 16 25 32 63 40 50 MY20-16A-Stroke Seal belt Dust seal band Scraper Piston seal Cushion seal Tube gasket O-ring O-ring Special resin MY16-16A-Stroke MY25-16A-Stroke
Do not connect the cable with the factory side at this point. 2. Turn OFF the main breaker of this system. 3. Undo the screws (2 pcs.) to remove the front panel. Be sure to use a Phillips screwdriver. 4. Undo the screws (2 pcs.) or press claw to remove the breaker cover. Be sure to use a Phillips screwdriver.
2%4$2$4$5 @4 #0 Section A-A A A $0 $1 #4 #5 #2 @1 $6 $3 Parts list Parts list No. 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 55 56 Description Cylinder tube Body Head cover WR Head cover WL Slide table Piston yoke Piston Wear ring Belt separator Parallel pin Cushion ring Cushion needle Belt clamp Cam follower Eccentric gear Gear fixture Adjustment gear Retaining ring
Do not connect the cable with the factory side at this point. 2. Turn OFF the main breaker of this system. 3. Undo the screws (2 pcs.) to remove the front panel. Be sure to use a Phillips screwdriver. 4. Undo the screws (2 pcs.) to remove the breaker cover. Be sure to use a Phillips screwdriver.
5 7 2 5 3 2 2 3 5 3 1 MHZ2-16 No setting 3 2 4 1 MHZ2-20 MHZ2-25 MHZJ2-10 No setting No setting MHZJ2-16 No setting No setting 3 2 1 MHZJ2-20 MHZJ2-25 Note) "" in the table indicates a skip with no dimension.
Recommended tightening torque Unit: Nm Applicable models AMS20 AMS30 AMS40 AMS60 Part No. of spacer with bracket Y200T-2-D Y300T-2-D Y400T-1-D Y600T-2-D Part No. of spacer Y200-D Y300-D Y400-D Y600-D Tightening torque 0.360.036 1.20.05 1.20.05 2.00.1 When the air management system is fixed on a wall with hexagon socket head cap screws, a hexagonal driver is recommended as a tool.
M6 thread depth 11 2-M6 thread depth 11 15 15 35 18 15 2-M6 thread depth 11 2-M6 thread depth 11 20 20 A 17 17 40 A 20 20 15 45 60 25 45 60 A Applicable clamp cylinder A Applicable clamp cylinder Part no.
Note 2) Use series CY1B if the stroke exceeds 1500 mm with a tube inside diameter of 20 mm.
Vertical Operation 1 2 P2 W A P1 a (b) (a) P0 P0 a A W (1) The speed is controlled with meter-out control. When the meterin controller is used in conjunction with the meter-out controller, lurching is reduced. () (2) Depending on the size pf the load, installing a regulator with check valve at position (a) can decrease lurching during descent, and operation delay during ascent.
For connector cable of M8 connector, refer to page 90. 3 Series SYJ3000 Construction (A) 4 (B) 2 (A) 4 (B) 2 2 position single 2 position double 5 (R) 3 (R) 1 (P) 5 (R) 3 (R) 1 (P) t e q t r w qr w (B) 2 (A) 4 (B) 2 (A) 4 u u 3 (R) 1 (P) 5 (R) 3 (R) 1 (P) 5 (R) y 3 position closed center/Exhaust center/Pressure center 3 position closed center (A) 4 (B) 2 q t r w 5 (R) 3 (R) 1 (P) (B) 2 (
(mm) At the minimum stroke of 25 mm adjustment bolt Basic stroke At maximum stroke adjustment At the minimum stroke of standard adjustment bolt Bore size (mm) Adjustment bolt fixing bolts Tightening torque Adjustment width across flats Bore size (mm) 10 15 25 10 15 25 A 2 A 26 A = 0.8 A = 0.6 A 0 4 M3 1.0 to 1.3Nm A 2 A 26 5 M5 4.6 to 6.2Nm Adjuster holder Adjuster holder A Adjustment bolt
(When the allowable separation is indicated for each cylinder series, use the specified value.) 2) If the internal resistance of a light emitting diode causes a problem, select a switch without an indicator light (Models D-A6, A80, A80H, A90, A90V, C80 and Z80)
A B C D A B C D Bore size (mm) Port aperture A 12 (1) (1) (1) 16 (2) (2) (2) B D 20 (2) (2) (2) View from piston rod end 25 (2) (2) (2) 32 C (2) 40 (2) 50 (2) Operating Range Auto Switch Mounting Bracket/Part No. (mm) Reed switch Solid state switch Applicable switch Auto switch model Bore size Bore size (mm) Mounting bracket part no.
15 to 32 Standard Piping U Q R T ZZ + Stroke Stroke J K SS + Stroke 1 D B M L Z I 1 G 0.2 (G) H A E F (Through) N ( I ) (L) (Z) (G) C NN A B ZZ C D E M F G H I J K L N NN Q R U 2-M5 0.8 thread depth 4 2-M5 0.8 thread depth 4 2-M5 0.8 thread depth 4 2-Rc1/8 thread depth 5 SS T Bore size (mm) 2 2-4.3 through 2 2-8 counterbore with depth 4.3 2 2-5.5 through 2 2-9.5 counterbore with
A + Stroke Note 2) For intermediate strokes, dimensions A, B, C, E, WA, and WB will be the same as the longer of the standard strokes.