Ground 4-7-11 12 Series VT317 How to Use DIN Terminal 1.
300 150 200 250 300 30 50 100 350 400 450 500 50 100 350 400 450 500 LEY25 LEY16 LEY32 LEY32 LEY25 LEY16 / P.38 6.3 <> NPNPNP LEY16B-100 NPN -11- 2.3. 28 28 29 30 29 30 / 14 14 15 15 25 26 27 25 26 27 11 11 12 12 19 19 21 21 18 18 16 16 22 22 24 24 17 17 12 13 12 13 23 23 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 20 20 34 33 35 32 31 1 21 2 22 3 23 4 24 5 25 6
CSA C22.2 No. 0-M91, CSA C22.2 No. 94-M91, CSA C22.2 No. 142-M1987, CSA C22.2 No. 157-92, CSA C22.2 No. 213-M1987, CSA C22.2 No. 60079-0:11, CSA C22.2 No. 60079-11:11, CSA C22.2 No. 60079-15:12, CSA C22.2 No. 60529:05, ANSI/ISA 60079-0: 2009, ANSI/ISA 60079-11: 2012, ANSI/ISA 60079-15: 2012, FM 3600 November 1998, FM 3610 October 1999, FM 3611 October 1999, FM 3810-2005, ANSI/ NEMA 250:1991
CCW [CCW] 11() 2 22 =() 34 48 11() 3 22 =() 34 48 * 10.
(650) 588-9200-Outside Local Area: (800) 258-9200-www.stevenengineering.com 9 16 32 VQZ 17 4 VQD 10 4 10 P = 11 L2 36.5 41.5 L1 45 M plug connector (M) D side U side Stations 1 2 3 4 5 n Direct manual override (Non-locking) 2n-C4, M5 4(A), 2(B) port C4: One-touch fitting for 4 M5: M5 thread 2(B) 2(B) 27.5 20 15 4(A) 4(A) 5 46 12.5 P = 11 L plug connector (L) Dimensions n: Stations n L 11
2 3 4 5 n U side VDW23-GVDW23-GVDW23-GVDW23-G70 31.5 21 18.5 (OUT port) n-1/8 n-M5 x 0.8 11 P = 22 11 4.5 1.5 54 6 32 6 (19.5) 9.5 11 9.5 11 4-M4 x 0.7 46 10 24 10 When w/o bracket, M3 threads at both ends (4 positions) can be used for other purposes.
150 500 250 250 824 846 (mm) A 531 570 494 527 B 444 479.8 444 479.8 C 3/8 1/2 3/8 1/2 D Note) 519 543 Booster regulator model The length may be longer than the specification if the plugs mounted on the tank are not fit to the end.
SET-ON 10 Start readiness signal CN2 24V DC + COM 1 COM 11 NO. 0 Indicates operation in progress when ON. ON when program is being executed and when returning to the home position. 2 BUSY 11 Operating signal NO. 1 12 NO. 2 3 When this signal is OFF, an alarm is being generated for the actuator/controller.
DI unit, 54 mm will be added for increasing every 1 pc.) 2 L n Dimensions n: Station (Maximum 24 stations) 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 L1 L2 68.5 84.5 100.5 116.5 132.5 148.5 164.5 180.5 196.5 212.5 228.5 244.5 260.5 276.5 292.5 308.5 324.5 340.5 356.5 372.5 388.5 404.5 420.5 218 234 250 266 282 298 314 330 346 362 378 394 410 426 442 458 474 490 506 522 538
DI unit, 54 mm will be added for increasing every 1 pc.) 2 L n Dimensions n: Station (Maximum 24 stations) 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 L1 L2 68.5 84.5 100.5 116.5 132.5 148.5 164.5 180.5 196.5 212.5 228.5 244.5 260.5 276.5 292.5 308.5 324.5 340.5 356.5 372.5 388.5 404.5 420.5 218 234 250 266 282 298 314 330 346 362 378 394 410 426 442 458 474 490 506 522 538
15 11 9.5 11 14 11 9.5 11 14 11 7.5 10 13 10 8.5 9 13 9 ML1C D-A5/A6 9 D-A59W 13 9 DD-A3/A44 D-Y59/Y69 D-Y7P/Y7V D-Y7W/Y7WV 5.5 6.5 7.5 7 5.5 5.5 -X D-Y7BAL 5 4.5 4 3.5 3.5 3.5 20D-F5/J5 D-F5W/J59W D-F5BAL/F5NTL D-F59F 4.5 4.5 4.5 4 4 3.5 Data D-G39/K39 11 11 11 10 9 4 4 4.5 4 4.5 9 D-P5DWL Since this is a guideline including hysteresis, not meant to be guaranteed.
15 11 9.5 11 14 11 9.5 11 14 11 7.5 10 13 10 8.5 9 13 9 ML1C D-A5/A6 9 D-A59W 13 9 DD-A3/A44 D-Y59/Y69 D-Y7P/Y7V D-Y7W/Y7WV 5.5 6.5 7.5 7 5.5 5.5 -X D-Y7BAL 5 4.5 4 3.5 3.5 3.5 20D-F5/J5 D-F5W/J59W D-F5BAL/F5NTL D-F59F 4.5 4.5 4.5 4 4 3.5 Data D-G39/K39 11 11 11 10 9 4 4 4.5 4 4.5 9 D-P5DWL Since this is a guideline including hysteresis, not meant to be guaranteed.
Foot, Flange, Single clevis: Body mounting bolt Double clevis: Clevis pin & Cotter pin Refer to page 6-7-11. 25, 50, 75, 100, 125, 150, 175, 200, 250, 300, 350, 400, 450, 500, 600 Piston area (mm2) Bore size (mm) Piston area (mm2) Bore size (mm) 63 32 63 675 2804 25, 50, 75, 100, 125, 150, 175, 200, 250, 300, 350, 400, 450, 500, 600, 700, 800 80 40 80 1082 4568 50 100 1651 7223 25, 50, 75
Foot, Flange, Single clevis: Body mounting bolt Double clevis: Clevis pin & Cotter pin Refer to page 6-7-11. 25, 50, 75, 100, 125, 150, 175, 200, 250, 300, 350, 400, 450, 500, 600 Piston area (mm2) Bore size (mm) Piston area (mm2) Bore size (mm) 63 32 63 675 2804 25, 50, 75, 100, 125, 150, 175, 200, 250, 300, 350, 400, 450, 500, 600, 700, 800 80 40 80 1082 4568 50 100 1651 7223 25, 50, 75
5 300 200 LEY32 Motor mounting position: Top/Parallel 200 W /60 (Motor rotation speed) (3600 rpm) (2400 rpm) A 16 1000 640 B 8 500 320 C 4 250 160 LEY32D Motor mounting position: In-line 200 W /60 (Motor rotation speed) (3750 rpm) (2400 rpm) A 20 1000 800 600 500 B 10 500 400 300 250 C 5 250 200 150 125 LEY63 Motor mounting position: Top/Parallel, In-line 400 W /60 (Motor rotation speed
Station 9 SQ SOL.B SOL.A 23 10 Station 10 SOL.A VFS SOL.B 24 11 Station 11 SOL.B SOL.A 25 12 Station 12 VFR VV5Q21 COM. () Orange Red (+) 13 VQ7 Positive COM spec. Negative COM spec. The total number of stations is tabulated starting from station one on the D-side. Note) When using the negative common specifications, use valves for negative common. (Refer to page 419.)
EMC (2) EMC EMC MCCB MC 1 4 L1 (1) 2 5 (1) L2 3 6 L3 E L11 L21 ( (RSPD-250-U4) () (2) (2) (RSPD-250-U4) (OKAYA) 1 2 3 1. AC200V240VL1L3L2 2. 11 29 11.
11 16 10 72 94 50 36 5 20 45 16 50 CS1 100 110 60 115 12 11 20 10 55 20 89 41 5 25 113 60 C76 Mounting style (E) C85 C95 CP95 NCM NCA D-X 20Bore size (mm) d2 CK S5 K1 K2 l3 G1 l1 G2 EM G3 CA H6 R1 Data 32 11 10 38 51 10 21 18 26 31 32 10 6.6 7 8 40 11 12 41 54 10 24 22 28 35 36 11 6.6 9 10 50 15 12 50 65 12 33 30 32 45 45 12 9 11 12 63 15 16 52 67 14 37 35 40 50 50 15 9 11 12 80 18 16 66
11 16 10 72 94 50 36 5 20 45 16 50 CS1 100 110 60 115 12 11 20 10 55 20 89 41 5 25 113 60 C76 Mounting style (E) C85 C95 CP95 NCM NCA D-X 20Bore size (mm) d2 CK S5 K1 K2 l3 G1 l1 G2 EM G3 CA H6 R1 Data 32 11 10 38 51 10 21 18 26 31 32 10 6.6 7 8 40 11 12 41 54 10 24 22 28 35 36 11 6.6 9 10 50 15 12 50 65 12 33 30 32 45 45 12 9 11 12 63 15 16 52 67 14 37 35 40 50 50 15 9 11 12 80 18 16 66