SMC Corporation of America
Elite Part Number Search
Search Results "ISE2L-T1-55C"

Option symbol T1 Inverter Pump Mounted HRR010 20 T1 Inverter pump mounted Possible to choose an inverter pump in accordance with users piping resistance Cooling capacity will decrease by heat generated in the pump. The inverter pump does not use a mechanical seal. The 50 Hz and the 60 Hz inverter pumps have the same capacity.

-A3 ZP3A-T1-B3 ZP3A-T1-A6-B3 ZP3A-T3-A5 ZP3A-T3-B5 Note 1) ; in the table indicates the pad material.

-A3 ZP3A-T1-B3 ZP3A-T1-A6-B3 ZP3A-T3-A5 ZP3A-T3-B5 Note 1) ; in the table indicates the pad material.

Note 2) Splash proof specification is not available for F and T1.

Time [s] LEC SS-T T1 T2 T3 T4 T1 = V/a1 [s] T3 = V/a2 [s] LEC Y T2: Constant speed time can be found from the following equation.

(For F, L, S, T & T1 kits) D-Side End Plate Assembly 2. U-side end plate assembly part no.

Calculation example) T1 to T4 can be calculated as follows. L Speed: V [mm/s] a1 a2 T1 = V/a1 = 300/10 = 0.03 [s], T3 = V/a2 = 300/10 = 0.03 [s] Time T = T1 + T2 + T3 + T4 [s] [s] L 0.5 V (T1 + T3) V T1: Acceleration time and T3: Deceleration time can be found by the following equation.

Calculation example) T1 to T4 can be calculated as follows. L Speed: V [mm/s] a1 a2 T1 = V/a1 = 300/3000 = 0.1 [s], T3 = V/a2 = 300/3000 = 0.1 [s] Time [s] T = T1 + T2 + T3 + T4 [s] L 0.5 V (T1 + T3) V T1: Acceleration time and T3: Deceleration time can be obtained by the following equation.

,T2Inverter pump 6.3.1 Option T1, T2Inverter pump With option T1 or T2, the pump output set value can be changed.

Average suction flow rate V x 60 T1 V x 60 T1 Q = Q = + QL T2 = 3 x T1 T2 = 3 x T1 Q : Average suction flow rate /min (ANR) V : Piping capacity () T1 : Arrival time to stable Pv 63% after adsorption (sec.) T2 : Arrival time to stable Pv 95% after adsorption (sec.) QL : Leakage at work adsorption /min (ANR) 2.

Average suction flow rate V x 60 T1 V x 60 T1 Q = Q = + QL T2 = 3 x T1 T2 = 3 x T1 Q : Average suction flow rate /min (ANR) V : Piping capacity () T1 : Arrival time to stable Pv 63% after adsorption (sec.) T2 : Arrival time to stable Pv 95% after adsorption (sec.) QL : Leakage at work adsorption /min (ANR) 2.

Typ. 7/8 1 5/64 5 8 Hex 3/8 1 3/32 1 7/16 5/8 7/8 11/16 40 1/8 T2 1/2 1/8 T2 1/8 T4 1/8 T6 1/8 T3 1/8 T1 1/8 T5 1/8 T8 1/8 T4-90 1 1/16 Note: Reducing Tees available with other barb combinations #1 7/8 17 32 7 16 7 16 Hex Typ. 27 32 #3 1 3/32 3/4 3/8 Typ. 7/8 9 16 7 16 #2 #4 27/32 3/4 41 1/8 T2 x 3 1/8 RT3 x 1 1/8 T3 x 3 1/8 T1 x 3 1/8 T4 x 3 1/8 RT4 x 2 7/16 7/16 17/32 9/16 19/32

Adsorption Response Time with the Formula Adsorption response times T1 and T2 can be obtained through the formulas given below.

Determine the mean suction flow: Q r = v x 6 o T1 9 9 0 . s : s : : P o o . g u o.z T 2 = 3 1 o 1 mean suction flow required from ejector (N/min), 0.1 0.2 0.3 0.5 0.7 1 2 3 | 5 7 10 20 30 50 70 100 O T1 i(sec) o1 adsorption response time to 63% to P, (sec), T1 adsorption response time to 95% of P" (sec), T2 1 l lncnnic System Specif ication (continued) 2.

-25 NPN output NPN open collector 30V, 80mA, residual voltage: 1V or less ZSE401 T1-26 Vacuum Analog output 1~5V (+ 5%F.S.), load impedance : 1k ZSE401 T1-65 PNP output PNP open collector 80mA ISE4L01 T1-25 Positive Pressure NPN output NPN open collector 30V, 80mA, residual voltage: 1V or less ISE4L01 T1-26 100kPa Analog output 1~5V (+ 5%F.S.), load impedance: 1k ISE4L01 T1-65 (14.5PSI) Type

Determine the mean suction flow: Q r = v x 6 o T1 9 9 0 . s : s : : P o o . g u o.z T 2 = 3 1 o 1 mean suction flow required from ejector (N/min), 0.1 0.2 0.3 0.5 0.7 1 2 3 | 5 7 10 20 30 50 70 100 O T1 i(sec) o1 adsorption response time to 63% to P, (sec), T1 adsorption response time to 95% of P" (sec), T2 1 l lncnnica System Specif ication (continued) 2.

T1 = V/a1 = 1000/2500 = 0.4 [s], T1 T2 T3 T4 11LEJS T3 = V/a2 = 1000/2500 = 0.4 [s] L: Stroke [mm](Operating condition) V: Speed [mm/s](Operating condition) a1: Acceleration [mm/s2](Operating condition) a2: Deceleration [mm/s2](Operating condition) T = T1 + T2 + T3 + T4 [s] L 0.5V(T1 + T3) V 25AT2 = T1: Acceleration time and T3: Deceleration time can be obtained by the following equation

Symbol Symbol Applicable tubing size (inch) 2 3 4 5 6 Fitting type Symbol T1 T2 T3 T4 Class No.

Time [s] Method 2: Calculation T1 T2 T3 T4 T5 T6 Cycle time T can be found from the following equation. L : Stroke [mm] V : Speed [mm/s] a1: Acceleration [mm/s2] a2: Deceleration [mm/s2] T = T1 + T2 + T3 + T4 [s] Calculation example) T1 to T4 can be calculated as follows. T1 and T3 can be obtained by the following equation.