Bore Size: 20mm, Thread: ø6-ø20 Bore: M Thread; ø25,ø32 Bore: Rc 1/8, Stroke: 25mm, Auto Switch: Y7PV--Solid State, Gen. Purpose, 3 Wire PNP, Vertical, 0.5M
Compressor operation status Air consumption status Tubing, fittings Couplers Rubber hoses Other 20% 25% 30% 25% Flow rate Air leakage is equivalent to 20 to 50%.
20 CNS 25 CLS 20 25 CLQ 20 MLGP RLQ 1 10 50 51 100 300 200 1 10 50 51 100 300 200 MLU Stroke (mm) Stroke (mm) ML1C (27) l2 = 50 mm V = 400 mm/s (28) l2 = 100 mm V = 400 mm/s D50 50 -X 100 100 100 100 80 80 80 2063 80 63 63 Data 63 50 50 50 50 10 10 Load weight m (kg) 40 40 40 40 32 32 32 32 25 25 25 25 20 20 20 20 1 1 0.5 10 50 51 100 300 200 0.5 10 50 51 100 300 200 Stroke (mm) Stroke (
20 CNS 25 CLS 20 25 CLQ 20 MLGP RLQ 1 10 50 51 100 300 200 1 10 50 51 100 300 200 MLU Stroke (mm) Stroke (mm) ML1C (27) l2 = 50 mm V = 400 mm/s (28) l2 = 100 mm V = 400 mm/s D50 50 -X 100 100 100 100 80 80 80 2063 80 63 63 Data 63 50 50 50 50 10 10 Load weight m (kg) 40 40 40 40 32 32 32 32 25 25 25 25 20 20 20 20 1 1 0.5 10 50 51 100 300 200 0.5 10 50 51 100 300 200 Stroke (mm) Stroke (
MY1CW16/20 MY1MW16/20 MX B A MTS Reed Switch Solid State Switch D-A90(V), D-A93(V), D-A96(V) (mm) D-M9N(V), D-M9P(V), D-M9B(V) D-F9NW(V), D-F9PW(V), D-F9BW(V) MY 16 20 Mounting position 16 20 Mounting position Mounting position 16 20 93 94 A A A 73 74 70 90 CY 107 106 B B B 87 86 90 110 6.5 7 8.5 6.5 Operating range Note) Operating range Note) Operating range Note) 11 7.5 MG CX MY1MW25/32
Bore size (mm) 20 32 50 63 80 Bore size (mm) 20 32 50 63 80 Contents Part no.
Bore size (mm) 20 32 50 63 80 Bore size (mm) 20 32 50 63 80 Contents Part no.
is at least 10 to 20 times the workpiece weight.
MM L1 E1 E1 L1 NDH10 NX U1 ND H10 NZ MM R1 U1 R1 NX A A1 32 40 50, 63 80 100 32 40 50, 63 80 100 M10 x 1.25 M14 x 1.5 M18 x 1.5 M22 x 1.5 M26 x 1.5 20 22 28 40 40 30 40 50 65 65 14 19 24 26 26 20 22 28 40 40 30 40 50 60 60 12 16 19 24 34 34 M10 x 1.25 M14 x 1.5 M18 x 1.5 M22 x 1.5 M26 x 1.5 10 11 14 20 20 16 19 24 34 34 40 50 64 80 80 10 10 14 22 22 14 14 20 30 30 28 28 40 60 60 10 10 14
(different sides, same side) Solid state switch 20 25 Y7BW(V) 1pc. 2pcs. (different sides, same side) 20 30 D-Y7BAL 1pc. Center trunnion is not included.
(Nm) ML2B/M1 (Pitch moment) ML2B/M2 (Roll moment) ML2B/M3 (Yaw moment) Pitch moment M1/M1e 10 20 40 Roll moment M2 1.2 2.4 4.8 Yaw moment M3/M3e 3.0 6.0 12 MI W S 40 Model 20 30 YES 20 5 4 3 10 ML2B25 ML2B32 ML2B40 CEP1 If speed or load changes, stopping time may vary and positioning accuracy may be compromised.
(Nm) ML2B/M1 (Pitch moment) ML2B/M2 (Roll moment) ML2B/M3 (Yaw moment) Pitch moment M1/M1e 10 20 40 Roll moment M2 1.2 2.4 4.8 Yaw moment M3/M3e 3.0 6.0 12 MI W S 40 Model 20 30 YES 20 5 4 3 10 ML2B25 ML2B32 ML2B40 CEP1 If speed or load changes, stopping time may vary and positioning accuracy may be compromised.
Description Material 40 NLP-40A PDU-16Z PSD-22 x 16 P44 DSM-20 CA40-1606 CA40-1601 P3 50 NLP-50A PDU-20Z PSD-27 x 20 P50 DSM-25 CA63-1608 CA50-1602 P3 63 NLP-63A PDU-20Z PSD-27 x 20 P60 DSM-25 CA63-1608 CA63-1603 P3 100 NLP-100A PDU-30Z PSD-38 x 30 P90 DSM-35 CA100-1610 CA100-1605 P5 Piston seal Rod seal A Rod seal B Brake piston seal Cushion seal Piston gasket Tube gasket Cushion valve seal
500 1000 1500 0.1 100 200 300 400 500 1000 1500 100 200 300 400 500 1000 1500 100 200 300 400 500 1000 1500 Piston speed (mm/s) Piston speed (mm/s) Piston speed (mm/s) Piston speed (mm/s) ML2B/M1 (Pitch moment) ML2B/M2 (Roll moment) ML2B/M3 (Yaw moment) 30 40 20 20 5 4 3 10 10 5 4 3 ML2B40 ML2B40 2 5 4 3 Moment (Nm) Moment (Nm) Moment (Nm) 2 ML2B32 ML2B32 1 ML2B40 ML2B40 ML2B40 ML2B40 2
15 15 16 16 20 20 22 22 28 35 The standard stroke for 12 and 16 is 100 st.
20 2 pcs. 5 10 15 10 20 15 Auto Switch Mounting Bracket Part Nos.
Example) For setting the gripping force to be at least 20 times the work weight; Required gripping force = 0.05 kg x 20 x 9.8 m/s2 = 10 N min.
Example) For setting the gripping force to be at least 20 times the work weight; Required gripping force = 0.05 kg x 20 x 9.8 m/s2 = 10 N min.