SMC Corporation of America
Elite Part Number Search
Search Results "PF3W540S-N04-2-GR"

28.6 12.4 63.8 1.2 55.8 24 AS431F-04-12SD AS431F-N04-11SD 22 36.3 61.7 20.9 12 16.2 49.4 55.3 52 26.8 3/8" 17.9 25.8 21 32.6 19.4 1/2" NPT 1/2 23.8 21.7 29 26.8 63.8 1.2 55.8 12.4 AS431F-N04-13SD 19.4 52 36.3 58 22 Reference dimensions of M5 x 0.8, R threads after installation.

For 10 grease pack part no.: GR-F-005 (5 g) for external sliding part GR-S-010 (10 g) for tube interior For 15 grease pack part no.: GR-S-010 (10 g) O-ring NBR O-ring NBR Cushion seal NBR 168 Sine Rodless Cylinder/Linear Guide Type Series REAH Single axis type: 20, 25 Construction Single axis type: 20, 25 Actuators Modular F.R.L.

Grease pack part no.: GR-S-010 (10 g) Piston seal 2 Set of left nos. !3, !4, !5. Rod seal NBR 1 Gasket 1 61

42.1 AS431FG-04-12 AS431FG-N04-11 36.3 60.8 54.4 22 32.6 52 49.4 26.8 12 21.7 3/8" 17.9 25.8 105 19.4 104 21 16.2 NPT 1/2 56.7 49.2 49.6 42.1 29 23.8 AS431FG-N04-13 57.1 36.3 52 1/2" 21.7 26.8 106 22 19.4 Note 1) Reference dimensions Note 2) Reference dimensions of M5 x 0.8, R threads after installation.

42.1 AS431FG-04-12 AS431FG-N04-11 36.3 60.8 54.4 22 32.6 52 49.4 26.8 12 21.7 3/8" 17.9 25.8 105 19.4 104 21 16.2 NPT 1/2 56.7 49.2 49.6 42.1 29 23.8 AS431FG-N04-13 57.1 36.3 52 1/2" 21.7 26.8 106 22 19.4 Note 1) Reference dimensions Note 2) Reference dimensions of M5 x 0.8, R threads after installation.

-11 33.6 47.9 100 21 33.6 47.9 18.5 17.9 10 3/8" 21 100 NPT 1/2 23.8 25.4 28.6 50.1 57.6 25.4 24 57.6 49.6 50.1 49.6 42.1 42.1 R 1/2 28.6 AS421FG-04-12 AS421FG-N04-13 35.2 49.5 101 22 34.6 48.9 20.9 21.7 12 1/2" 22 101 Reference dimensions of M5 x 0.8, R threads after installation.

2) (n = 2, 4, 6, 8)1 95 + 100 (n 2) (n = 2, 4, 6, 8)1 100 + 100 (n 2) (n = 2, 4, 6, 8)1 105 + 100 (n 2) (n = 2, 4, 6, 8)1 110 + 100 (n 2) (n = 2, 4, 6, 8)1 1 60 65 75 80 85 2 (Different surfaces) 70 75 80 85 2 (Same surface) n (Different surfaces) 70 + 30 (n 2) (n = 2, 4, 6, 8)1 75 + 30 (n 2) (n = 2, 4, 6, 8)1 80 + 30 (n 2) (n = 2, 4, 6, 8)1 85 + 30 (n 2) (n = 2, 4, 6, 8)1 D-A44 n

[White] Blue [Black] Black [White] Switch 1 Load Switch 1 Switch 1 Relay Load Relay contact Blue [Black] Blue [Black] Brown [Red] Brown [Red] Brown [Red] Relay Black [White] Black [White] Blue [Black] Black [White] Switch 2 Switch 2 Switch 2 Blue [Black] Blue [Black] The indicator lights will light up when both switches are turned ON. 2-wire with 2 switch AND connection 2-wire with 2 switch

(Rod cover side) 2 pcs. (Different sides) 2 pcs.

4 types Combination of applicable chart A 1 A 2 C 8 C59 Chart 1, 2, 7 A 2 A24 C10 C60 Chart 1, 2, 7 Combination is available only when all the conditions are fulfilled in the combination chart.

Specifications 2. Installation and Handling P7 2-1. Air supply 2-2. Design 2-3. Mounting and Installation 2-4. Environment 2-5. Speed control 2-6. Cushion 2-7. Control of direction 2-8. Auto switches 3. Maintenance P16 3-1. Checks 3-2. Replacement of seals 3-3. Consumable parts 3-4. Troubleshooting 4. Basic Circuit for Cylinder Operation P24 5.

GR-R-010(10g) 1 2 3) , 4 7 1 100 4 3g 1cm 1 2 100mm 7. 4. g 20 25 32 40 (mm) 100st 2 3 3 34 50st 0.5 0.5 0.5 1 19 3-2-4. 1) 8 8 2(9) 9 3) , 6 1mm 8. 9. 20 3-3. 3-3-1.

Specifications 2. Installation and Handling P4 2-1. Air supply 2-2. Design 2-3. Mounting and Installation 2-4. Environment 2-5. Speed control 2-6. Allowable kinetic energy 2-7. Control of direction 2-8. Auto switches 3. Maintenance P18 3-1. Replacement of rod seal 3-2. Checks 3-3. Consumable parts 4. Made to order product (XC85, X446) P21 4-1. Food Machinery Grease Specification 4-2.

2 Label protector Cushion seal Urethane PET !

2 Label protector Cushion seal Urethane PET !

Specifications 2. Installation and Handling P4 2-1. Air supply 2-2. Design 2-3. Mounting and Installation 2-4. Environment 2-5. Speed control 2-6. Allowable kinetic energy 2-7. Air cushion 2-8. Control direction 2-9.Mounting brackets 2-10.Auto switches 3. Maintenance P17 3-1. Checks 3-2. Replacement of seals 3-3. Consumable parts 3-4. Troubleshooting 4.

Specifications 2. Operating method or operation 2-1. Design 2-2. Selection 2-3. Installation 2-4. Air supply 2-5. Piping 2-6. Operating environment 2-7. Lubrication 3. Maintenance 3-1. Precautions 3-2. Disassembly drawing 3-3. Finger assembly set replacement procedure 3-4. Seal replacement procedure 3-5.