P.287 P.289 P.290 P.290 P.290 P.290 P.290 P.297 P.297 P.301 P.304 P.306 P.306 P.306 P.310 P.311 P.311 P.312 P.312 P.312 P.315 P.316 P.316 P.316 P.317 P.318 P.319 P.319 P.319 P.324 P.325 P.326 P.329 P.333 P.333 P.333 P.337 P.339 P.340 P.343 P.348 P.351 P.351 P.356 P.358 P.361 P.362 P.364 P.367 P.371 P.371 P.374 P.385 P.385 P.387 P.387 P.390 P.392 P.393 P.394 P.395 P.396 CJP2 MGPW Pin Cylinder
Keeper plate Air release GA GB R J H 2-Rc P CDH9/f8 MM C D E e Width across flats G l 10 f Air release SS + Q + l + Stroke W W CX U +0.4 +0.1 NA T NB ZZ + Q + l + Stroke L K F S + Stroke MA B RR SS + Stroke A ZZ + Stroke (mm) With rod boot Stroke range (mm) Bore size (mm) l e CX J B C F GA GB NA NB P R S T CD RR SS L U W f Q B-rod C-rod B-rod C-rod 32 M10 x 1.25 52 58 38 16 32 15 37 31 3
Ml0 X l ' It ~jath across fl ats 14 I W\dt~ acro ss fl ats 12 \lj ~ I W ,r~ --~ o ,..---. NM iniature tube fitling (Serie s M5) Width across flats 7 ~ ~~~S~ _ M5 ) 0 , >.2:1 'B ~ ~ ,...!
D 2.8 x P First tentative bore size determination 0.3 x Wcos + Wsin D 5.0 x P 0.3 x W + W D 5.0 x P W W > Wv P > Pv Determination of allowable load weight & pressure (Refer to page 25 for vertical operation.)
D1.6x P First tentative bore size determination 0.1xWcos+Wsin D5.0x P 0.1xW+W D5.0x P W W>WV P>PV Determination of allowable load weight & pressure Inclined operation (Refer to p. 39 for vertical operation.)
10 16 12 4 MXQ-CT12(L)-X11 15 32 G MXQ-CT12(L)-X12 25 42 B C MXQ-CT16(L) 5 23 J MXQ16(L) M10 x 1 M5 x 12 MXQ-CT16(L)-X11 15 33.5 35.5 20 12 17 14 5 33 MXQ-CT16(L)-X12 25 43 A K MXQ-CT20(L) 5 27 MXQ20(L) MXQ-CT20(L)-X11 M5 x 14 M12 x 1.25 15 41 44.5 25 23 37 13 17 6 MXQ-CT20(L)-X12 25 47 MXQ-CT25(L) 5 30 MXQ25(L) M14 x 1.5 M6 x 18 MXQ-CT25(L)-X11 15 40 49 53.5 31 15 28 19 6 MXQ-CT25(L)-X12
: A22 Symbol: A26 Symbol: A23 T W1 L L L L CP95 RD 30 DA 30 30 DA H1 H1 DA E NCM H1 Symbol: A5 Symbol: A6 Symbol: A7 Symbol: A8 30 DB DB NCA B C1 H B C T B RD T X LA H C1 DW X L H C1 X L X L K L LB -X W E L 30 30 30 L DC 30 Symbol: A30 Symbol: A29 Symbol: A28 Symbol: A27 20L L H1 Data 30 30 30 30 H1 W H1 DA E DA W Symbol: A9 Symbol: A10 Symbol: A11 Symbol: A12 X C0.5 R sphere T T C1
Nil Y M5 x 0.8 M6 x 1 (Option) Pilot valve Vacuum switch electrical entry Nil DC: 1 W (With indicator light: 1.05 W) AC Nil L Lead wire length 0.6 m Grommet type Lead wire length 3 m C Lead wire length 0.6 m CL Lead wire length 3 m Y DC: 0.45 W (With indicator light: 0.5 W) Connector type CN Without connector (Without lead wire) 24 VDC and 12 VDC are applicable to 0.45 W.
M5 X 40 l M5 X 45 l M5 X 50 l M5 X 55 l M5 X 60 l M5 X 65 l M5 X 70 l M5 X 75 l M5 X 80 l M5 X 85 l 40 45 50 55 60 65 70 75 80 85 M3 X 30 l M3 X 35 l M5 X 40 l M3 X 45 l M5 X 50 l M3 X 55 l 30 35 40 45 50 55 6.5 8.5 Note 1) The appropriate plain washer must be used for through-hole mounting.
D 5.0 x P First tentative bore size determination 0.1 x W + W D 5.0 x P W W > WV P > PV Determination of allowable load weight & pressure Inclined operation W WV P PV (For vertical operation, refer to page 10-2-79.)
Inclined operation Vertical operation Horizontal operation Review of load weight and operating pressure First tentative bore size determination W D 1.6 x P First tentative bore size determination 0.1 x Wcos + Wsin D 5.0 x P First tentative bore size determination 0.1 x W + W D 5.0 x P W W > WV P > PV Determination of allowable load weight & pressure Inclined operation W WV P PV
SX VK L C3 (3.2) C4 (4) C6 (6) M5 (M5 thread) VZ C6 (6) kit VF VFR N1 (1/8) N3 (5/32) N7 (1/4) N7 (1/4) VP7
M4 X 0.7 NTJ-010A M5 X 0.8 NTJ-015A Refer to p.1.3-12 for details of the mounting nut.
F E Y2 F Y2 CRQ2X MSQX L L E MRQ 2 x Q4 2 x Q4 K K C B D G D G B C U H U H M T N M T 25.5 N (34.5: Connector type) 2 x R 1 2 x R Auto switch P P W1 W Auto switch Size: 20, 30 Size: 40 W W 2 67 8 15 8 When D-M9m is used 32.5 1.
W D 1.6 x P 0.1 x W + W D 5.0 x P 20Data W W > Wv P > Pv Determination of allowable load weight & pressure Inclined operation (For vertical operation, refer to page 8-15-64.)
N L ZZ + Stroke LS + Stroke N L CBM2G Bore size Stroke A Head flange: * -H -R -W Rod flange: CBM2F Bore size Stroke A * -H -R -W N L Z + Stroke Single clevis: CBM2C Bore size Stroke A -H -R -W N L Double clevis: CBM2D Bore size Stroke A -H -R -W N L ZZ + Stroke Z + Stroke + 1.2 0 + 1.2 0 ZZ + Stroke Z + Stroke + 1.2 0 + 1.2 0 CBM2U Bore size Stroke A Rod trunnion: * -H -R -W N L CBM2T
(mm) <M5> <M5> Note) Weight (g) Model D1 P A M D2 L 2-applicable tubing M5 x 0.8 KJU23-M5 KJU23-01S KJU04-M5 KJU04-01S KJU06-M5 KJU06-01S 5.9 8.3 6.4 8.8 7.4 9.9 Reference dimensions after R thread installation.
Basic Style Bore size (mm) Stroke range (mm) A B C D E G H K1 K2 L P Th9 Z F I J M N Q W 12 5 to 30 37.2 30.2 10 M3 x 0.5 M5 x 0.8 6 6 25 1.5 5.2 5 3.5 32 15.5 3.5 15 15 0 0.043 16 5 to 30 38 31 10 M4 x 0.7 M5 x 0.8 8 8 3.5 29 1.5 6 6 38 20 3.5 15 20 0 0.052 20 5 to 50 43 34 9.5 M5 x 0.8 M5 x 0.8 7 10 4.5 36 2 47 8 8 25.5 5.5 17.5 13 0 0.043 25 5 to 50 47 37 11 M6 x 1.0 M5 x 0.8
R)EB 25 15 Work load: W [kg] Work load: W [kg] 20 Lead 12: LEFS25(L/R)EA 10 15 Lead 12: LEFS25(L/R)EA 10 Lead 20: LEFS25(L/R)EH 5 Lead 20: LEFS25(L/R)EH 5 0 0 0 100 200 300 400 500 600 0 200 400 600 800 1000 1200 Speed: V [mm/s] Speed: V [mm/s] LEFS32(L/R)/Ball Screw Drive Horizontal Vertical 30 50 Lead 8: LEFS32(L/R)EB Lead 8: LEFS32(L/R)EB 40 Work load: W [kg] Work load: W [kg] 20 30 Lead
Table Displacement (Reference Value) W L 0.08 LEFS32 (L = 30 mm) 0.06 Displacement [mm] LEFS25 (L = 25 mm) 0.04 LEFS16 (L = 20 mm) LEFS40 (L = 37 mm) 0.02 0 0 22.5 [100] 44.9 [200] 67.4 [300] 89.9 [400] 112.4 [500] Load W lbf [N] Note 1) This displacement is measured when a 15 mm aluminum plate is mounted and fixed on the table.